Permit Information
Permit NumberBLD05-03264
StatusFinaled
Name JAMES GIPSON
Site Address 1317 N 22ND ST
Project Name 
Customer Number 
ePlanReviewNo
Description
To Construct an Addition/Remodel to an existing single family dwelling to consist of : Construct a new foundation by lifting the existing structure and deepening the basement, utilizing a 9' stemwall construction, Egress windows in Basement as per plan. The Upper floor will be fully gutted, replace sheetrock, fix unlevel floors, update electrical,plumbing,ect. and add insulation where needed. The Addition to include Fireplace area in existing Living room, Kitchen enlargement, and Stairway, stair landing area. New windows, appliances, lighting fixtures, plumbing fixtures, trim and accents will be done throughout the home.Replace existing siding with Wood Composite shake siding and Add an upgraded Entry. A new 484sq.ft. Detached two car garage will be built behind the Addition/Remodel. All as per approved plans, all red-lining, and Plan review report. R-1CH Zoning/setbacks as per Angela Wood with Planning and Zoning. DRH05-00371 as per Sarah Schafer with Planning and Zoning. (SRZ) 1-03-06 Added 256sq.ft. to basement per attached approved re-submittal plans date stamped December 30th. (SRZ) ***1-31-06-Removed 1'-0" out of detached garage per red-lined plans and approval from Sarah Schafer with Planning and Zoning. (SRZ)***
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final8/18/20068/21/20068/22/2006PPASS
DetailsDave Hannah
Scheduled by a contractor via Hello! on 8/18/2006 at 8:55:38 PM. Contact: ###-####.
DOC - Permit Finaled8/22/20068/22/20068/22/2006PPASS
DetailsDave Hannah
BLD-Final8/16/20068/17/20068/17/2006PNR
DetailsDave Hannah
angela - call 1/2 hr prior for access; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley needs mec finaled
BLD-Energy code compliance5/5/20065/9/20065/9/2006PPASS
DetailsTony Young
Scheduled by a contractor via Hello! on 5/5/2006 at 8:24:54 PM. Contact: ###-####.
BLD-Energy code compliance5/9/20065/10/20065/9/2006ACANC
DetailsDave Hannah
Scheduled by a contractor via Hello! on 5/9/2006 at 1:54:53 PM. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on May 9 2006 2:07PM.
BLD-Final5/5/20065/8/20065/8/2006PNR
DetailsDave Hannah
angela; Phone #: ###-#### Internet Inspection Request from: Rita DeYoung
BLD-Framing/Rough-in5/8/20065/8/20065/8/2006PPASS
DetailsDave Hannah
angela; Phone #: ###-#### Internet Inspection Request from: Rita DeYoung ok to insulate
BLD-Energy code compliance5/4/20065/8/20065/5/2006PCANC
DetailsDave Hannah
Scheduled by a contractor via Hello! on 5/4/2006 at 12:35:25 PM. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on May 5 2006 8:24PM.
BLD-Framing/Rough-in5/5/20065/5/20065/5/2006PPART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 5/5/2006 at 6:43:35 AM. Contact: ###-####. ok after mec r/i
BLD-Framing/Rough-in5/3/20065/5/20065/5/2006ACANC
DetailsDave Hannah
Scheduled by a contractor via Hello! on 5/3/2006 at 8:08:08 AM. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on May 5 2006 6:44AM.
BLD-Footing3/20/20063/22/20063/22/2006APART
DetailsTony Young
Scheduled by a contractor via Hello! on 3/20/2006 at 7:10:54 PM. Contact: ###-####.
interior slab point load ftg
BLD-Footing3/20/20063/21/20063/20/2006ACANC
DetailsDave Hannah
Scheduled by a contractor via Hello! on 3/20/2006 at 9:48:06 AM. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on Mar 20 2006 7:09PM.
BLD-Foundation2/7/20062/7/20062/7/2006PPASS
DetailsDave Hannah
Scheduled by a contractor via Hello! on 2/7/2006 at 9:39:45 AM. Contact: ###-####.
BLD-Footing1/30/20061/31/20061/31/2006PPART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 1/30/2006 at 3:08:14 PM. Contact: ###-####. garage ftg ok to place
BLD-Foundation1/29/20061/30/20061/31/2006PPASS
DetailsDave Hannah
Scheduled by a contractor via Hello! on 1/29/2006 at 1:31:51 PM. Contact: ###-####.
Case Summary (BLD)  1/31/2006  
Plan Reviewer's activity  1/31/2006 DONE
REMOVED 1'-0" OUT OF DETACHED GARAGE PER ALL RED-LINING. GOT APPROVAL FROM SARAH SCHAFER WITH PLANNING AND ZONING. (SRZ)
Telephone call  1/31/2006 DONE
left mess that permit is ready
Receive PAYMENT IN FULL  1/31/2006 DONE
(F) Reprint permit  1/31/2006 DONE
BLD-Footing1/16/20061/17/20061/17/2006PPASS
DetailsDave Hannah
Scheduled by a contractor via Hello! on 1/16/2006 at 2:17:28 PM. Contact: ###-####.
Case Summary (BLD)  1/3/2006  
Plan Reviewer's activity  1/3/2006 PASS
Recieved resubmittal for changes to existing permit. Attached new approved sheets to approved set. Called customer to come and pick up. (SRZ)
Plan assigned to (SRZ)11/25/200511/25/200511/25/2005 PASS
11/25/2005 15:35:32 SRZ - activity updated through activity BLDA022 from case BLD05-03264.
Case Summary (BLD)  11/25/2005  
PLANS/APPL TAKEN TO FRONT DESK  11/25/2005 DONE
Inspection Record Card- Bld  11/25/2005 DONE
Issue PAID IN FULL permit  11/25/2005 DONE
Application received  11/25/2005