Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD05-03162
StatusFinaled
Name WASHINGTON GROUP INTERNATIONAL
Site Address 701 E MORRISON KNUDSEN DR
Project NameMK PLAZA II-1ST FLR
Customer Number 
ePlanReviewNo
Description
(WASHINGTON GROUP INTERNATIONAL - MK PLAZA II - 1ST FLR) To remodel an existing 410 sq ft office area located on the first floor of the MK Plaza building by installing a noncombustible partition and a new door to create two office areas, relocation of existing lighting and dual level switching, this building is fully fire sprinklered any alterations or modifications to the sprinkler system shall be per NFPA #13 an WILL require a separate permit as regulated by the fire department. (Rmh)
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Letter of compliance  7/29/2009 DONE
Voucher Form  2/27/2006 DONE
Third Notice 2/24/20062/24/2006 DONE
Second Notice BLD2/3/20062/3/20062/24/2006 DONE
First Notice has not been responded to.
First Notice1/23/20061/23/20062/3/2006 DONE
DetailsDave Hannah
BLD-Final1/23/20061/23/20061/23/2006PPASS
DetailsDave Hannah
Steve; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong
DOC - Permit Finaled1/23/20061/23/20061/23/2006PPASS
DetailsDave Hannah
FIRE-Final Inspection1/19/20061/20/20061/20/2006APASS
DetailsForrest France
Life safety inspection passed.
BLD-Final1/18/20061/19/20061/19/2006ACANC
DetailsDave Hannah
steve or ###-####; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
BLD-Final1/19/20061/19/20061/19/2006PNR
DetailsDave Hannah
steve or ###-####; Phone #: ###-#### Internet Inspection Request from: Barbara Moore needs fire final
BLD-Framing/Rough-in12/9/200512/9/200512/9/2005PPASS
DetailsDave Hannah
sherry ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie ok to cover walls
BLD-Framing/Rough-in12/8/200512/9/200512/9/2005ACANC
DetailsDave Hannah
sherry ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
Issue PAID IN FULL permit  11/28/2005 DONE
Plan assigned to (R_H)11/14/200511/14/200511/16/2005 PASS
11/16/2005 07:51:55 RMH - activity updated through activity BLDA022 from case BLD05-03162.
Routing - PLAN CHECK11/14/2005 11/16/2005 PASS
Routing - FIRE11/16/2005 11/16/2005 PASS
Minor work / Field verify
Case Summary (BLD)  11/16/2005 DONE
PLANS/APPL TAKEN TO FRONT DESK  11/16/2005 DONE
Inspection Record Card- Bld  11/16/2005 DONE
Permit Ready to Issue  11/16/2005 DONE
Telephone call  11/16/2005 DONE
called ###-#### and told Dick that permit is ready and fees
1st review completed  11/16/2005 PASS
Application received  11/14/2005  
Recd Pcfee & Taken To Pln CK  11/14/2005  
Plans ACCEPTED BY PLAN TECH  11/14/2005  
Fee Review-notes11/14/200511/14/2005   
Routing - PLAN CHECK11/14/2005