Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD05-03224
StatusFinaled
Name CASCADE BUILDERS
Site Address 6728 W STATE ST
Project NameDARREN BLASER BLDG
Customer Number 
ePlanReviewNo
Description
(SPORTS ZONE CLIPS-N-CUTS)(DARREN BLASER BLDG) To remodel the interior of an existing 1,275 sq. ft. tenant space for use by new tenant. Work includes selective demolition of interior walls to open up area for customer waiting & service area; construction of a raised platform area for hair cutting stations; interior walls to create break area, storage and janitor room; to modify locations of existing light fixture's and mechanical diffusers to match layout of new areas and add new suspended pendant dome lights above work stations; install new finishes and millwork all per approved plans, notes thereon and attached plan review conditions of all reviewing agencies. There is an existing fully accessible uni-sex restroom that is to be maintained. drs
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice BLD1/8/20071/8/20074/18/2007 DONE
Second Notice has not been responded to.
Fee Review-notes11/21/200511/21/20054/18/2007 DONE
Telephone call  4/10/2007 DONE
Call to Cascade Builders, they stated this is "Darrin's" job and his # is ###-####, fax ###-####. Call to Darrin, he requested cert of val form and he will complete it and send it back 4/11/07. Done.
Second Notice BLD9/25/20069/25/20061/8/2007 DONE
First Notice has not been responded to.
First Notice 9/15/20069/25/2006 DONE
Permanent occupancy  9/15/2006 DONE
Perm. Occ. Cert. # 11209 issued 9-14-06 to the Sports Zone CLips-N-Cuts.
Permanent Occupancy 9/14/20069/14/2006 DONE
Details
BLD-Final2/7/20062/7/20062/7/2006PNR
DetailsDave Hannah
reinspection on final
BLD-Final2/6/20062/7/20062/7/2006ANR
DetailsDave Hannah
reinspection on final
BLD-Final2/3/20062/6/20062/6/2006PPART
DetailsTony Young
tyler; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
temp. occ is ok,, but need a different ramp end
FIRE-Final Inspection2/3/20062/6/20062/6/2006APASS
DetailsTroy Cobbley
Fire life safety passed
BLD-Framing/Rough-in1/19/20061/19/20061/19/2006PPASS
DetailsTony Young
###-####
Telephone call  12/27/2005 DONE
called ###-#### and left message w/David Ruby for Wes that permit is ready and fees
Issue PAID IN FULL permit  12/27/2005  
Permit Ready to Issue  12/23/2005 DONE
Print Occupancy Form  12/23/2005 DONE
Routing - PLAN CHECK12/22/2005 12/22/2005 PASS
Resubmittals inserted into original plan submittals. Routing to permit desk to issue.
1st review completed  12/22/2005 FAIL
Failed plan check.
PLANS/APPL TAKEN TO FRONT DESK  12/22/2005 PASS
Ready to issue
Plan assigned to (DRS)11/23/2005 12/22/2005 PASS
12/22/2005 08:48:03 DRS - activity updated through activity BLDA022 from case BLD05-03224.
Routing - FIRE12/20/2005 12/22/2005 PASS
DetailsBill Alexander
No Review Comments. Field Verifiy IFC
Plan resubmittals received  12/21/2005 DONE
Received a cover letter from architect and 2 copies of plan sheets G1.0, A1.1, A2.1 and A2.2 and forwarded to Dan Stuart.
Routing - PLAN CHECK11/23/2005 12/20/2005 FAIL
Copy of plan review corrections report faxed to Wes Edwards, architect for response. Routing to fire code analyst for review.
Plan resubmittals requested  12/20/2005 FAIL
Faxed copy of plan review corrections required for this project to the architect Wescott Edwards.
Telephone call  12/20/2005 DONE
Call from Wes Edwards to discuss plan review comments and his view that they were over extensive. I explianed that I compared to last plan review done for this business and tried to be sure nothing was ask for that hadn't been ask for before except for the code change requiring an accessible route to the raised platform which was not a requirement under the 1997 UBC. He says he is going to chanllenge my requirement through Marlene. I let Marlene know it was coming.
Routing - PUBLIC WORKS11/23/2005 11/23/2005 PASS
Plans ACCEPTED BY PLAN TECH  11/22/2005  
Application received  11/21/2005  
Recd Pcfee & Taken To Pln CK  11/21/2005