Third Notice BLD | 1/8/2007 | 1/8/2007 | 1/25/2007 | | DONE |
|
|
|
Second Notice has not been responded to.
|
Second Notice BLD | 12/27/2006 | 12/27/2006 | 1/8/2007 | | DONE |
|
|
|
First Notice has not been responded to.
|
First Notice | | 10/3/2006 | 12/27/2006 | | DONE |
|
|
|
|
Permanent Occupancy | | 10/3/2006 | 10/3/2006 | | DONE |
|
|
|
|
Permanent occupancy | | | 10/3/2006 | | DONE |
|
|
|
Perm. Occ. Cert. # 11231 issued 10-3-06 to Dr. Stephen Gilman Orhtodontics.
|
BLD-Aging Inspection | 8/24/2006 | 8/24/2006 | 8/24/2006 | | PASS |
Tom Arcoraci
|
|
|
ok for perm occ when plumb signs
|
Temporary occupancy | | | 8/24/2006 | | DONE |
|
|
|
Temp. Occ. Cert. # 5428 issued 8-24-06 to Dr. Steven Gilman Orthodontics.
|
BLD-Final | 6/22/2006 | 6/23/2006 | 6/23/2006 | A | PART |
Dave Hannah
|
|
|
gil Note: early as possible please call 1/2 hr prior; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles ok for temp occ ok for perm occ after plumbing gos perm
|
FIRE-Final Inspection | 6/22/2006 | 6/22/2006 | 6/22/2006 | P | PASS |
Troy Cobbley
|
|
|
Life safety finaled
|
BLD-Other | 5/23/2006 | 5/23/2006 | 5/23/2006 | P | PASS |
Dave Hannah
|
|
|
gale Note: ceiling grid ; Phone #: ###-#### Please call 1/2 hr prior to inspection Internet Inspection Request from: Cathy Chiles ok to cover ceiling
|
BLD-Conference | 5/17/2006 | 5/17/2006 | 5/17/2006 | P | PASS |
Dave Hannah
|
|
|
GIL NOTE: PLEASE CALL 1/2 HR PRIOR; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
BLD-Framing/Rough-in | 4/7/2006 | 4/7/2006 | 4/7/2006 | P | PASS |
Tom Arcoraci
|
|
|
gill-- call 1st before insp; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
Issue PAID IN FULL permit | | | 1/30/2006 | | DONE |
|
|
|
|
Telephone call | | | 12/28/2005 | | DONE |
|
|
|
called ###-#### and told Mike Falash that permit is ready and fees
|
Plan assigned to (CJW) | 11/22/2005 | | 12/27/2005 | | PASS |
|
|
|
12/27/2005 14:03:44 CJW - activity updated through activity BLDA022 from case BLD05-03201.
|
Routing - PLAN CHECK | 12/23/2005 | | 12/27/2005 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/27/2005 | | DONE |
|
|
|
|
Print Occupancy Form | | | 12/27/2005 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 12/27/2005 | | |
|
|
|
|
Routing - PLUMBING | 12/21/2005 | | 12/23/2005 | | PASS |
|
|
|
per resubmitted plans 12/15/05 AND 2003 UPC.
|
Routing - PLAN CHECK | 12/13/2005 | | 12/21/2005 | | PASS |
|
|
|
(12-16-05) Missing revised Sheet A3.0. Called the Architect and left a message. Waiting for return call. (12-21-05) The drawings were approved after the resubmittal review.
|
Plan resubmittals received | | | 12/20/2005 | | DONE |
|
|
|
Received 2 copys of sheet A3.0 Taken to Carl W.
|
1st review completed | | | 12/13/2005 | | FAIL |
|
|
|
Failed Plumbing and Plan Check
|
Routing - FIRE | 12/6/2005 | | 12/13/2005 | | PASS |
|
|
|
Subject to satisfactory field inspection per common IFC requirements list; no written review comments.
|
Plan resubmittals received | | | 12/12/2005 | | DONE |
|
|
|
Received 1 letter of transmittal & 2 copys of sheets A0.0,A2.0,A2.1,A5.0,A5.1 Taken to Carl W.
|
Routing - PLAN CHECK | 11/25/2005 | | 12/6/2005 | | FAIL |
|
|
|
The IBC plan review was started on December 5, 2005 and was finished the next day. Revised drawings were required. See the plan review report.
|
Routing - PLUMBING | 11/23/2005 | | 11/25/2005 | | FAIL |
|
|
|
provide a floor sink for the vacuum pump discharge, the mop sink would be a health hazard. verify premise protection. size plumbing lines, show venting, provide a fixture schedule, water heater detail. cross connection protection and vacuum pump and dentail air compressor exhaust and intake.
|
Routing - PUBLIC WORKS | 11/22/2005 | | 11/23/2005 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 11/21/2005 | | |
|
|
|
|
Application received | | | 11/18/2005 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 11/18/2005 | | DONE |
|
|
|
|
Fee Review-notes | 11/18/2005 | 11/18/2005 | | | |
|
|
|
|