Permit Information
Permit NumberBLD05-03359
StatusFinaled
Name SAUCERMAN CONSTRUCTION
Site Address 7545 S EISENMAN RD
Project NameDENT PRO
Customer Number 
ePlanReviewNo
Description
DentPro Autobody - To construct a new 9,280 square foot, one story pre-engineered metal building and related site improvements. This building will be use as a full service autobody repair and paint facility. This building contains a 1,680 square foot office with restrooms, break room, locker room and parts storage room. The remainder of the building consists of repair bays, paint preparation areas, detailing area and premanufactured paint booth, paint mixing room and preparation deck area. This building is being reviewed as non-separated uses. All construction per the approved plans and attached comment list. DRH05-00349 JCM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice BLD10/1/200710/1/200710/8/2007 DONE
First Notice has not been responded to.
First Notice 9/6/200710/1/2007 DONE
Code Occupancy Approval  9/6/2007 DONE
Final inspection for landscaping completed this date. Passed.
Permanent Occupancy  9/6/2007 DONE
PubWorks Occupancy Approval8/10/20078/10/20078/10/2007 DONE
FIRE-Final Inspection8/8/20078/9/20078/9/2007PPASS
DetailsForrest France
c/n items complete, fire life safety finaled.
BLD-Final8/7/20078/7/20078/8/2007PNR
DetailsJim Storey
Richard; Phone #: ###-#### Internet Inspection Request from: Darla Downs pending fire
FIRE-Final Inspection7/19/20077/20/20077/20/2007PFAIL
DetailsTroy Cobbley
The contractor needs to provide the interlocks as per chapter 15 of the IFC
Temporary occupancy7/20/200710/18/20077/20/2007 DONE
FIRE-Final Inspection7/20/20077/23/20077/20/2007ADONE
DetailsForrest France
greg- pls call 30 mins prior; Phone #: ###-#### Internet Inspection Request from: Victoria Apatang
BLD-Final6/21/20076/22/20076/22/2007PPART
DetailsJim Storey
rich; Phone #: ###-#### Internet Inspection Request from: Victoria Apatang office area only. ok for temp occ.
FIRE-Final Inspection6/21/20076/22/20076/22/2007APART
DetailsTroy Cobbley
A temporary occupamcy was given with dave hannimans permission. The items that need to be completed are the prep booth. Its interlocks and electrical wiring within 5'/3' needs to be addressed when installed. A written notice was given to the building contractor stating the prep booth is not to be used for its intended purpose or for storage. The air outlets are to be plugged. The intelocks on the paint booth operated per IFC chapter 15 and is approved for used as far as my signoff.
FIRE-Final Inspection6/14/20076/15/20076/15/2007AFAIL
DetailsTroy Cobbley
See the correction notice for a total list of items that need correcting. The list includes parking lot striping so that fire dept access can be verified, building address numbers, and all exit signs repaired, signage at the paint booths, extending the exhaust stacks to the 6' minimum and testing of all interlocks per IFC chapter 15. I also let the contractor know that non hardened locks will be allowed to be used on the two parking lot gates. Also there is one outstanding fire sprinkler permit.
Print Occupancy Form  5/29/2007 DONE
BLD-Other5/7/20075/7/20075/7/2007PPASS
DetailsJim Storey
rich - cieling cover; Phone #: ###-#### Internet Inspection Request from: Victoria Beall
BLD-Framing/Rough-in5/2/20075/2/20075/2/2007PPASS
DetailsJim Storey
Rich Firewall; Phone #: ###-#### Internet Inspection Request from: Andrea Whiteman
BLD-Framing/Rough-in3/30/20074/3/20074/2/2007ACANC
DetailsJim Storey
Greg; Phone #: ###-#### Internet Inspection Request from: Stacie Backus Inspection cancelled from web by: Patricia Smith
BLD-Framing/Rough-in3/29/20073/30/20073/30/2007AFAIL
DetailsJim Storey
###-#### greg pls call first
Override - People Holds  3/29/2007  
Override - People Holds  3/29/2007  
BLD-Aging Inspection3/14/20073/14/20073/14/2007 PASS
DetailsJim Storey
wip ncfi
BLD-Aging Inspection1/8/20071/8/20071/8/2007 PASS
DetailsJim Storey
wip pwsi
BLD-Footing11/6/200611/7/200611/7/2006APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 11/6/2006 at 3:02:35 PM. Contact: ###-####.pwsi
(F) Reprint permit  10/4/2006  
Issue PAID IN FULL permit  10/3/2006 DONE
Routing - PLAN CHECK9/27/2006 9/28/2006 PASS
PLANS/APPL TAKEN TO FRONT DESK  9/28/2006 DONE
Print Occupancy Form  9/28/2006  
Telephone call  9/28/2006 DONE
tlk to eileen davison ###-#### that permit and fees are ready to be picked up but needs GC, ACHD, RP
Permit Ready to Issue  9/28/2006 DONE
Plan assigned to (JCM)12/9/2005 9/28/2006 PASS
9/28/2006 09:55:48 JCM - activity updated through activity BLDA022 from case BLD05-03359.
Routing - PLANNING9/26/2006 9/27/2006 PASS
Approved per DRH05-00349 mod #1. See comments on Sheet A-1.0.
Routing - PLAN CHECK9/13/2006 9/26/2006  
Routing - PLANNING9/8/2006 9/12/2006 FAIL
Design Review Modification is required for all changes made to site and building since original Design Review approval.
Routing - PLUMBING8/31/2006 9/8/2006 PASS
per plans and 2003 upc
Routing - PUBLIC WORKS8/28/2006 8/31/2006 PASS
Plan resubmittals received  8/30/2006  
received letter of transmittal from thomas r ensley & associates arch, "2" sets of structural engineers calculations for stapley engineering including 21 pages each-also "2" sheets of S1.1 & "2" sheets of S5.1-plans taken to john menard
Plan resubmittals requested  8/28/2006 DONE
E-mailed the architect a copy of the review letter requesting structural clarification. JCM
Routing - PLAN CHECK4/6/2006 8/28/2006 FAIL
Plan resubmittals received  8/2/2006 DONE
Received transmittal letter,1 structural calcs, 1 revised structural calcs & 3 copys of sheets A-0.0,C1.0,C2.0,C2.1,C3.0,A-1.0,S0.1,S1.1,S-1,S-2,S-2A,S-3,S-4,S-5,S-6,S-7,S-8,S-9,S-10,A-3.0,A-3.1,A-4.0,A-5.0, EN1.0,M0.0,M1.0,M2.0,M3.0,P0.0,P1.0,P1.1,P2.0,P3.0,E1.0,E2.F1,E2.L1,E2.L2,E2.P1,E2.T1,E3.0 taken to John M.
Routing - PUBLIC WORKS6/12/2006 6/13/2006 PASS
Routing - PLAN CHECK5/17/2006 6/12/2006  
Routing - Erosion and Sediment5/17/2006 5/17/2006 PASS
ESC plan approved with attached conditions. See original approval on 3/10/06.
Routing - PLUMBING5/17/2006 5/17/2006 FAIL
Plan resubmittals requested  4/17/2006 DONE
E-mailed the architect requesting revised plans for the Speck Building reflecting the change in the building size and layout. JCM
Routing - PUBLIC WORKS4/11/2006 4/14/2006 FAIL
Routing - PLANNING4/3/2006 4/6/2006 PASS
Changes approved.
Plan resubmittals received  4/4/2006  
Received 2 transmittals,1 letter & 5 copys of sheet C2.0 taken to John M.
Routing - PLUMBING3/31/2006 4/3/2006 PASS
still ok
Routing - Erosion and Sediment3/30/2006 3/31/2006 PASS
ESC plan has already been approved with conditions 3/10/06.
Routing - PUBLIC WORKS3/28/2006 3/29/2006 FAIL
Needs additional calcs for site retaining walls. Drainage plan preparer needs to request variance to seepage bed separation distances specified in City Drainage Design Manual. Contact Jim Wyllie at ###-####
Plan Reviewer's activity  3/28/2006 DONE
Plans have been resubmitted that have most plan sheets revised to reduce the building size and revise site. Inserted and stamped plans and started rerouting to most departments for a second review. JCM
Routing - PLAN CHECK3/10/2006 3/28/2006  
Plan resubmittals received  3/23/2006 DONE
Received 1transmittal letter,1 plan review,1 review report,2 addendum # 3, 1 structural tests and special inspections, 1 vicinity map,1 O & M , 1 ESC Narritive, 3 8 1/2 x11 copys of Skinner Land Survey,1 Retaining Wall Design, & 2 copys of sheets A-00,C1.0,C2.0,C2.1,C3.0,S0.1,S1.1,S5.1,A-1.0,A-3.0,A-3.1,A-4.0,A-5.0,EN1.0,M0.0,M1.0,M2.0,M3.0,P0.0,P1.0,P2.0,P3.0,E1.0,E2.F1,E2.L1,E2.L2,E2.P1,E2.T1,E3.0 taken to John M.
Routing - Erosion and Sediment3/10/2006 3/10/2006 PASS
ESC plan approved with attached conditions.
Routing - PLAN CHECK1/4/2006 3/10/2006  
Plan resubmittals received  3/9/2006  
Received 1 copy of transmittal letter, 2 copies of ESC Narrative, 2 copies of ESC plans and taken to John M.
Plan resubmittals received  1/20/2006 DONE
Received transmittal letter,1 Addenda & Clarifications Addendum & 2 copys of sheets A-3.0,A-3.1,A-5.0 talen to John M.
1st review completed  1/4/2006 FAIL
FAILED EROSION, PUBLIC WORKS, PLAN CHECK.
Routing - FIRE12/23/2005 1/2/2006 PASS
Routed to F. Varley 12/27.
Routing - PLAN CHECK12/19/2005 12/23/2005 FAIL
John M.
Plan resubmittals requested  12/23/2005 DONE
E-mailed the architect a copy of the plan review comment list requesting revisions. JCM
Routing - PLANNING12/16/2005 12/19/2005 PASS
Sara S.-Approved per DRH05-00349
Routing - PLUMBING12/16/2005 12/16/2005 PASS
approved per plan, note, 2003 UPC and detail provided on oil interceptor.
Routing - Erosion and Sediment12/16/2005 12/16/2005 FAIL
ESC plan does not meet requirments according to BMC 8-17. Checklist faxed to designer.
Routing - PUBLIC WORKS12/12/2005 12/16/2005 FAIL
Retaining wall details & eng. not adequate: Contact Jim Wyllie ###-####: Site drainage revisions required: Contact Brian Murphy ###-####: Need an Easement or proof of an easement for sanitary sewer: Contact Jim Pardy ###-####
Routing - PLANNING Land Div12/9/2005 12/12/2005 PASS
Property created by Record of Survey #4715, signed by City Engineer on 8/12/1999.
Application received  12/9/2005  
Override - Parcel Holds  12/9/2005  
Recd Pcfee & Taken To Pln CK  12/9/2005  
Override - Parcel Holds  12/9/2005  
Plans ACCEPTED BY PLAN TECH  12/9/2005  
Plan routing begun/NEW & ADDTN  12/9/2005  
Fee Review-notes12/9/200512/9/2005