Information based on query as of Friday, August 16, 2024.
Permit Information
Permit NumberBLD05-03246
StatusFinaled
Name PACIFIC STEEL FABRICATORS
Site Address 8645 W FRANKLIN RD
Project NameFRANKLIN TOWN PLAZA IV
Customer Number 
ePlanReviewNo
Description
(HAWKINS PROPERTIES)(FRANKLIN TOWN PLAZA IV) To repair existing exterior stairs and landing serving as the required second exit from the second level tenant space of Hawkins Companies Real Estate, as per engineering. Located on south side of building. Work includes selective demolition of the existing stair pans and support angles and landing concrete and steel deck. The supporting structural stair stringers, landing channels and support posts shall not be removed. Clean, prime and paint existing stair structure; to add new stair support angles, tube steel support for landing deck and install 2" Amico safety tread for stair tread and landing. Riser to be closed with 11 ga. galvanized steel. Minimum stair tread to be 11" and maximum riser height is 7". Landing at top of stairs at existing exit door shall be at the same level as the interior floor level. Special inspection of welding is required per section 1704, IBC. drs
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice BLD3/29/20063/29/20064/5/2006 DONE
First Notice has not been responded to.
First Notice3/14/20063/14/20063/29/2006 DONE
DetailsTom Arcoraci
BLD-Final3/14/20063/14/20063/14/2006PPASS
DetailsTom Arcoraci
melanie or cell####-####; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
DOC - Permit Finaled3/14/20063/14/20063/14/2006PPASS
DetailsTom Arcoraci
BLD-Other2/13/20062/14/20062/14/2006APASS
DetailsTom Arcoraci
late am please//inspection for the demo part///melanie gault or ###-####; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa wip ok
Issue PAID IN FULL permit  1/17/2006 DONE
Permit Ready to Issue  1/9/2006 DONE
Inspection Record Card- Bld  1/9/2006 DONE
Telephone call  1/9/2006 DONE
called ###-#### and told Jessica that permit is ready and fee
Plan assigned to (DRS)11/23/2005 1/5/2006 PASS
1/5/2006 15:58:44 DRS - activity updated through activity BLDA022 from case BLD05-03246.
Routing - PLAN CHECK1/5/2006 1/5/2006 PASS
Received sample of stair tread material from Melani Gault. Has small perforations in steel materials for drainage and as non-slip surface. Reviewed with plan division manager, Marlene Southard and determined material met definition as "solid surface" per section 1009.5.1. No resubmittals required.
PLANS/APPL TAKEN TO FRONT DESK  1/5/2006 PASS
1st review completed  1/5/2006 DONE
Application received  11/23/2005  
Recd Pcfee & Taken To Pln CK  11/23/2005  
Plans ACCEPTED BY PLAN TECH  11/23/2005  
Ok to take in per Dan S. & Jason B. Dan S. to get floor plan from records. Plans for reference only. ///DLD
Fee Review-notes11/23/200511/23/2005