Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD05-03270
StatusFinaled
Name K B'S BURRITOS
Site Address 405 S CAPITOL BLVD
Project NameBODO BLDG #8
Customer Number 
ePlanReviewNo
Description
(KBS BURRITOS - BODO BLDG #8 - 1ST STORY) This building is fire sprinklered because it is a high-rise. To create a 1,981 square foot restaurant tenant space (746 square foot dining; 680 square foot kitchen; 184 square foot office; 371 square foot restrooms, hallways, and vestibule) on the first story of an 11 story high rise building. Work is to include 2 restrooms accessible to the disabled, interior nonbearing walls, millwork, a grease hood and duct, a 2-hr shaft, suspended gypsum board ceilings, and finishes. The work is required to comply with the approved drawings, the plan review report, and with all applicable codes. The fire sprinkler system shall comply with NFPA 13 as regulated by the Fire Department. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice BLD8/18/20068/18/20062/26/2007 DONE
Second Notice has not been responded to.
Fee Review-notes11/28/200511/28/20052/22/2007 DONE
Second Notice BLD7/7/20067/7/20068/18/2006 DONE
First Notice has not been responded to.
First Notice 6/20/20067/7/2006 DONE
Permanent Occupancy 6/20/20066/20/2006 DONE
Details
Permanent occupancy UNPAID FEE  6/20/2006 DONE
Perm. Occ. Cert. # 11089 issued 6-20-06 to KB's Burritos.
BLD-Final6/16/20066/19/20066/19/2006APART
DetailsJim Storey
scott; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles final ok pendig all sign offs.
Code Occupancy Approval  6/19/2006 DONE
BLD-Final6/15/20066/16/20066/16/2006PFAIL
DetailsTony Young
Scott; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt
conf only,,, see notes on plan page a-4.0
FIRE-Final Inspection6/15/20066/16/20066/16/2006APASS
DetailsForrest France
Fire life safety inspection is satisfactory, provided fire extinguishers mounted on the wall as discussed while on site.
FIRE-Final Inspection6/9/20066/12/20066/12/2006PCANC
DetailsForrest France
scott; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles scott not quite ready
BLD-Framing/Rough-in4/28/20064/28/20064/28/2006PPART
DetailsTom Arcoraci
insulation-for the ceiling - scott; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie lid ok
BLD-Framing/Rough-in3/29/20063/30/20063/30/2006APART
DetailsDave Hannah
scott ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie shaft walls on 2nd and thrid floors ok to continue hard lid on first floor ok
BLD-Framing/Rough-in3/22/20063/23/20063/23/2006APART
DetailsDave Hannah
partial framing insp///scott; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa ok to cover int walls after elec r/i
BLD-Conference3/21/20063/22/20063/22/2006APASS
DetailsDave Hannah
scott-- call 1st before insp ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
BLD-Energy code compliance3/16/20063/16/20063/16/2006PPART
DetailsDave Hannah
Scott -- for framing and insulation; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong ext walls ok to cover
BLD-Framing/Rough-in3/16/20063/16/20063/16/2006PPASS
DetailsDave Hannah
Scott -- for framing and insulation; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong
BLD-Energy code compliance3/10/20063/13/20063/13/2006APART
DetailsDave Hannah
scott; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
BLD-Framing/Rough-in3/10/20063/13/20063/13/2006APASS
DetailsDave Hannah
scott; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
Issue PAID IN FULL permit  2/22/2006 DONE
Print Occupancy Form  1/11/2006 DONE
Inspection Record Card- Bld  1/11/2006 DONE
Permit Ready to Issue  1/11/2006 DONE
PLANS/APPL TAKEN TO FRONT DESK  1/10/2006 DONE
Routing - PLANNING1/10/2006 1/10/2006 PASS
Routing - PLAN CHECK12/20/2005 1/10/2006 PASS
Drawings approved after resubmittal review.
Plan assigned to (CJW)12/2/2005 1/10/2006 PASS
1/10/2006 16:03:16 CJW - activity updated through activity BLDA022 from case BLD05-03270.
Plan resubmittals received  1/6/2006 DONE
Received 1 response,1 transmittal & 2 copys of sheets A0.0,A1.0,A1.1,A2.0,A3.0,A4.0,A5.0,M0.1,M1.1,M2.1,M2.2,M2.3,M3.1,M4.1,P1.1,P1.2,P2.1,E2.OF,E2.1F,E2.0L,E2.1L,E2.0P,E2.0T,E3.0 Taken to Carl W.
1st review completed  12/20/2005 FAIL
Failed plan check.
Routing - FIRE12/15/2005 12/20/2005 PASS
Pending building review. Faxed comments to architect.
Routing - PLAN CHECK12/9/2005 12/15/2005 FAIL
The IBC plan review report was started on December 12, 2005 and was finished on December 15, 2005. Revised drawings were required. See the plan review report.
Routing - PLUMBING12/5/2005 12/9/2005 PASS
Bill didn't update this action to show the drawings approved. Since the drawings are stamped and signed indicating approval by Plumbing, CJW completed this action.
Routing - PUBLIC WORKS12/2/2005 12/5/2005 PASS
Plans ACCEPTED BY PLAN TECH  11/28/2005  
Application received  11/28/2005  
Recd Pcfee & Taken To Pln CK  11/28/2005 DONE