Case Summary (BLD) | | | 1/25/2016 | | DONE |
|
|
|
|
Third Notice BLD | 6/14/2006 | 6/14/2006 | 9/14/2006 | | DONE |
|
|
|
Second Notice has not been responded to.
|
Second Notice BLD | 5/25/2006 | 5/25/2006 | 6/14/2006 | | DONE |
|
|
|
First Notice has not been responded to.
|
First Notice | | 4/26/2006 | 5/25/2006 | | DONE |
|
|
|
|
Permanent occupancy | | | 4/26/2006 | | DONE |
|
|
|
Perm. Occ. Cert. # 10997 issued 4-26-06 to Proto's Pizza in the BODO Bldg. #4.
|
BLD-Final | 4/25/2006 | 4/25/2006 | 4/25/2006 | P | PASS |
Dave Hannah
|
|
|
Please cal Paul for the final walk through. ok for perm occ
|
BLD-Final | 4/24/2006 | 4/24/2006 | 4/25/2006 | P | NR |
Dave Hannah
|
|
|
Please check with Forrest prior to arrival. This is 1 of 5 to be signed-off later today. Please call Paul if there is a problem. Thanks.
|
Permanent Occupancy | | 4/25/2006 | 4/25/2006 | | DONE |
|
|
|
|
BLD-Final | 3/3/2006 | 3/10/2006 | 3/10/2006 | P | PART |
Dave Hannah
|
|
|
This space should now have a TCO. This has been scheduled in case there was a problem. Please call Paul Fishley to ensure he is ready or disregard this requets if you have already signed off. Thanks-alex Internet Inspection Request from: Alex Monge ok for temp occ ok for perm after shell and core is finaled
|
BLD-Final | 3/9/2006 | 3/10/2006 | 3/10/2006 | A | DEFR |
Dave Hannah
|
|
|
paul; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
|
Temporary occupancy | | | 3/10/2006 | | DONE |
|
|
|
Temp. Occ. Cert. # 5382 issued 3-10-06 to Proto's Pizza in BODO Bldg. #4.
|
FIRE-Final Inspection | 3/9/2006 | 3/9/2006 | 3/9/2006 | P | PASS |
Forrest France
|
|
|
Required corrections have been made, fire life safety passed inspection. Patio gate hardware has not been installed, however data was supplied to indicate the type installed is approved.
|
BLD-Final | 3/3/2006 | 3/9/2006 | 3/9/2006 | P | CANC |
Dave Hannah
|
|
|
The health inspection is at noon on March 9th. There should not be a problem with that sign-off. Please call Paul fishley to schedule time to show up. Hopefully around 2:00 pm Internet Inspection Request from: Alex Monge
|
FIRE-Final Inspection | 3/6/2006 | 3/7/2006 | 3/7/2006 | P | FAIL |
Forrest France
|
|
|
Provide approved hardware at the pocket door per review note #6, post max occ. load sign with the correct number, need to inspect patio gate hardware when installed, knox box cannot be located behind the patio enclosure, the fire extinguisher must be 48" AFF max.
|
BLD-Conference | 2/22/2006 | 2/23/2006 | 2/23/2006 | A | PASS |
Dave Hannah
|
|
|
Ceiling inspection for Proto's. Please call Paul at ###-####. Thanks. Internet Inspection Request from: Alex Monge ok to cover
|
Print Occupancy Form | | | 2/15/2006 | | DONE |
|
|
|
|
BLD-Wall cover | 1/27/2006 | 1/30/2006 | 1/30/2006 | A | PART |
Dave Hannah
|
|
|
Please call Paul at the above number when you arrive. We have a question about thresholds and the shown fire rated shaft as well. Thanks. ok to cover walls
|
Permit Ready to Issue | | | 12/21/2005 | | DONE |
|
|
|
|
Print Occupancy Form | | | 12/21/2005 | | DONE |
|
|
|
|
Telephone call | | | 12/21/2005 | | DONE |
|
|
|
called and left message with receptionist for Alex that permit is ready and fee
|
Issue PAID IN FULL permit | | | 12/21/2005 | | DONE |
|
|
|
|
Plan assigned to (CJW) | 11/17/2005 | | 12/20/2005 | | PASS |
|
|
|
12/20/2005 09:52:01 CJW - activity updated through activity BLDA022 from case BLD05-03152.
|
Routing - PLAN CHECK | 12/19/2005 | | 12/20/2005 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/20/2005 | | DONE |
|
|
|
The Mechanical Engineer had asked about changing the design to show a different venting method for the pizza oven. He was told that revised drawings were required. NO REVISED DRAWINGS HAVE BEEN RECEIVED. Evidently he decided to go with the original design. If after the issuance of this permit revised drawings are received, additional plan review fees may be required on an hourly basis. CJW
|
Routing - PLANNING | 12/16/2005 | | 12/19/2005 | | PASS |
|
|
|
Approved and as noted on plans. Note states that CCDC shall provided Design Review Staff with a letter indicating their approval of the awnings prior to occupancy.
|
Routing - PLAN CHECK | 12/12/2005 | | 12/16/2005 | | |
|
|
|
Given to Marty.
|
Routing - PLANNING | 12/9/2005 | | 12/12/2005 | | FAIL |
|
|
|
Applicant has not applied for the required staff level DR approval for the project. I have tried to contact Sylvester R. and have not been able to get through. I will continue to try.
|
Routing - PLAN CHECK | 11/30/2005 | | 12/9/2005 | | PASS |
|
|
|
Approved after resubmittal review.
|
Plan resubmittals received | | | 12/6/2005 | | DONE |
|
|
|
Received response letter from architect and 2 copies of plan sheets CS, A1, A2, A3 and forwarded to Carl.
|
1st review completed | | | 11/30/2005 | | FAIL |
|
|
|
failed plan check.
|
Routing - FIRE | 11/28/2005 | | 11/30/2005 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 11/18/2005 | | 11/28/2005 | | FAIL |
|
|
|
The IBC plan review was started on November 21, 2005 and was finished on November 28, 2005. Revised drawings were required. See the plan review report.
|
Routing - PLUMBING | 11/17/2005 | | 11/18/2005 | | PASS |
|
|
|
if an automatic chemical system is installed at the mop sink provide a water supply for it. additional cross connection protection may be required.
|
Routing - PUBLIC WORKS | 11/17/2005 | | 11/17/2005 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 11/16/2005 | | |
|
|
|
|
Application received | | | 11/10/2005 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 11/10/2005 | | |
|
|
|
|
Fee Review-notes | 11/10/2005 | 11/10/2005 | | | |
|
|
|
|