Permit Information
Permit NumberBLD05-03413
StatusFinaled
Name VERTICAL CONSTRUCTION
Site Address 417 S 6TH ST
Project NameADA COUNTY JUSTICE CENTER
Customer Number 
ePlanReviewNo
Description
(ADA COUNTY JUSTICE CENTER) This building is fire sprinklered for area increase. To remodel the 1st story (18,080 square feet) and the basement (25,500 square feet) of an existing 50,900 square foot building for a new office and storage tenant. Except for new exterior windows, a new exterior door, and a fire sprinkler system, an existing 7,320 square foot tenant space located on the 1st story is NOT within the scope of work allowed under this permit. Work is to include interior nonbearing walls, several restrooms accessible to the disabled, suspended ceilings, new exterior windows and doors, new single ply roof membrane and insulation, millwork, and finishes. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes. The fire sprinkler system shall comply with NFPA 13 as regulated by the Fire Code. Site work including parking was done under permit BLD05-02914. Interior demolition was done under permit BLD05-03470. (DRH05-00230, CVA05-00019, and CUP05-00073) **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice BLD1/8/20071/8/200710/20/2015 DONE
DetailsCathy Chiles
This permit finaled on the web by Todd Weltner
MISC ACTIONS  5/22/2008 PASS
DetailsBob Archibald
Notice of Compliance recorded with ADA County, Instrument # 108059804. Copies also sent to architect and owner.
Agreement of Future work6/15/20066/15/20076/15/2007 DONE
DetailsSam Rogers
An upgrade agreement allowing a deferral of one year for sprinklering the North by Northwest tenant space in this structure was approved by Dave Hanneman, Deputy Fire Chief and George Slane, Building Official. This tenant space must be sprinklered by June 15, 2007.
Fee Review-notes12/16/200512/16/20051/26/2007 DONE
Second Notice BLD12/27/200612/27/20061/8/2007 DONE
First Notice has not been responded to.
First Notice 10/13/200612/27/2006 DONE
Permanent occupancy  10/13/2006 DONE
Perm. Occ. Cert. # 11249 issued 10-13-06 to the Ada County Justice Center.
BLD-Final10/11/200610/12/200610/12/2006APASS
DetailsDave Hannah
joe; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles ok for perm occ
BLD-Final10/10/200610/11/200610/12/2006ADEFR
DetailsDave Hannah
joe; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
Permanent Occupancy 10/12/200610/12/2006 DONE
Details
Code Occupancy Approval10/10/200610/10/200610/10/2006PPASS
DetailsWm. Michael Meloy
Compliance met.
MISC ACTIONS  8/2/2006 PART
DetailsBob Archibald
Notice of Non-Compliance recorded with ADA County, Instrument # 106123904
BLD-Final7/7/20067/7/20067/7/2006PPART
DetailsDave Hannah
JOE; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles ok for temp occ needs other trades to go perm needs to install fright elev needs to finish installing glass needs to fix ada rest rooms
FIRE-Final Inspection7/7/20067/7/20067/7/2006PPASS
DetailsForrest France
Fire life safety correction notice items have been completed, inspection passed.
FIRE-Final Inspection7/6/20067/7/20067/7/2006ACANC
DetailsForrest France
Joe; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt
BLD-Final7/5/20067/6/20067/6/2006PNR
DetailsDave Hannah
joe; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley still needs fire sign offs
FIRE-Final Inspection7/5/20067/6/20067/6/2006AFAIL
DetailsForrest France
Need to install exit signs per red line notes on approved plan set and as discussed on site, provide key box for FD use, provide sheetrock at the basement soffit where separation between fire sprinklers was designed, provide paint for flooring at the basement path of egress as indicated on approved plans, need to test emergency lighting at next inspection.
FIRE-Final Inspection6/30/20067/3/20067/3/2006ACANC
DetailsForrest France
not ready per raylene -joe; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley
BLD-Final6/30/20067/3/20067/3/2006PCANC
DetailsDave Hannah
not ready per raylene-joe; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley
BLD-Conference6/30/20066/30/20066/30/2006 FAIL
DetailsWm. Michael Meloy
Exterior Siding not on. OK to Bond for $4.000 for completion of of decorative siding.
BLD-Other6/15/20066/15/20066/15/2006PPART
DetailsDave Hannah
Joe, ceiling grid; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt ceiling grid rest of rooms ok to cover after elec and fire r/is are completed
BLD-Framing/Rough-in5/24/20065/24/20065/24/2006PPART
DetailsDave Hannah
Joe; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles ceiling grid center area ok to cover after elec r/i is approved
BLD-Framing/Rough-in5/9/20065/9/20065/9/2006PPASS
DetailsDave Hannah
joe Note: at loading dock; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles 6th street side and basement restrooms ok to cover
MISC ACTIONS  5/8/2006  
received request for code modification from Cole+Poe arch. Taken to George S.
BLD-Energy code compliance4/19/20064/19/20064/19/2006PPASS
DetailsDave Hannah
joe; Phone #: ###-#### Internet Inspection Request from: Rita DeYoung
BLD-Framing/Rough-in4/14/20064/17/20064/17/2006APASS
DetailsDave Hannah
Joe; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esongok to cover int walls
BLD-Energy code compliance4/11/20064/12/20064/12/2006APART
DetailsDave Hannah
Joe -- prefer late insp; call 1st before insp; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong west wall ok
BLD-Energy code compliance4/11/20064/11/20064/11/2006PPART
DetailsDave Hannah
Joe -- prefer late insp; call 1st before insp; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong ext walls south and east ok
BLD-Framing/Rough-in4/7/20064/10/20064/10/2006APART
DetailsDave Hannah
###-#### joe ext only wall framing not per plan need arch ok ok to insulate if ok with arch also needs to remover osb out of ext walls
BLD-Energy code compliance4/7/20064/10/20064/10/2006ANR
DetailsDave Hannah
###-#### joe
Plan Reviewer's activity  2/14/2006 DONE
Updated Fire Review notes scope of work to correspond with Plan Reviewers scope of work regarding the automatic sprinkler installation agreement requirements. Faxed udated review comments to Bruce Poe. -Scott Arellano - Fire Plan Review.
Routing - PLAN CHECK2/7/2006 2/10/2006 DONE
PLANS/APPL TAKEN TO FRONT DESK  2/10/2006 DONE
Print Occupancy Form  2/10/2006 DONE
Telephone call  2/10/2006 DONE
Fred Gray from Vertical construction was here, gave him copy of fees and needs ACHD
Permit Ready to Issue  2/10/2006 DONE
Issue PAID IN FULL permit  2/10/2006 DONE
Plan assigned to (CJW)12/20/2005 2/10/2006 PASS
2/10/2006 09:33:11 CJW - activity updated through activity BLDA022 from case BLD05-03413.
Routing - PLANNING2/6/2006 2/7/2006 PASS
Canopies added over windows. Approved.
Routing - FIRE2/6/2006 2/6/2006 PASS
Faxed review comments to architect. Attached comments to plans.
Routing - PLAN CHECK1/23/2006 2/6/2006 PASS
The drawings were approved after the resubmittal review.
Plan resubmittals received  1/23/2006 DONE
Received 1 letter of transmittal,1 fire code review response taken to Carl W.
Routing - FIRE1/14/2006 1/23/2006 FAIL
Requesting resubmittal clarifying controlled access egress doors.
1st review completed  1/23/2006 FAIL
Failed Plan check and Fire.
Plan resubmittals received  1/20/2006 DONE
Received 1 letter of transmittal ,1 plan review report2 plan review comments & 2 copys of sheets A2.0,A2.1,A2.3,A3.1,A3.2,A6.1,A6.2,A6.4,A8.1,A8.2 A8.3,A8.4,A8.5,A9.1,P0.0,P2.4,P2.6,M6.0 taken to Carl W.
Plan resubmittals received  1/17/2006 DONE
Received 1 transmittal letter,1 response,1 plumbing plan review taken to Carl W.
Routing - PLAN CHECK1/9/2006 1/14/2006 FAIL
The IBC plan review was started on January 7, 2006 and was finished on January 14, 2006. Revised drawings were required. See the plan review report.
Routing - PLUMBING1/4/2006 1/9/2006 PASS
pvb may be required at the eye wash at P-10
Routing - PLANNING12/22/2005 1/4/2006 PASS
Approved per DRH05-00230. Pending review by Susan Riggs for CUP05-00073 and CVA05-00019.
Routing - PUBLIC WORKS12/20/2005 12/22/2005 PASS
Plan resubmittals received  12/21/2005  
Received new certificate of value and 3 copies of plan sheets A1.11, A1.12, A1.13 and A1.14 and inserted into plans currently routing.
Pending Assignment by MYS12/16/2005 12/20/2005 DONE
12/20/2005 16:05:28 MYS - activity updated through activity BLDA172 from case BLD05-03413.
Plans ACCEPTED BY PLAN TECH  12/19/2005  
per Marlene, need to reprint and submit 3 copys of sheet A0.2
Plan resubmittals received  12/19/2005 DONE
A0.0, A0.1, A0.2, A1.11, A1.12, A1.13, A1.14, A1.15, A1.16, A2.0, A2.1, A2.2, A2.3, A2.4, A3.1, A3.2, A4.1, A5.1, A5.2, A5.3, A5.4, A6.1, A6.2, A6.4, A7.1, A7.2, A7.3, A7.4, A8.1, A8.2, A8.3, A8.4, A8.5 and A9.1. Resubmittals put in with the plans routing.
Application received  12/16/2005  
Recd Pcfee & Taken To Pln CK  12/16/2005