Third Notice BLD | 6/6/2008 | 6/6/2008 | 9/29/2008 | | DONE |
Cathy Brown
|
|
|
Second Notice has not been responded to.
|
Second Notice BLD | 4/23/2008 | 4/23/2008 | 6/6/2008 | | DONE |
Cathy Brown
|
|
|
First Notice has not been responded to.
|
First Notice | | 3/5/2008 | 4/23/2008 | | DONE |
|
|
|
|
BLD-Final | 3/5/2008 | 3/5/2008 | 3/5/2008 | P | PASS |
Jim Sly
|
|
|
jack Phone #: ###-#### Lock removed from Vestible door........OK for Perm Occ. :)
|
Permanent Occupancy | | | 3/5/2008 | | DONE |
|
|
|
|
FIRE-Final Inspection | 3/3/2008 | 3/4/2008 | 3/4/2008 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed. Structural inspector to verify that the deadbolt lock is removed from the common restroom door as per the approved drawings.
|
FIRE-Final Inspection | 2/26/2008 | 2/27/2008 | 2/27/2008 | A | FAIL |
Troy Cobbley
|
|
|
Plan review comments are now on site but the approved plans are not. The address the tenant is occupying is different than what is listed on the permit. The dead bolt locks need removed from the two offices and the fire extinguisher inspected.
|
FIRE-Final Inspection | 2/25/2008 | 2/25/2008 | 2/25/2008 | P | FAIL |
Troy Cobbley
|
|
|
There were no approved plans or notes on site. No inspection performed.
|
BLD-Aging Inspection | 2/22/2008 | 2/22/2008 | 2/25/2008 | | PEND |
Jim Sly
|
|
|
See previous comments......and Called Joe Ramseys #........with no avail......someone else took over this #
|
BLD-Conference | 2/25/2008 | 2/25/2008 | 2/25/2008 | A | DONE |
Jim Sly
|
|
|
Talked to Jack....###-####.....Need Fire....then Bldg finals.
|
BLD-Final | 3/31/2006 | 3/31/2006 | 3/31/2006 | P | NR |
Mike Jordan
|
|
|
trevor ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie. Life safety not passed. All life safety issues were repaired, Troy C was notified by me.
|
FIRE-Final Inspection | 3/30/2006 | 3/31/2006 | 3/31/2006 | A | FAIL |
Troy Cobbley
|
|
|
Provide approved door hardware on the office doors.
|
BLD-Final | 3/29/2006 | 3/30/2006 | 3/30/2006 | P | NR |
Jim Sly
|
|
|
Joe -- fire life safety 3-30 AM and BLD final 3-30 PM (pending fire life safety); call 1st before insp for access; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong
|
FIRE-Final Inspection | 3/29/2006 | 3/30/2006 | 3/30/2006 | A | FAIL |
Troy Cobbley
|
|
|
Provide fire extinguisher as per note #6, Provide approved hardware on the restroom doors(remove deadbolts), provide approved hardware on the west exterior door, provide approved hardware on the mechanical room door and fix the exit sign over the east exit.
|
Inspection Record Card- Bld | | | 3/27/2006 | | |
|
|
|
|
Print Occupancy Form | | | 3/27/2006 | | DONE |
|
|
|
|
BLD-Energy code compliance | 2/6/2006 | 2/6/2006 | 2/6/2006 | P | PASS |
Mike Jordan
|
|
|
Joe -- call 1st before insp; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong
|
BLD-Framing/Rough-in | 1/30/2006 | 1/31/2006 | 1/31/2006 | A | PASS |
Jim Sly
|
|
|
please call before going out//Gel Ramsey; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
|
Issue PAID IN FULL permit | | | 1/20/2006 | | DONE |
|
|
|
|
Telephone call | | | 1/19/2006 | | DONE |
|
|
|
David ###-####
|
Permit Ready to Issue | | | 1/19/2006 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 1/17/2006 | | 1/18/2006 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/18/2006 | | DONE |
|
|
|
|
Print Occupancy Form | | | 1/18/2006 | | DONE |
|
|
|
|
Plan assigned to (R_H) | 12/21/2005 | | 1/18/2006 | | PASS |
|
|
|
1/18/2006 13:49:46 RMH - activity updated through activity BLDA022 from case BLD05-03423.
|
Routing - FIRE | 1/16/2006 | | 1/17/2006 | | PASS |
|
|
|
Resubmittal acceptable
|
Plan resubmittals received | | | 1/16/2006 | | |
|
|
|
Routed to Fire
|
1st review completed | | | 1/12/2006 | | FAIL |
|
|
|
Failed Plan Check, Fire Review
|
Routing - PLAN CHECK | 1/12/2006 | | 1/12/2006 | | |
|
|
|
|
Routing - FIRE | 1/9/2006 | | 1/12/2006 | | FAIL |
|
|
|
See attached comments regarding shared common restroom.
|
Plan resubmittals received | | | 1/10/2006 | | DONE |
|
|
|
Received 1 review report, & 2 copys of sheets A2.1,A7.1 taken to Ron H.
|
Routing - PLAN CHECK | 12/22/2005 | | 1/9/2006 | | FAIL |
|
|
|
Faxed requirements to the architect on 1/9/06, routed plans to the fire department same day...
|
Case Summary (BLD) | | | 1/9/2006 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 1/9/2006 | | |
|
|
|
|
Routing - PUBLIC WORKS | 12/21/2005 | | 12/22/2005 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 12/21/2005 | | DONE |
|
|
|
|
Application received | | | 12/19/2005 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 12/19/2005 | | DONE |
|
|
|
|
Fee Review-notes | 12/19/2005 | 12/19/2005 | | | |
|
|
|
|