Information based on query as of Friday, August 16, 2024.
Permit Information
Permit NumberBLD05-03203
StatusFinaled
Name STATUS HOMES INC
Site Address 2318 S RUSHMORE WAY
Project Name 
Customer Number 
ePlanReviewNo
Description
(Previous permit (bld05-02916) voided due to new plans being submitted)To construct a 2140 sq. ft. two story single family dwelling with a 607 sq. ft. attached two car garage, a 170 sq. ft. covered concrete entry porch and a 296 sq. ft. concrete patio at rear of structure per approved plans, all red-lining and attached condition list. "The permit holder is responsible to comply with current wall bracing requirements as adopted by Boise City."This lot is within the floodplain area. An elevation certificate is required before calling for a rough framing inspection. (1st floor 1427 sq. ft.)(2nd floor 713 sq. ft.) R-1B CUP03-74 PC#015 DJO
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final6/30/20066/30/20066/30/2006PPASS
DetailsMike Jordan
Internet Inspection Request from: Carey Allen
DOC - Permit Finaled6/30/20066/30/20066/30/2006PPASS
DetailsMike Jordan
BLD-Final6/27/20066/27/20066/27/2006ANR
DetailsMike Jordan
Internet Inspection Request from: Carey Allen. Needs other tradesfinaled.
BLD-Framing/Rough-in5/4/20065/5/20065/5/2006ACANC
DetailsMike Jordan
Internet Inspection Request from: Carey Allen
BLD-Energy code compliance4/12/20064/13/20064/13/2006APASS
DetailsMike Jordan
Internet Inspection Request from: Carey Allen. pending mech ri inspection prior to cover. c/n posted.
BLD-Framing/Rough-in4/6/20064/6/20064/6/2006PPASS
DetailsMike Jordan
Internet Inspection Request from: Carey Allen
Plan Reviewer's activity  3/6/2006 PASS
Elevation Certificate has been recieved and approved by Jim W. Framing inspection may be performed.
BLD-Footing1/26/20061/26/20061/26/2006PPART
DetailsMike Jordan
Santos -- call 1st before insp; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong. wip
Issue PAID IN FULL permit  12/15/2005 DONE
Telephone call  12/7/2005 DONE
called ###-#### and told Kim that permit is ready and fees
Routing - PLAN CHECK  12/6/2005 PASS
Route to Carl Miller per CUP03-00074
Case Summary (BLD)  12/6/2005  
PLANS/APPL TAKEN TO FRONT DESK  12/6/2005 DONE
Inspection Record Card- Bld  12/6/2005 DONE
Permit Ready to Issue  12/6/2005 DONE
Permit Ready to Issue  12/6/2005 DONE
Permit Ready to Issue  12/6/2005 DONE
Permit Ready to Issue  12/6/2005 DONE
Permit Ready to Issue  12/6/2005 DONE
Permit Ready to Issue  12/6/2005 DONE
Plan assigned to (SAM)11/18/200511/18/200511/30/2005 DONE
Routing - PLANNING11/21/2005 11/22/2005 PASS
Routing - PUBLIC WORKS11/18/2005 11/21/2005 PASS
Application received  11/18/2005  
Plan assigned to (DJO)11/30/2005