Permit Information
Permit NumberBLD05-03243
StatusFinaled
Name THE SIGN CENTER
Site Address 1891 N WILDWOOD AVE
Project NameThe Sign Center
Customer Number 
ePlanReviewNo
Description
(THE SIGN CENTER)(STEELWOOD FLEX CONDOS - BLDG 3 - UNITS 20/21-1ST FLR) New 2,594 sq. ft. sign fabrication facility with some office and storage on the first floor of existing vacant shell building space per approved plans and DRH05-00230. Another permit is attached to these plans under BLD05-03072 for a separate tenant on the second floor. Work to include some new exterior wall infill in former overhead door opening, new interior walls, new interior doors and windows, interior finish, some suspended ceiling work, new accessible restrooms, fire sprinkler work, new mechanical including two new furnaces, new plumbing, and new electrical work. Units 20 and 21 will be merged to act as one condo unit but there will be separate tenants on each floor. A Certificate of Occupancy is to be issued when completed and approved. Nonseparated Uses per IBC Section 302.3.1. NOTE: This building is fully fire sprinklered to meet fire water flow requirements. JCB
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice BLD4/23/20084/23/20084/25/2008 DONE
DetailsCathy Brown
First Notice has not been responded to.
First Notice 3/7/20084/23/2008 DONE
Permanent Occupancy  3/7/2008 DONE
BLD-Final3/5/20083/5/20083/5/2008PPASS
DetailsJim Sly
allen Phone #: ###-####
OK for Perm Occ. :)
Code Occupancy Approval2/27/20082/27/20082/27/2008PPASS
DetailsCarol Montgomery
BLD-Conference2/21/20082/22/20082/22/2008ADONE
DetailsJim Sly
Phone # ? Go to site and check out.
Talked to Alan ###-####. Will proceed to final.
BLD-Conference2/20/20082/21/20082/21/2008ACANC
DetailsJim Sly
Call sign center and discuss req.for perm Occ.
FIRE-Alarm Testing12/12/200612/12/200612/12/2006PPASS
DetailsTroy Cobbley
Life safety finaled
FIRE-Final Inspection12/1/200612/4/200612/4/2006AFAIL
DetailsTroy Cobbley
Need fire alarm and fire sprinkler permits finaled and then life safety will be inspected.
BLD-Final7/26/20067/27/20067/27/2006PPART
DetailsJim Sly
vern ; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley
OK for Temp Occ..........OK to Perm, when Fire and Code enforce Perms.
FIRE-Final Inspection7/26/20067/27/20067/27/2006APASS
DetailsTroy Cobbley
A temporary occupancy was given until the south tenant is complete
Temporary occupancy  7/27/2006 DONE
Temp. Occ. Cert. # 5422 issued 7-27-06 to The Sign Center.
BLD-Final7/24/20067/25/20067/25/2006PCANC
DetailsJim Sly
Vern : ); Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt
FIRE-Final Inspection7/24/20067/25/20067/25/2006AFAIL
DetailsTroy Cobbley
Fire alarm inspection failed
FIRE-Final Inspection7/21/20067/21/20067/21/2006PFAIL
DetailsTroy Cobbley
Still need the fire alarm permit finaled. Life safety for the shell and Sign Company tenant is ok for a temporary occupancy once the fire alarm is a go. The south tenant work is ongoing at this time.
BLD-Final7/21/20067/21/20067/21/2006PCANC
DetailsJim Sly
vern; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley
FIRE-Final Inspection7/19/20067/20/20067/20/2006AFAIL
DetailsTroy Cobbley
The fire alarm and fire spirnkler permits need t be finaled, exit signs and emergency lights need repaired and approved hardware installed on the second floor restroom doors.
FIRE-Conference6/28/20066/29/20066/29/2006ADONE
DetailsTroy Cobbley
Vern requested occupying the building with the first tenant while finish construction was taking place in the second tenant space. Per Dave Hanniman and I this will be ok as long as the fire sprinklers, fire alarm and fire life safety is complete for the shell and the tenant space that is going to be occupied.
BLD-Energy code compliance3/23/20063/24/20063/24/2006APASS
DetailsJim Sly
vern; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
BLD-Framing/Rough-in3/22/20063/22/20063/22/2006PPASS
DetailsJim Sly
Vern -- prefer late afternoon; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong
BLD-Footing2/7/20062/7/20062/7/2006PPART
DetailsJim Sly
slab and footing re-bar inspection//vern; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa

Center (E.-W.) footing OK pending MTI special insp tests and approvals
BLD-Footing1/30/20061/31/20061/31/2006APART
DetailsJim Sly
vern nielson; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
Int pads at N 1/2 of Bldg
Routing - PLANNING Land Div1/25/2006 1/27/2006 PASS
Routing - PLAN CHECK1/27/2006 1/27/2006 PASS
Permit and plans approved and taken to front desk.
PLANS/APPL TAKEN TO FRONT DESK  1/27/2006 PASS
Print Occupancy Form  1/27/2006 DONE
Telephone call  1/27/2006 DONE
called ###-#### and told Ben Peterson that permit is ready and fee and need to pay sub04-00082 also
Permit Ready to Issue  1/27/2006 DONE
Issue PAID IN FULL permit  1/27/2006 DONE
Plan assigned to (JCB)11/23/2005 1/27/2006 PASS
1/27/2006 09:38:06 JCB - activity updated through activity BLDA022 from case BLD05-03243.
Routing - PLAN CHECK12/19/2005 1/25/2006 PEND
Routed plans to Planning/Land Division.
Telephone call  12/29/2005 DONE
Received telephone call from Ben Petersen of Larson Architects stating that the plans may now change. Another interior stairway may be installed in lieu of the exterior stairway shown. If this will be done new plans, details, and engineering design and calculations will be submitted and have to be worked back into the review process.
Routing - PLAN CHECK11/30/2005 12/19/2005 PEND
Permit approval dependent on approval by Planning/Land Division.
Ben Petersen or Rob Perez to let me know when these issues are resolved so plans can route back to Planning/Land Division for approval.
Plan resubmittals received  12/1/2005 DONE
Received 1 transmittal,2 responses,1 review comments & 2 copys of sheets A-0,A-1,A-2,A-4,A-5,S1.0,S2.0,S3.0 Taken to Jason B.
Routing - FIRE11/25/2005 11/30/2005 PASS
1st review completed  11/30/2005 FAIL
failed planning, planning land div, ESC and plan check.
Routing - PLAN CHECK11/21/2005 11/25/2005 FAIL
Plan review report e-mailed and faxed to architect. Plan resubmittals and written response required for further review. Plans to route to the Fire Department for review.
Plan resubmittals requested  11/25/2005 DONE
Plan resubmittals and written response required for further review.
Telephone call  11/25/2005 DONE
Discussed some of the issues that need to be addressed with Ben Petersen.
Plan resubmittals received  11/23/2005 DONE
Received Transmittal letter, & 3 copys of sheet A-1 Taken to Jason B.
Application received  11/23/2005  
Routing - PLANNING11/17/2005 11/21/2005 PASS
Routing - PLAN CHECK11/16/2005 11/17/2005 FAIL
No building plan review done yet. Plans routed to Scott Spjute in Planning.
Routing - PLAN CHECK11/15/2005 11/16/2005 FAIL
Routing - Erosion and Sediment11/16/2005 11/16/2005 PASS
Routing - Erosion and Sediment11/14/2005 11/15/2005 FAIL
Routing - PUBLIC WORKS11/8/2005 11/15/2005 PASS
Routing - PLANNING11/7/2005 11/8/2005 FAIL
Routing - PLANNING Land Div11/8/2005 11/8/2005 FAIL