Permit Information
Permit NumberBLD05-03344
StatusFinaled
Name BENCHMARK CONSTRUCTION
Site Address 1211 S COLE RD
Project Name 
Customer Number 
ePlanReviewNo
Description
(BOISE IDAHO LDS TEMPLE - CELESTIAL ROOM REMODEL) Only the basement of this building is fire sprinklered. To remodel the 671 square foot Celestial Room located within the 25,500 square foot 1st story of the Boise Idaho Temple. Work includes relocating a set of double doors, installing a new ceiling dome with decorative glass panels, modifying the existing roof trusses, and installing a chandelier hoist. The work is required to comply with the approved drawings, the plan review report, and all applicable codes. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
FIRE-Final Inspection1/20/20061/23/20061/23/2006PPASS
DetailsTroy Cobbley
Inspection performed by Sam Rogers. Life safety finaled.
BLD-Final1/23/20061/23/20061/23/2006APASS
DetailsTroy James
Ok for final.
DOC - Permit Finaled  1/23/2006 DONE
DetailsTroy James
(F) Reprint permit  1/19/2006 DONE
Issue PAID IN FULL permit  1/11/2006 DONE
Telephone call  1/10/2006 DONE
Left message for david that permit is ready & fees///1/10/06 @ 11:39am BAS
PLANS/APPL TAKEN TO FRONT DESK  12/30/2005 DONE
Permit Ready to Issue  12/30/2005 DONE
Inspection Record Card- Bld  12/30/2005 DONE
Telephone call  12/30/2005 DONE
All fees were added and took plans back to Carl Westfall to call Architect to sign///12/30/05 BAS
Plan assigned to (CJW)12/12/2005 12/30/2005 PASS
12/30/2005 10:31:07 CJW - activity updated through activity BLDA022 from case BLD05-03344.
Routing - PLAN CHECK12/27/2005 12/30/2005 PASS
(12-28-05) Item #5 is still not resolved. E-mailed the Architect asking for a resolution. (12-30-05) The drawings were approved after the resubmittal review.
Plan resubmittals received  12/29/2005 DONE
More resubmittals received.
Telephone call  12/28/2005 DONE
Talked to Dave Everson (arch rep) and discussed the content of the E-mail. Item #5 needs to be resolved.
Routing - FIRE12/21/2005 12/27/2005  
Pulled back from Fire. No plan review required. Fire Code issues will be field verified. CJW
Plan resubmittals received  12/23/2005 DONE
Cover letter from architect and 2 copies of plan sheets A-1.0 and A-1.1 received and forwarded to Carl W.
Routing - PLAN CHECK12/12/2005 12/21/2005 FAIL
The IBC plan review was started on December 16, 2005 and was finished on December 21, 2005. Revised drawings were required. See the plan review report.
1st review completed  12/21/2005 DONE
Plans ACCEPTED BY PLAN TECH  12/7/2005  
Application received  12/6/2005  
Recd Pcfee & Taken To Pln CK  12/6/2005  
Fee Review-notes12/6/200512/6/2005