Permit Information
Permit NumberBLD05-03374
StatusFinaled
Name ADEM MESINOVIC
Site Address 11450 W GREYLING CT
Project Name 
Customer Number 
ePlanReviewNo
Description
Early start approved per Steve Monroe///12/15/05 BAS - To construct a 3447sq.ft. Two story single family dwelling (2121sq.ft. Main level / 1326sq.ft. Upper level) with a 170sq.ft. Covered front porch, and a 866sq.ft. Attached three car garage per approved plans, all red-lining, and Plan review report. THE PERMIT HOLDER is responsible to comply with current wall bracing requirements adopted by Boise city. PDR-6-79 and R-1A zoning/setbacks as per Carl Miller with Planning and Zoning. (SRZ)
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
(F) Reprint permit  5/22/2007  
(F) Reprint permit  5/21/2007  
(F) Reprint permit  5/18/2007  
BLD-Final10/20/200610/20/200610/20/2006PPASS
DetailsMike Jordan
adem; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
DOC - Permit Finaled10/20/200610/20/200610/20/2006PPASS
DetailsMike Jordan
Handrail has been repaired.
BLD-Final9/15/20069/15/20069/15/2006PFAIL
DetailsMike Jordan
adem; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles. Handrail repair is not code compliant. All other issues have been repaired.
BLD-Final9/11/20069/12/20069/12/2006AFAIL
DetailsMike Jordan
adem ###-####. Needs to post address. Additional smoke alarm required outside of masterbedroom. Bottom step exceeds the 7.75 inch max height at masterbedroom. Handrail must extend for full flight of stairs. c/n posted.
Meeting  9/11/2006 DONE
per conversation with Jenifer go ahead and schedule the final inspection for Adem Mesinovic see attached letter in documents.
Case Summary (BLD)  9/11/2006 DONE
Override - People Holds  9/11/2006  
(F) Reprint permit  9/5/2006 DONE
Plan Reviewer's activity  5/31/2006  
Ned with Idaho Best called and requested his name to be taken off of ESC permit. I told him he would need to write a letter and bring it in to the city. (SRZ)
BLD-Energy code compliance4/17/20064/18/20064/18/2006APART
DetailsJim Sly
ned; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
BLD-Framing/Rough-in4/13/20064/14/20064/14/2006APASS
DetailsMike Jordan
Ned; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong. Need approved plans to complete framing inspection. ok to insulate.
Issue PAID IN FULL permit  1/11/2006 DONE
Telephone call  1/9/2006 DONE
TLK TO NED ###-#### that permit and fees are ready to be picked up
Plan assigned to (SRZ)12/22/200512/22/20051/6/2006 PASS
1/6/2006 10:36:58 SRZ - activity updated through activity BLDA022 from case BLD05-03374.
Routing - PLAN CHECK12/12/2005 1/6/2006 PASS
Case Summary (BLD)  1/6/2006  
PLANS/APPL TAKEN TO FRONT DESK  1/6/2006 DONE
Inspection Record Card- Bld  1/6/2006 DONE
Permit Ready to Issue  1/6/2006 DONE
Plan Reviewer's activity  1/5/2006 PASS
I recieved requested items needed to complete Plan Review. (SRZ)
BLD-Footing1/3/20061/4/20061/4/2006APART
DetailsMike Jordan
wade ###-####. Early start.
BLD-Footing12/22/200512/27/200512/27/2005ACANC
DetailsMike Jordan
wade ###-####//cancelled per Wade w/Titan 12/27/05 8:21 am LEG
Plan assigned to (SAM)12/9/200512/9/200512/22/2005 DONE
Plan Reviewer's activity  12/22/2005 PEND
Plan review Pending:
1. Completed roof framing plan, or Truss layout from truss company.
2. Tall wall Engineering in Living room.
3. Covered porch beams called out

I spoke with Ned at Idaho Best construction. (SRZ)
Early Start Permit  12/16/2005 DONE
Telephone call  12/16/2005 DONE
Spoke with Ned told him that early start is ready this afternoon///12/16/2005 @9:30am BAS
Routing - PUBLIC WORKS12/12/2005 12/12/2005 PASS
Routing - PLANNING12/9/2005 12/12/2005 PASS
Application received  12/9/2005