Third Notice BLD | 8/18/2006 | 8/18/2006 | 9/15/2006 | | DONE |
|
|
|
Second Notice has not been responded to.
|
Second Notice BLD | 7/7/2006 | 7/7/2006 | 8/18/2006 | | DONE |
|
|
|
First Notice has not been responded to.
|
First Notice | | 6/12/2006 | 7/7/2006 | | DONE |
|
|
|
|
Override - People Holds | | | 6/12/2006 | | |
|
|
|
|
BLD-Final | 6/2/2006 | 6/5/2006 | 6/5/2006 | P | PASS |
Dave Hannah
|
|
|
john; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley ok for perm occ
|
Code Occupancy Approval | 6/5/2006 | 6/5/2006 | 6/5/2006 | P | PASS |
Scott M.Brown
|
|
|
ALL IN AS REQUIRED FINAL SIGNED OFF
|
FIRE-Final Inspection | 6/2/2006 | 6/5/2006 | 6/5/2006 | A | PASS |
Troy Cobbley
|
|
|
Life safety finaled
|
Permanent Occupancy | | 6/5/2006 | 6/5/2006 | | DONE |
|
|
|
|
Permanent occupancy | | | 6/5/2006 | | DONE |
|
|
|
Perm. Occ. Cert. # 11061 issued 6-5-06 to Northwest Christian Credit Union.
|
Override - People Holds | | | 6/2/2006 | | |
|
|
|
|
BLD-Final | 5/4/2006 | 5/5/2006 | 5/5/2006 | P | NR |
Jim Sly
|
|
|
JOHN; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles Need Fire final prior to calling for structural final.
|
FIRE-Final Inspection | 5/3/2006 | 5/4/2006 | 5/4/2006 | A | FAIL |
Troy Cobbley
|
|
|
Provide fire hydrant per notes and drawing sheet A.1, repair exit sign and provide annual inspection tag for the fire extinguisher
|
BLD-Energy code compliance | 3/22/2006 | 3/22/2006 | 3/22/2006 | P | PASS |
Tom Arcoraci
|
|
|
John; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong
|
BLD-Framing/Rough-in | 3/20/2006 | 3/21/2006 | 3/21/2006 | P | PART |
Jim Storey
|
|
|
john ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie 18 inches clearance to pull side of office door. ok to insulate.
|
Print Occupancy Form | | | 3/6/2006 | | |
|
|
|
|
BLD-Concrete | 2/17/2006 | 2/17/2006 | 2/17/2006 | P | PASS |
Jim Storey
|
|
|
john ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie vapor barrior ok under slab on grade.
|
BLD-Foundation | 2/9/2006 | 2/10/2006 | 2/10/2006 | A | PART |
Mike Jordan
|
|
|
late am please//john; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
|
BLD-Footing | 2/8/2006 | 2/9/2006 | 2/9/2006 | A | PASS |
Jim Storey
|
|
|
John; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong
|
Telephone call | | | 1/25/2006 | | DONE |
|
|
|
called ###-#### and told mike that permit is ready and fees and need achd
|
Permit Ready to Issue | | | 1/25/2006 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 1/25/2006 | | DONE |
|
|
|
|
Plan assigned to (MLO) | 12/20/2005 | | 1/24/2006 | | PASS |
|
|
|
1/24/2006 12:24:30 MLO - activity updated through activity BLDA022 from case BLD05-03414.
|
Routing - Erosion and Sediment | 1/23/2006 | | 1/24/2006 | | PASS |
|
|
|
ESC plan approved with attached conditions.
|
Routing - PLANNING Land Div | 1/24/2006 | | 1/24/2006 | | PASS |
|
|
|
Approved.
|
Case Summary (BLD) | | | 1/24/2006 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/24/2006 | | DONE |
|
|
|
|
Print Occupancy Form | | | 1/24/2006 | | |
|
|
|
|
Routing - FIRE | 1/18/2006 | | 1/20/2006 | | PASS |
|
|
|
Approved per resubmitted plans showing new fire hydrant location and United Water fire flow information.
|
Plan resubmittals received | | | 1/17/2006 | | DONE |
|
|
|
Received 1 transmittal,1 united water, & 2 copys of sheet A1 taken to Mike O.
|
Routing - FIRE | 1/4/2006 | | 1/10/2006 | | FAIL |
|
|
|
faxed review to architect.
|
1st review completed | | | 1/10/2006 | | FAIL |
|
|
|
failed planning land div, ESC and fire.
|
Routing - PLAN CHECK | 1/10/2006 | | 1/10/2006 | | PEND |
|
|
|
|
Routing - PLAN CHECK | 12/28/2005 | | 1/4/2006 | | PASS |
|
|
|
|
Routing - PLANNING | 12/27/2005 | | 12/28/2005 | | PASS |
|
|
|
Carl Miller (CUP05-00138 Mod #1)
Cody Riddle (DRH05-00352)-Pass
|
Routing - PLUMBING | 12/21/2005 | | 12/27/2005 | | PASS |
|
|
|
per plans and 2003 upc
|
Routing - Erosion and Sediment | 12/21/2005 | | 12/21/2005 | | FAIL |
|
|
|
RP not included on esc application and contractor has been identified. Informed applicant.
|
Routing - PUBLIC WORKS | 12/20/2005 | | 12/21/2005 | | PASS |
|
|
|
|
Routing - PLANNING Land Div | 12/20/2005 | | 12/20/2005 | | FAIL |
|
|
|
This is a condominium and the applicant must provide documentation on the mechanism for altering the percentage of common open space within the condominium declarations. Called Brad Swartzentruber at ###-#### and left voice message.
|
Plans ACCEPTED BY PLAN TECH | | | 12/19/2005 | | |
|
|
|
|
Application received | | | 12/16/2005 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 12/16/2005 | | |
|
|
|
|
Fee Review-notes | 12/16/2005 | 12/16/2005 | | | |
|
|
|
|