Third Notice BLD | 1/8/2007 | 1/8/2007 | 2/6/2007 | | DONE |
|
|
|
Second Notice has not been responded to.
|
Fee Review-notes | 12/5/2005 | 12/5/2005 | 2/6/2007 | | DONE |
|
|
|
|
Second Notice BLD | 12/27/2006 | 12/27/2006 | 1/8/2007 | | DONE |
|
|
|
First Notice has not been responded to.
|
First Notice | | 11/17/2006 | 12/27/2006 | | DONE |
|
|
|
|
Permanent Occupancy | | 11/17/2006 | 11/17/2006 | | DONE |
|
|
|
|
Permanent occupancy UNPAID FEE | | | 11/17/2006 | | DONE |
|
|
|
Perm. Occ. Cert. # 11304 issued 11-17-06 to the Walker Dental ofc. bldg.
|
PubWorks Occupancy Approval | 11/14/2006 | 11/14/2006 | 11/14/2006 | | DONE |
|
|
|
R. Anderson signed off on project 11/09/2006.
|
BLD-Final | 11/10/2006 | 11/13/2006 | 11/13/2006 | A | PASS |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 11/10/2006 at 8:31:10 AM. Contact: ###-####. Handrail installed. Gave temp occ. Will be ok for perm occ once code enforcement has finaled.
|
BLD-Final | 11/8/2006 | 11/9/2006 | 11/9/2006 | P | FAIL |
Mike Jordan
|
|
|
dana; Phone #: ###-#### Internet Inspection Request from: Patricia Smith. Needs to install additional handrail.
|
FIRE-Final Inspection | 11/8/2006 | 11/9/2006 | 11/9/2006 | A | PASS |
Forrest France
|
|
|
Fire life safety passed final inspeciton.
|
Code Occupancy Approval Temp | | | 11/9/2006 | | |
|
|
|
Posted Bond for trash enclosure. Temporary Occ. O.K. ($1,650.00).
|
FIRE-Final Inspection | 11/7/2006 | 11/8/2006 | 11/8/2006 | A | FAIL |
Forrest France
|
|
|
Project related fire sprinkler permit failed final inspection.
|
FIRE-Final Inspection | 11/7/2006 | 11/7/2006 | 11/7/2006 | P | FAIL |
Forrest France
|
|
|
The project related fire sprinkler permit must be approved and finaled prior to building life safety final.
|
BLD-Framing/Rough-in | 9/14/2006 | 9/15/2006 | 9/15/2006 | A | PASS |
Mike Jordan
|
|
|
dena Note: fire wall; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles. Inspected 1hr wall assembly and horizontal wall assembly for stair enclosure.
|
BLD-Energy code compliance | 9/1/2006 | 9/5/2006 | 9/5/2006 | A | PASS |
Mike Jordan
|
|
|
dana; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley 1hr staairway const. has been addressed. Received RFI from Architect regarding 1hr const. Will inspect stairway when one sided. insul. ok.
|
BLD-Framing/Rough-in | 8/29/2006 | 8/30/2006 | 8/30/2006 | P | FAIL |
Mike Jordan
|
|
|
dana ; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley. 1hr construction required at stairway enclosure from basement to 1st floor.
|
BLD-Wall cover | 6/29/2006 | 6/29/2006 | 6/29/2006 | P | PASS |
Mike Jordan
|
|
|
DANA; Phone #: ###-#### Internet Inspection Request from: Darla Downs. Exterior shear wall nailing.
|
BLD-Footing | 5/31/2006 | 5/31/2006 | 5/31/2006 | P | PART |
Mike Jordan
|
|
|
Phone #: ###-#### Internet Inspection Request from: Rita DeYoung perimeter and interior footings. footing backfill with clean drain rock.
|
BLD-Foundation | 5/15/2006 | 5/15/2006 | 5/15/2006 | P | PASS |
Mike Jordan
|
|
|
jed; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles. Basement walls
|
BLD-Footing | 5/9/2006 | 5/10/2006 | 5/10/2006 | A | PART |
Mike Jordan
|
|
|
Phone #: ###-#### Internet Inspection Request from: Rita DeYoung. wip. Noted no special insp. required for conc. Contractor noted that soils was inspected for bottom of footing for basement walls and will have documentation on next insp.
|
(F) Reprint permit | | | 4/20/2006 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 4/19/2006 | | |
|
|
|
|
Routing - PLAN CHECK | 3/22/2006 | | 3/23/2006 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/23/2006 | | DONE |
|
|
|
|
Print Occupancy Form | | | 3/23/2006 | | |
|
|
|
|
Permit Ready to Issue | | | 3/23/2006 | | DONE |
|
|
|
|
Telephone call | | | 3/23/2006 | | DONE |
|
|
|
talked to shawn reeder at ###-#### that permit is ready & need achd
|
Plan assigned to (MLO) | 12/8/2005 | | 3/23/2006 | | PASS |
|
|
|
3/23/2006 09:04:58 MLO - activity updated through activity BLDA022 from case BLD05-03335.
|
Plan resubmittals received | | | 3/21/2006 | | DONE |
|
|
|
received 1 response taken to Mike O.
|
Routing - FIRE | 3/13/2006 | | 3/14/2006 | | PASS |
|
|
|
Faxed review comments to architect. Included review comments in plans.
|
Routing - PLAN CHECK | 3/14/2006 | | 3/14/2006 | | PEND |
|
|
|
|
Routing - PLAN CHECK | 3/10/2006 | | 3/13/2006 | | FAIL |
|
|
|
corrections sent to performance engineering
|
Plan resubmittals requested | | | 3/13/2006 | | DONE |
|
|
|
IBC corrections not completed from 12/29/05 MLO
|
Plan resubmittals received | | | 3/9/2006 | | |
|
|
|
Received 2 copies of Response to plan review comments, 2 copies of responce to fire plan review comments, 2 copies of the following- A-0, A-1, A-2, A-3, A-4, A-5, A-6, A-7, A-8, E0.0, E2.0, E2.0L, E2.0MP, E2.0P, E2.0S, E3.0, E3.1, P-1, M-1, P-2 and taken to Mike Otto
|
Routing - PLANNING | 2/27/2006 | | 3/2/2006 | | PASS |
|
|
|
Approved per DRH05-00281.
|
Routing - PLAN CHECK | 1/9/2006 | | 1/9/2006 | | PEND |
|
|
|
|
Routing - FIRE | 12/29/2005 | | 1/6/2006 | | FAIL |
|
|
|
Review faxed to applicant.
|
1st review completed | | | 1/6/2006 | | FAIL |
|
|
|
Failed ESC, Planning, Plan Check, Fire
|
Routing - PLAN CHECK | 1/6/2006 | | 1/6/2006 | | PEND |
|
|
|
|
Plan resubmittals received | | | 1/5/2006 | | DONE |
|
|
|
Received 2 Erosion & sediment control plans Taken to Mike O.
|
Routing - PLAN CHECK | 12/20/2005 | | 12/29/2005 | | FAIL |
|
|
|
corrections sent to engineer.
|
Plan resubmittals requested | | | 12/29/2005 | | DONE |
|
|
|
IBC corrections
|
Routing - PLANNING | 12/14/2005 | | 12/20/2005 | | FAIL |
|
|
|
Building permit documents do not comply with Design Review conditions of approval.
|
Routing - PLUMBING | 12/13/2005 | | 12/14/2005 | | PASS |
|
|
|
all water piping in the attic must be installed under an insulation tent at the rough-in.
|
Routing - Erosion and Sediment | 12/12/2005 | | 12/13/2005 | | FAIL |
|
|
|
ESC plan does not meet requirments per BMC 8-17. Checklist faxed to PD.
|
Routing - PUBLIC WORKS | 12/9/2005 | | 12/12/2005 | | PASS |
|
|
|
|
Routing - PLANNING Land Div | 12/8/2005 | | 12/9/2005 | | PASS |
|
|
|
Property located on a platted lot in Medico Sub. (1997)
|
Plans ACCEPTED BY PLAN TECH | | | 12/8/2005 | | |
|
|
|
|
Plan routing begun/NEW & ADDTN | | | 12/8/2005 | | |
|
|
|
|
Application received | | | 12/5/2005 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 12/5/2005 | | |
|
|
|
|
Routing - Erosion and Sediment | 1/6/2006 | | 1/9/2005 | | PASS |
|
|
|
ESC resubmittal approved with attached conditions.
|