Case Summary (BLD) | | | 8/6/2013 | | DONE |
|
|
|
|
Telephone call | | | 3/27/2007 | | DONE |
|
|
|
call to Ron Juhnke w/ petra to confirm final values for plumbing and mechanical. He will check and call or fax figures.
|
Third Notice BLD | 3/21/2007 | 3/21/2007 | 3/26/2007 | | DONE |
|
|
|
Second Notice has not been responded to.
|
Second Notice BLD | 3/8/2007 | 3/8/2007 | 3/21/2007 | | DONE |
|
|
|
First Notice has not been responded to.
|
First Notice | | 2/26/2007 | 3/8/2007 | | DONE |
|
|
|
|
Permanent Occupancy | | 2/26/2007 | 2/26/2007 | | DONE |
|
|
|
|
Permanent occupancy | | | 2/26/2007 | | DONE |
|
|
|
Perm. Occ. Cert. # 11452 issued 2-26-07 to Gold's Gym.
|
Code Occupancy Approval | 2/23/2007 | 2/23/2007 | 2/23/2007 | P | PASS |
Scott M.Brown
|
|
|
OK FOR FINAL AND RELEASE OF BOND
|
BLD-Wall cover | 12/4/2006 | 12/5/2006 | 2/22/2007 | A | CANC |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 12/4/2006 at 2:26:20 PM. Contact: ###-####.
|
CHANGE STATUS TO (ISS) | | | 1/12/2007 | | DONE |
|
|
|
|
Temporary occupancy | | | 1/12/2007 | | DONE |
|
|
|
Temp. Occ. Cert. # 5515 issued 1-12-07 to Gold's Gym.
|
BLD-Final | 12/27/2006 | 12/27/2006 | 12/27/2006 | P | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 12/27/2006 at 8:40:16 AM. Contact: ###-####. OK for Temp Occ......... OK for Perm Occ, when Electr, P&Z, and Plumb signs off Perm Occ.
|
BLD-Final | 12/22/2006 | 12/26/2006 | 12/26/2006 | P | NR |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 12/22/2006 at 1:04:24 PM. Contact: ###-####. Need all req signatures.
|
FIRE-Final Inspection | 12/22/2006 | 12/26/2006 | 12/26/2006 | A | PASS |
Forrest France
|
|
|
Corrections have been completed, final life safety inspection passed.
|
PubWorks Occupancy Approval | 12/26/2006 | 12/26/2006 | 12/26/2006 | | DONE |
|
|
|
Signed off 12/21/06 R. Anderson.
|
BLD-Final | 12/21/2006 | 12/22/2006 | 12/22/2006 | P | NR |
Tom Arcoraci
|
|
|
pat; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
FIRE-Final Inspection | 12/21/2006 | 12/22/2006 | 12/22/2006 | A | FAIL |
Troy Cobbley
|
|
|
Repair and add emergency lights as marked on the electrical prints and provide the resubmittal plan sheet L-1 that addresses the islands and trees blocking fire dept. access.
|
Code Occupancy Approval Temp | 12/22/2006 | 12/22/2006 | 12/22/2006 | P | DONE |
Carol Montgomery
|
|
|
Bond is in place. Signed temporary - need small amt. of cncrete in ne cor. of bldg.; H/C parking signs, Bike rack
|
BLD-Conference | 12/18/2006 | 12/19/2006 | 12/19/2006 | A | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 12/18/2006 at 11:30:10 AM. Contact: ###-####.
|
BLD-Framing/Rough-in | 12/5/2006 | 12/7/2006 | 12/7/2006 | P | DONE |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 12/5/2006 at 7:34:58 AM. Contact: ###-####.
|
BLD-Wall cover | 12/5/2006 | 12/7/2006 | 12/7/2006 | A | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 12/5/2006 at 7:34:58 AM. Contact: ###-####. wip ok
|
BLD-Framing/Rough-in | 12/5/2006 | 12/5/2006 | 12/5/2006 | P | CANC |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 12/5/2006 at 7:35:35 AM. Contact: ###-####.
|
BLD-Framing/Rough-in | 11/1/2006 | 11/1/2006 | 11/1/2006 | P | PART |
Tom Arcoraci
|
|
|
pat ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie wip ok
|
Override - Parcel Holds | 1/1/1900 | 1/1/1900 | 11/1/2006 | | |
|
|
|
mec permit has a double per alan h
|
BLD-Wall cover | 10/20/2006 | 10/20/2006 | 10/20/2006 | A | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 10/20/2006 at 7:28:20 AM. Contact: ###-####.
|
BLD-Energy code compliance | 9/29/2006 | 10/2/2006 | 10/2/2006 | A | PART |
Tom Arcoraci
|
|
|
wip ok for cover
|
BLD-Wall cover | 9/29/2006 | 9/29/2006 | 9/29/2006 | P | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 9/29/2006 at 11:11:06 AM. Contact: ###-####. wip ok
|
Plan Reviewer's activity | | | 9/19/2006 | | PASS |
|
|
|
Reviewed and approved requested plan modification to change the construction type for this building from Type IIIB construction to Type IIB construction. This allows the elimination of the required 2-hour exterior beam and column protection. Plan sheets G1.0VE, A-6 VE, S-1 VE, S-5 VE AND S-6 VE. JCM
|
BLD-Framing/Rough-in | 9/15/2006 | 9/18/2006 | 9/18/2006 | P | PART |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 9/15/2006 at 4:28:02 PM. Contact: (208) wip ok
|
Plan Modification Accepted | | | 9/14/2006 | | |
|
|
|
Received letter to John Menard from Larson Architects, copy of and e-mail, 2 copies of the following pages: G1.OVE, A-6 VE, S-1 VE, S-5 VE, S-6 VE; taken to John Menard (per John no hold on project)
|
BLD-Foundation | 8/16/2006 | 8/16/2006 | 8/16/2006 | P | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 8/16/2006 at 10:06:59 AM. Contact: ###-####.
|
BLD-Foundation | 8/15/2006 | 8/15/2006 | 8/15/2006 | P | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 8/15/2006 at 9:07:25 AM. Contact: ###-####.
|
BLD-Framing/Rough-in | 7/19/2006 | 7/20/2006 | 7/20/2006 | A | PART |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 7/19/2006 at 11:27:58 AM. Contact: ###-####. mens room upper area ok to rock
|
BLD-Footing | 7/5/2006 | 7/5/2006 | 7/5/2006 | P | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 7/5/2006 at 11:28:22 AM. Contact: ###-####.
|
BLD-Footing | 6/29/2006 | 6/30/2006 | 6/30/2006 | A | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 6/29/2006 at 1:00:02 PM. Contact: ###-####. Six column pad footings at front of Bldg.....Appr plan sheet S-0 No special insp req.....but does not specify 2500PSI design .......Asked Steve to Check with Struct Engineer if special insp req.
|
BLD-Aging Inspection | 6/21/2006 | 6/21/2006 | 6/23/2006 | | PASS |
Tom Arcoraci
|
|
|
|
BLD-Footing | 6/21/2006 | 6/21/2006 | 6/22/2006 | P | PART |
Dave Hannah
|
|
|
###-#### - steve - Note: rebar seven column pads ok to pour
|
BLD-Foundation | 6/21/2006 | 6/21/2006 | 6/21/2006 | | CANC |
|
|
|
|
Override - Condition Holds | | | 6/21/2006 | | |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 5/1/2006 | | DONE |
|
|
|
was a resubmittal changed status
|
(F) Reprint permit | | | 5/1/2006 | | DONE |
|
|
|
|
OVERRIDE | | | 4/12/2006 | | |
|
|
|
|
Telephone call | | | 4/12/2006 | | DONE |
|
|
|
left mess for larson arch at ###-#### is ready
|
Print Occupancy Form | | | 4/12/2006 | | DONE |
|
|
|
|
Override - Parcel Holds | | | 4/12/2006 | | |
|
|
|
|
Override - Condition Holds | | | 4/12/2006 | | |
|
|
|
|
Permit Ready to Issue | | | 4/12/2006 | | DONE |
|
|
|
|
Plan assigned to (JCM) | 3/28/2006 | 3/28/2006 | 4/11/2006 | | PASS |
|
|
|
4/11/2006 09:55:55 JCM - activity updated through activity BLDA022 from case BLD05-03295.
|
Routing - PLAN CHECK | 4/10/2006 | | 4/11/2006 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/11/2006 | | DONE |
|
|
|
|
Routing - FIRE | 4/6/2006 | | 4/10/2006 | | PASS |
|
|
|
Inserted modified review comments into plans.
|
Routing - PLANNING | 4/4/2006 | | 4/6/2006 | | PASS |
|
|
|
Approved per modification.
|
Routing - PLAN CHECK | 3/28/2006 | | 4/4/2006 | | PASS |
|
|
|
John M
|
Plan Reviewer's activity | | | 4/4/2006 | | PASS |
|
|
|
Reviewed and approved plan modification to reduce the second floor area to a mezzanine and roof structural modificitions. JCM
|
Plan Modification Accepted | | | 3/28/2006 | | |
|
|
|
Plan modification accepted for for Bld05-03295 for the redeisgn of Reduce clerestory gallery to an overbuild roof, Eliminate the catwalk & west half of 2nd floor, Eliminate the elevator- the east 2nd fl is 2,996 sq ft, revise the reception desk area, add marcite panels to gym, spinning room, kids, and lower cadio area to 2 risers in lieu of 4. 3 copies of sheets G1.0VE, G1.1VE, C-1, C-2, ESC-1, L-1, SP1.0VE, SP1.1VE, D-1.0VE, A-1VE, A-2VE, A-3VE, A-4VE, A-5VE, A-6VE, A-7VE, A-8VE, A-9VE, A-10VE, A-11VE, A13.0VE, A-14.0VE, A-15.0VE, A15.1VE, A16.0VE, A16.1VE, A17.0VE, A17.1VE, A18.0VE, A19.0VE, A18.0VE, A19.0VE, A19.1VE, A20.0VE, A21.0VE, A21.1VE, A21.2VE, A21.3VE, A21.4VE, A21.5VE, A22.0VE, A23.0VE, S-0VE, S-1VE, S-2VE, S-3VE, S-3.1VE, S-31.VE, S-4VE, S-5VE, S-6VE, S-6.1VE, S-6.2VE, M-0VE, M-1aVE, M-1bVE, M-2VE, M-3VE, M-4VE, M-5VE, M-6VE, M-7VE, M-8VE, EN-1VE, EN-2VE, P-1VE, P-2VE, P-3VE, P-4VE, P-5VE, P-6VE, P-7VE, E0.0VE, E1.0VE, E1.1VE, E1.2VE, E2.0VE, E2.1DVE, E2.1FVE, E2.1LVE, E2.1MPVE, E2.1PVE, E2.1SVE, E2.2FVE, E2.2LVE, E2.2MPVE, E2.2PVE, E2.2SVE, E2.3RVE, AV-1VE, AV-2VE, PL-1.0VE, PL-1.1VE, PL-1.2VE, PL-1.3VE, PL-1.4VE. Routed to John M.
|
Override - Condition Holds | | | 3/13/2006 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 3/13/2006 | | DONE |
|
|
|
|
Telephone call | | | 2/14/2006 | | |
|
|
|
darrin carroll called me to let the applicant know they need to complete the right of way aquisition with achd. i called brad marczuk to let him know.
|
Permit Ready to Issue | | | 2/2/2006 | | DONE |
|
|
|
|
Print Occupancy Form | | | 2/2/2006 | | DONE |
|
|
|
|
Telephone call | | | 2/2/2006 | | DONE |
|
|
|
talked to brad marczuk at ###-#### permit is ready & need achd-(there are issues on that)
|
Plan resubmittals received | | | 2/1/2006 | | |
|
|
|
3 copied of S-5 and 1 transmittal letter taken to John Menard
|
Routing Off Site - STRUCTURAL | 2/1/2006 | | 2/1/2006 | | PASS |
|
|
|
Reviewed and approved final structural resubmittal. JCM
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/1/2006 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 1/19/2006 | | 2/1/2006 | | PASS |
|
|
|
|
Plan assigned to (JCM) | 11/30/2005 | | 2/1/2006 | | PASS |
|
|
|
2/1/2006 15:44:04 JCM - activity updated through activity BLDA022 from case BLD05-03295.
|
Plan resubmittals requested | | | 1/19/2006 | | DONE |
|
|
|
E-mailed the architect with a copy of the comment list from the consulting structural engineer for the second review. JCM
|
Routing - FIRE | 1/11/2006 | | 1/19/2006 | | PASS |
|
|
|
Recieved documentation regarding pools chemicals from responsible party. Documentation acceptable.
|
Routing Off Site - STRUCTURAL | 1/10/2006 | | 1/19/2006 | | FAIL |
|
|
|
Called PDQ for pick up - Received an e-mailed comment from the consulting structural engineer requesting additional calculations. JCM
|
Plan resubmittals received | | | 1/12/2006 | | DONE |
|
|
|
Received 3 copys of sheets S-1,S-5,S-6.1,S-6.2,S2.1L,S2.2L taken to John M.
|
Plan resubmittals received | | | 1/12/2006 | | DONE |
|
|
|
Received 2 copys of sheet C1.01, & 3 copys of sheets G1.0,G1.1,C-1,ESC-1,L-1,SP-1.0,SP-1.1,D-1.0,A-1,A-2,A-3,A-4,A-5,A-6,A-7,A-8,A-9,A-10,A-11.0,A-13.0,A-14.0,A-15.0,A-15.1,A-16,A-16.1,A-17,A-17.1,A-18.0,A-19.0,A-19.1,A-20.0,A-21.0,A-21.1,A-22.0,A-23.0,S-2,S-3,S-3.1,S-4,S-4A,S-5,S-6,S-6.1,S-6.2,M-0,M-1A,M-18,M-2,M-2A,M-.3,M-4,M-5,M-6,M-7,M-8,EN-1,EN-2,P-1,P-2, P-3,P-4,P-5,P-6,P-7,E0.0,E1.0,E1.1,E1.2,E1.2,E2.0,E2.1P,E2.1F,E2.1L,E2.1MP,E2.1P,E2.1S,E2.2F,E2.2L,E2.2L,E2.2MP,E2.2P,E2.2S,E2.3R,AV-1,AV-2,PL1.0,PL1.1,PL1.2,PL1.3,PL1.4PL1.5 taken to John M
|
Routing - PLANNING | 1/10/2006 | | 1/11/2006 | | PASS |
|
|
|
Approved per DRH05-00307 and CUP. Cody Riddle and Sarah Schafer. 1/11/06
|
Plan Reviewer's activity | | | 1/10/2006 | | PASS |
|
|
|
Reviewed and approved resubmittals with red lined notes on plans. JCM
|
Routing - PLAN CHECK | 12/20/2005 | | 1/10/2006 | | PASS |
|
|
|
|
Plan resubmittals received | | | 1/10/2006 | | DONE |
|
|
|
Received 1 memo,1 letter to Brad Marczuk,1 united water, 1 letter to John M. 1 letter to Mary F. 1 transmittal letter,4 review comment calcs,1 hazardous material, 3 copys of sheets G1.0,G1.1,C-1,L-1,SP-1.0,D-1.0,A-1,A-2,A-3,A-7,A-9,A-19.0,A-19.1,A-21.1,A-23.0,S-1,S-5,S-6.1,S-6.2,M-1A,P-1,P-2,P-4,P-5,P-7,E0.0,E1.1,E1.2,E2.1D,E2.1F,E2.1L,E2.1P,E2.1S,E2.2F,E2.2L,E2.2S Taken to John M.
|
Routing - FIRE | 12/15/2005 | | 12/20/2005 | | FAIL |
|
|
|
Faxed comments to the architect.
|
1st review completed | | | 12/20/2005 | | FAIL |
|
|
|
Failed Structural, Planning, Plan Check and Fire.
|
Routing - PLAN CHECK | 12/14/2005 | | 12/15/2005 | | FAIL |
|
|
|
|
Plan resubmittals requested | | | 12/15/2005 | | DONE |
|
|
|
E-mailed the architect a copy of the plan review comment list requesting revisions. JCM
|
Routing - PLANNING | 12/8/2005 | | 12/14/2005 | | FAIL |
|
|
|
Contacted applicant late Friday to let them know that they were still missing some planter islands in the parking field. They had indicated they would have drawings to me by Tuesday so I held on to the building set in order to finalize. I have not seen the revised plans so I am going to forward the documents on for continued routing. SMS 12/14/05
|
Plan resubmittals requested | | | 12/9/2005 | | DONE |
|
|
|
E-mailed the architect a copy of the structural plan review requesting revisions. JCM
|
Routing Off Site - STRUCTURAL | 11/30/2005 | | 12/8/2005 | | FAIL |
|
|
|
Received e-mailed comment list from the consulting structural engineer requesting revisions. JCM
|
Routing - PLUMBING | 12/6/2005 | | 12/8/2005 | | PASS |
|
|
|
per plans and 2003 upc
|
Routing - Erosion and Sediment | 12/5/2005 | | 12/6/2005 | | PASS |
|
|
|
ESC plan approved with attached conditions.
|
Routing - PUBLIC WORKS | 12/1/2005 | | 12/5/2005 | | PASS |
|
|
|
|
Routing - PLANNING Land Div | 11/30/2005 | | 12/1/2005 | | PASS |
|
|
|
Legal parcel in the County prior to annexation into the City.
|
Plans ACCEPTED BY PLAN TECH | | | 11/30/2005 | | |
|
|
|
|
Plan routing begun/NEW & ADDTN | | | 11/30/2005 | | |
|
|
|
|
Application received | | | 11/30/2005 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 11/30/2005 | | |
|
|
|
|
Fee Review-notes | 11/30/2005 | 11/30/2005 | | | |
|
|
|
|