Permit Information
Permit NumberBLD05-03176
StatusFinaled
Name GENTHER MASONRY INC
Site Address 1000 S VISTA AVE
Project NameVISTA VILLAGE
Customer Number 
ePlanReviewNo
Description
(REILLY'S CHURCH SUPPLY - VISTA VILLAGE) This building is partially fire sprinklered. To remodel an existing 6,555 square foot tenant space (3,284 square foot 1st story and 3,271 square foot basement) for a new retail sales tenant. Work is to include interior nonbearing walls, interior wall furring, new store front door and window system, suspended ceilings, a new stairway to the basement, a new floor in an abandoned stairway opening, and finishes. The restrooms were constructed in 1993 and are required to be maintained accessible to the disabled. The work is required to comply with the approved drawings, the plan review report, and all applicable codes. All fire sprinkler work shall comply with NFPA 13 as regulated by the Fire Department. Exterior changes under this permit must comply with CZC05-00224. Future canopy remodel and fire sprinkler installation will be done under BLD04-02464. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice BLD6/14/20066/14/20069/13/2006 DONE
Second Notice has not been responded to.
Second Notice BLD4/14/20064/14/20066/14/2006 DONE
First Notice has not been responded to.
First Notice 4/3/20064/14/2006 DONE
Permanent occupancy UNPAID FEE  4/3/2006 DONE
Perm. Occ. Cert. # 10961 issued 4-3-06 to Reilly's Church Supply in Vista Village.
BLD-Final3/27/20063/28/20063/28/2006APASS
DetailsJim Storey
Jim, Please call me so that I can meet you at Reilly's for the inspection; Phone #: ###-#### Internet Inspection Request from: Todd Kurns
Permanent Occupancy 3/28/20063/28/2006 DONE
Details
BLD-Final3/22/20063/24/20063/24/2006AFAIL
DetailsJim Storey
Phone #: ###-#### Internet Inspection Request from: Todd Kurns
FIRE-Final Inspection3/22/20063/23/20063/23/2006APASS
DetailsForrest France
Project related alarm and sprinkler permits have been completed. Fire life safety inspection passed, corrections complete.
BLD-Final3/16/20063/17/20063/17/2006AFAIL
DetailsJim Storey
Phone #: ###-#### Internet Inspection Request from: Todd Kurns handrails/ gyp at wall under stair/ back exit theshold transition height.
FIRE-Final Inspection3/16/20063/17/20063/17/2006APART
DetailsForrest France
Temporary occupancy approval pending building structural inspection. Fire final pending verification of fire sprinkler plan resubmittals.
BLD-Framing/Rough-in3/2/20063/2/20063/2/2006PPASS
DetailsJim Storey
ceiling insp todd- ###-####--call 1st before insp
BLD-Framing/Rough-in2/21/20062/22/20062/22/2006APASS
DetailsJim Storey
Todd; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong
Issue PAID IN FULL permit  1/4/2006  
Telephone call  1/3/2006 DONE
called ###-#### and told Donna that permit is ready and fees
PLANS/APPL TAKEN TO FRONT DESK  12/30/2005 DONE
Print Occupancy Form  12/30/2005 DONE
Permit Ready to Issue  12/30/2005 DONE
Plan assigned to (CJW)12/1/2005 12/30/2005 PASS
12/30/2005 14:03:50 CJW - activity updated through activity BLDA022 from case BLD05-03176.
Routing - PLAN CHECK12/14/2005 12/30/2005 PASS
Drawings approved after resubmittal review.
Plan resubmittals received  12/23/2005 DONE
Cover letter from architect including stair slab calcs and 2 copies of sheets T1.0, A1.0, A2.2 and A3.0 received and forwarded to Carl W.
1st review completed  12/14/2005 FAIL
FAILED PLAN CHECK
Routing - FIRE12/5/2005 12/12/2005 PASS
sent to FV 12/8/05
Routing - PLAN CHECK11/21/2005 12/5/2005 FAIL
The IBC plan review was started on December 3, 2005 and was finished on December 5, 2005. Revised drawings were required. See the plan review report.
Plan assigned to (JCB)11/17/2005 12/1/2005 ----
Reassigned to Carl by msouthard.
Routing - PLANNING11/18/2005 11/21/2005 PASS
Approved per CZC05-00224.
Routing - Erosion and Sediment11/18/2005 11/18/2005 PASS
ESC waiver request approved with attached conditions.
Routing - PUBLIC WORKS  11/18/2005 PASS
Plans ACCEPTED BY PLAN TECH  11/16/2005  
Application received  11/15/2005  
Recd Pcfee & Taken To Pln CK  11/15/2005  
Fee Review-notes11/15/200511/15/2005