Information based on query as of Saturday, August 17, 2024.
Permit Information
Permit NumberBLD05-03235
StatusFinaled
Name MONGOLIAN GRILL & BAR
Site Address 801 W BANNOCK ST
Project NameBLOCK 44
Customer Number 
ePlanReviewNo
Description
(MONGOLIAN GRILL & BAR) This building is NOT fire sprinklered. To convert an existing retail sales tenant space and remodel it for a new restaurant tenant. The entire 842 square foot 2nd story will be demolished. The 934 square foot basement will be changed to a crawl space approved only for mechanical equipment and having ladder access only. This tenant space will have a total 1st story floor area of about 1,870 square feet. Only the 1st story will be used. Work is to include interior nonbearing walls, 2 restrooms accessible to the disabled, 2 grease hoods and ducts, a dishwasher hood and duct, suspended ceilings, gypsum board ceilings, and finishes. The work is required to comply with the approved drawings, the plan review report, and all applicable codes. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  10/17/2016 DONE
Case Summary (BLD)  10/17/2016 DONE
Case Summary (BLD)  10/17/2016 DONE
Third Notice BLD8/18/20068/18/20068/31/2006 DONE
Second Notice has not been responded to.
Second Notice BLD7/7/20067/7/20068/18/2006 DONE
First Notice has not been responded to.
First Notice 5/19/20067/7/2006 DONE
BLD-Final5/19/20065/19/20065/19/2006PPASS
DetailsDave Hannah
KEVIN; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles ok for perm occ
BLD-Final5/18/20065/19/20065/19/2006ANR
DetailsDave Hannah
Dennis; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt
Permanent Occupancy 5/19/20065/19/2006 DONE
Details
Permanent occupancy UNPAID FEE  5/19/2006 DONE
Perm. Occ. Cert. #11030 issued 5-19-06 to the Mongolian Grill & Bar.
FIRE-Final Inspection5/18/20065/18/20065/18/2006PPASS
DetailsTroy Cobbley
Life safety finaled
FIRE-Final Inspection5/16/20065/17/20065/17/2006AFAIL
DetailsForrest France
The project related hood inspection has failed, also need to remove the manual thumbturn at the main entry/exit door, repair non-functional exit sign and discharge light at the west exit, provide max. occupant load sign as indicated on review notes, need to provide means to test HVAC duct SD devices at next inspection, not all life safety items reviewed at this time.
FIRE-Final Inspection5/16/20065/16/20065/17/2006PNR
DetailsForrest France
The project related hood suppression permit must be finaled before final life safety inspection.
BLD-Framing/Rough-in5/2/20065/2/20065/2/2006PPASS
DetailsDave Hannah
Kevin; Phone #: ###-#### Internet Inspection Request from: Ione Coleman ceiling grid ok to cover
BLD-Framing/Rough-in4/7/20064/7/20064/7/2006PPASS
DetailsDave Hannah
Dennis -- call 1st before insp; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong ok to cover ceiling
BLD-Framing/Rough-in3/28/20063/29/20063/30/2006APASS
DetailsDave Hannah
Dennis; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong ok to cover ceiling framing
BLD-Framing/Rough-in3/24/20063/24/20063/24/2006PPASS
DetailsDave Hannah
kevin ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
BLD-Framing/Rough-in3/22/20063/23/20063/23/2006APART
DetailsDave Hannah
kevin; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles ok to cover fire wall and one side int walls
BLD-Framing/Rough-in3/20/20063/21/20063/21/2006ANR
DetailsDave Hannah
kevin; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
BLD-Framing/Rough-in3/13/20063/13/20063/13/2006PPART
DetailsDave Hannah
fire wall insp///dennis; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa first two layers ok on backside of wall
BLD-Conference3/2/20063/2/20063/3/2006PPART
DetailsDave Hannah
DENNIS ; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles needs to remove old shed as per plan
BLD-Conference2/22/20062/22/20062/22/2006PPASS
DetailsDave Hannah
dennis; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
Issue PAID IN FULL permit  2/14/2006 DONE
Print Occupancy Form  12/19/2005 DONE
Permit Ready to Issue  12/19/2005 DONE
Telephone call  12/19/2005 DONE
called ###-#### and left voicemessge for Matt that permit is ready and fees
Routing - PLAN CHECK12/13/2005 12/16/2005 PASS
Drawings approved after resubmittal review.
PLANS/APPL TAKEN TO FRONT DESK  12/16/2005 DONE
Plan assigned to (CJW)11/28/2005 12/16/2005 PASS
12/16/2005 13:02:11 CJW - activity updated through activity BLDA022 from case BLD05-03235.
Plan resubmittals received  12/14/2005 DONE
Received 1 transmittal , & 2 copys of sheets A1.0,A2.0,A3.0 Taken to Carl W.
Routing - FIRE12/8/2005 12/13/2005 PASS
review faxed to architect.
1st review completed  12/13/2005 FAIL
Failed Plan Check
Routing - PLAN CHECK11/30/2005 12/8/2005 FAIL
The IBC plan review was started on December 7, 2005 and was finished the next day. Revised drawings are required. See the plan review report.
Routing - PLUMBING11/29/2005 11/30/2005 PASS
per plans and 2003 upc
Routing - PUBLIC WORKS11/28/2005 11/29/2005 PASS
Plans ACCEPTED BY PLAN TECH  11/25/2005  
Application received  11/22/2005  
Recd Pcfee & Taken To Pln CK  11/22/2005  
Fee Review-notes11/22/200511/22/2005