Case Summary (BLD) | | | 5/14/2012 | | DONE |
|
|
|
|
Permanent Occupancy | | | 7/30/2010 | | DONE |
Tisha Gallop
|
|
|
On 11/8/06 tenant should have been issued a certificate of occupancy upon final inspection not a letter of compliance.
|
Case Summary (BLD) | | | 4/14/2008 | | DONE |
|
|
|
|
BLD-Conference | 11/8/2006 | 11/9/2006 | 11/9/2006 | A | DONE |
Jim Sly
|
|
|
Internet Inspection Request from: Patricia Smith
|
BLD-Final | 11/8/2006 | 11/9/2006 | 11/8/2006 | A | PASS |
Jim Sly
|
|
|
blane; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles OK for Perm Occ. :)
|
Code Occupancy Approval | | | 11/8/2006 | | PASS |
|
|
|
|
Letter of compliance | | | 11/8/2006 | | DONE |
|
|
|
Letter of Compliance issued 11-8-06.
|
COD-Stop Work/Reinspection DR | 6/12/2006 | 6/12/2006 | 7/10/2006 | P | DONE |
Carol Montgomery
|
|
|
paid under case # cod06-00918 customer receipt # 3200300000000010018
|
BLD-Final | 6/5/2006 | 6/6/2006 | 6/6/2006 | A | NR |
Jim Sly
|
|
|
Phone #: Blaine ###-#### Talked to Blaine....trying to get a variance landscape rock in leiu of bark.......Need Code enforce final......Blaine said that they didn't do any HVAC and Electrical was existing. They didn't run any new circuits.
|
FIRE-Final Inspection | 6/1/2006 | 6/2/2006 | 6/2/2006 | P | PASS |
Troy Cobbley
|
|
|
Life safety finaled
|
FIRE-Final Inspection | 5/31/2006 | 6/1/2006 | 6/1/2006 | P | CANC |
Troy Cobbley
|
|
|
Scheduled by a contractor via Hello! on 5/31/2006 at 2:30:06 PM. Contact: ###-####. per blaine tanner change time
|
FIRE-Final Inspection | 5/23/2006 | 5/23/2006 | 5/24/2006 | P | FAIL |
Troy Cobbley
|
|
|
don coatworth ; Phone #: ###-#### Two doors have been added that are not shown on the plans. All of the exits require exit discharge lighting and the plans call for the doors that cars come through to have panic hardware but they do not. Contractor is going to resubmit to John Menard with plan review and inspection will be called back in.
|
BLD-Final | 5/15/2006 | 5/16/2006 | 5/16/2006 | A | FAIL |
Dave Hannah
|
|
|
blaine tanner -call 1st before insp; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie needs fire life/safty and code enforcement finals
|
BLD-Framing/Rough-in | 3/27/2006 | 3/27/2006 | 3/27/2006 | P | PASS |
Jim Sly
|
|
|
Blaine Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong
|
BLD-Energy code compliance | 3/10/2006 | 3/13/2006 | 3/13/2006 | P | PASS |
Tom Arcoraci
|
|
|
Blaine -- insulation and suspended ceiling; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong insul ok
|
BLD-Energy code compliance | 3/7/2006 | 3/8/2006 | 3/8/2006 | A | NR |
Jim Sly
|
|
|
Blaine -- efis stucco insp and insulation; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong Insulaters need to install approved vapor barreir that meets flame and smoke.
|
BLD-Framing/Rough-in | 2/16/2006 | 2/16/2006 | 2/16/2006 | P | PASS |
Jim Sly
|
|
|
Blaine; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong All framing pass
|
BLD-Foundation | 1/24/2006 | 1/25/2006 | 1/25/2006 | A | PART |
Jim Sly
|
|
|
Kenyon; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong Found wall at E. 1/2 of front of bldg OK pend MTI special insp, tests and appr.
|
BLD-Footing | 1/20/2006 | 1/24/2006 | 1/24/2006 | A | PART |
Jim Sly
|
|
|
STS Contractors; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa Foot at E. 1/2 of front of Bldg.......OK pending MTI insp, tests, and approvals.
|
BLD-Conference | 1/11/2006 | 1/11/2006 | 1/12/2006 | P | DONE |
Jim Sly
|
|
|
kenyon--; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
Issue PAID IN FULL permit | | | 1/4/2006 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 12/23/2005 | | DONE |
|
|
|
|
Print Occupancy Form | | | 12/23/2005 | | DONE |
|
|
|
|
Telephone call | | | 12/23/2005 | | DONE |
|
|
|
left mess for a jeffery l fisher at ###-####
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/22/2005 | | DONE |
|
|
|
|
Plan Reviewer's activity | | | 12/22/2005 | | PASS |
|
|
|
Reviewed and approved the structural and non-structural resubmittals. JCM
|
Plan assigned to (JCM) | 11/8/2005 | | 12/22/2005 | | PASS |
|
|
|
12/22/2005 09:58:31 JCM - activity updated through activity BLDA022 from case BLD05-03132.
|
Routing - PLAN CHECK | 12/9/2005 | | 12/22/2005 | | PASS |
|
|
|
|
Plan resubmittals received | | | 12/20/2005 | | DONE |
|
|
|
Received 3 copies of plan sheets S-100, S-101 and 2 copies of plan sheets A-001, A-301, A-401 and forwarded to John M.
|
Plan resubmittals received | | | 12/12/2005 | | DONE |
|
|
|
Received 1 transmittal, 1 letter, 3 review comments, 2 cover sheets, 5 copys of sheets A-101, & 2 copys of sheets of A-110,A-301,A-401,A-601 Taken to John M.
|
Routing - FIRE | 11/29/2005 | | 12/9/2005 | | PASS |
|
|
|
|
1st review completed | | | 12/9/2005 | | FAIL |
|
|
|
failed plan check and structural.
|
Routing - PLAN CHECK | 11/21/2005 | | 11/29/2005 | | FAIL |
|
|
|
|
Plan resubmittals requested | | | 11/29/2005 | | DONE |
|
|
|
E-mailed the architect with a copy of the plan review requesting revisions. JCM
|
Plan resubmittals requested | | | 11/28/2005 | | DONE |
|
|
|
Faxed the architect a copy of the structural plan review requesting revisions. JCM
|
Routing Off Site - STRUCTURAL | 11/9/2005 | | 11/25/2005 | | FAIL |
|
|
|
Received an e-mailed plan review from the consulting structural engineer requesting revisions. JCM
|
Routing - PLANNING | | | 11/21/2005 | | PASS |
|
|
|
Approved per DRH05-00297 and as noted.
|
Routing - PLUMBING | 11/16/2005 | | 11/17/2005 | | PASS |
|
|
|
n/a appears to have no plumbing
|
Routing - PUBLIC WORKS | 11/15/2005 | | 11/16/2005 | | PASS |
|
|
|
|
Routing - Erosion and Sediment | 11/16/2005 | | 11/16/2005 | | PASS |
|
|
|
ESC plan waiver request approved with attached conditions.
|
Routing - PLANNING Land Div | 11/9/2005 | | 11/15/2005 | | PASS |
|
|
|
|
Application received | | | 11/8/2005 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 11/8/2005 | | DONE |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 11/8/2005 | | |
|
|
|
|
Fee Review-notes | 11/8/2005 | 11/8/2005 | | | |
|
|
|
|