Case Summary (BLD) | | | 2/16/2010 | | DONE |
Sam Zahorka
|
|
|
|
Case Summary (BLD) | | | 12/2/2009 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 10/26/2009 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 10/16/2006 | | |
|
|
|
|
BLD-Final | 7/5/2006 | 7/5/2006 | 7/5/2006 | P | PASS |
Jim Storey
|
|
|
mike; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley
|
DOC - Permit Finaled | 7/5/2006 | 7/5/2006 | 7/5/2006 | P | PASS |
Jim Storey
|
|
|
|
BLD-Other | 6/12/2006 | 6/12/2006 | 6/12/2006 | P | PASS |
Jim Storey
|
|
|
canan ; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles support posts redug to pad ok to fill with concrete to meet engineering.
|
BLD-Conference | 5/23/2006 | 5/23/2006 | 5/23/2006 | | DONE |
Jim Storey
|
|
|
wip
|
Telephone call | | | 2/15/2006 | | DONE |
|
|
|
I spoke with the Engineer of Record. Explained Field Correction notice. He stated he would do site evaluation on the next Monday, and send in his letter of correction to Plan review for approval. (SRZ)
|
BLD-Conference | 2/13/2006 | 2/13/2006 | 2/14/2006 | P | FAIL |
Jim Storey
|
|
|
tana or cell at ###-####; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa need engineer of record to submit to planreview as built not per org. design. field review of project.
|
BLD-Conference | 1/30/2006 | 1/30/2006 | 1/30/2006 | P | PASS |
Jim Storey
|
|
|
need before 3pm//homeowner concerned about footings and framing not correctly done by GC// tana; Phone #: ###-#### Internet Inspection Request from: Letitia Mesaframing ok pending grading around bldg. and driveway instaled.
|
BLD-Footing | 12/5/2005 | 12/6/2005 | 12/6/2005 | A | PASS |
Jim Storey
|
|
|
jim; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
Plan assigned to (SRZ) | 12/1/2005 | 12/1/2005 | 12/1/2005 | | PASS |
|
|
|
12/1/2005 15:17:02 SRZ - activity updated through activity BLDA022 from case BLD05-03308.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/1/2005 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 12/1/2005 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 12/1/2005 | | DONE |
|
|
|
|
Application received | | | 12/1/2005 | | |
|
|
|
|