Permit Information
Permit NumberBLD05-03340
StatusFinaled
Name STEED CONSTRUCTION
Site Address 12754 W LASALLE ST
Project NameLASALLE BLDG
Customer Number10116
ePlanReviewNo
Description
(LASALLE OFFICE BUILDING) This building is fire sprinklered for area increase. To construct interior tenant improvements within a 16,365 square foot building for a tenant who will occupy the entire building. The building shell was constructed under permit BLD04-00958. Work is to include interior nonbearing walls, 2 restrooms accessible to the disabled, two shower rooms accessible to the disabled, an access floor system, suspended ceilings, and finishes. The work is required to comply with the approved drawings, the plan review report, and all applicable codes. The fire sprinkler system shall comply with NFPA 13 as regulated by the Fire Department. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice BLD4/14/20064/14/20068/10/2006 DONE
Second Notice has not been responded to.
Second Notice BLD3/29/20063/29/20064/14/2006 DONE
First Notice has not been responded to.
First Notice 3/7/20063/29/2006 DONE
Permanent occupancy UNPAID FEE  3/7/2006 DONE
Perm. Occ. Cert. # 10927 issued 3-7-06 to CRI.
BLD-Final3/3/20063/6/20063/6/2006APASS
DetailsJim Sly
Scheduled by a contractor via Hello! on 3/3/2006 at 1:43:20 PM. Contact: ###-####.
OK for Perm Occ. :)
Permanent Occupancy 3/6/20063/6/2006 DONE
Details
BLD-Final2/27/20062/28/20062/28/2006PNR
DetailsJim Sly
Scheduled by a contractor via Hello! on 2/27/2006 at 4:04:32 PM. Contact: ###-####.
FIRE-Final Inspection2/27/20062/28/20062/28/2006APASS
DetailsTroy Cobbley
Life safety finaled
FIRE-Final Inspection2/26/20062/27/20062/27/2006PFAIL
DetailsTroy Cobbley
provide exit signs as per the approved plans and provide sensors for the door mags and test
BLD-Framing/Rough-in2/22/20062/23/20062/23/2006APASS
DetailsJim Sly
ceiling grid-mike; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
BLD-Framing/Rough-in2/10/20062/13/20062/13/2006APART
DetailsJim Sly
ceiling grid inspec///mike; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
OK to install border tile at approx 6 offices along S wall of Bldg
BLD-Framing/Rough-in1/24/20061/25/20061/25/2006APASS
DetailsJim Sly
Mike; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong
Issue PAID IN FULL permit  1/13/2006 DONE
Print Occupancy Form  1/11/2006 DONE
Permit Ready to Issue  1/11/2006 DONE
Telephone call  1/11/2006 DONE
lft vm with west steele ###-#### thta permit and fees are ready to be picked up
Routing - PLAN CHECK1/5/2006 1/10/2006 PASS
Drawings approved after resubmittal review.
PLANS/APPL TAKEN TO FRONT DESK  1/10/2006 DONE
Plan assigned to (CJW)12/9/2005 1/10/2006 PASS
1/10/2006 16:28:20 CJW - activity updated through activity BLDA022 from case BLD05-03340.
Plan resubmittals received  1/6/2006  
Received 1 letter,1 general info sheet,& 2 copys of sheets A2.1,A3.1,A7.1 Taken to Carl W.
Routing - FIRE12/29/2005 1/5/2006 PASS
Review comments to be field verified.
1st review completed  1/5/2006 FAIL
Routing - PLAN CHECK12/12/2005 12/29/2005 FAIL
The IBC plan review was started on December 28, 2005 and was finished the next day. Revised drawings were required. See the plan review report.
Routing - PUBLIC WORKS12/9/2005 12/12/2005 PASS
Plans ACCEPTED BY PLAN TECH  12/8/2005  
Application received  12/6/2005  
Recd Pcfee & Taken To Pln CK  12/6/2005  
Fee Review-notes12/6/200512/6/2005