SOUTHSHORE SHOPPING CENTER-ADDITION - To construct a new 1,170 square foot, one story, framed shell addition at the southwest corner of an existing shopping center building. This shell building is for a future coffee shop. The coffee shop will have a drive thru window per CUP05-00077 (No Design Review required). This permit also includes related site improvements. This is a shell permit only and no occupancy is allowewd under this permit. A separate tenant improvement permit will be required to finish this building for occupancy. finish will require a separate permit. Note: This shopping center originally constructed as an unlimited area building with 60 foot yards around the entire structure as delineated on the subdivision plat and fully fire sprinklered. Because of the requirements for an unlimited area building and the proposed exiting, the future tenant space will be limited to a maximum occupant load of 49. All construction per the approved plans and attached comment list. JCM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Letter of compliance  12/1/2006 DONE
Letter of Compliance issued 12-1-06
BLD-Final11/27/200611/28/200611/28/2006PPART
DetailsJim Storey
jay; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles ok for temp pending plm,
BLD-Final11/20/200611/22/200611/22/2006PNR
DetailsJim Storey
PLease call at least 1/2 hr prior to inspection///jay; Phone #: ###-#### Internet Inspection Request from: Barbara Stitt
FIRE-Final Inspection11/20/200611/21/200611/21/2006APASS
DetailsForrest France
Shell fire life safety is acceptable.
BLD-Aging Inspection10/11/200610/11/200610/11/2006 PASS
DetailsJim Storey
wip
BLD-Aging Inspection8/10/20068/10/20068/10/2006 PASS
DetailsJim Storey
wip
BLD-Framing/Rough-in5/15/20065/16/20065/16/2006APASS
DetailsJim Storey
scott; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles sheer exterior ok
BLD-Footing3/30/20063/31/20063/31/2006APASS
DetailsJim Sly
Scheduled by a contractor via Hello! on 3/30/2006 at 10:37:07 AM. Contact: ###-####.
Found wall OK
BLD-Footing3/24/20063/27/20063/27/2006PPASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 3/24/2006 at 11:53:16 AM.
Issue PAID IN FULL permit  3/22/2006 DONE
Inspection Record Card- Bld  2/21/2006  
Telephone call  2/21/2006 DONE
called ###-#### and left voicemessage for Jay that permit is ready, fees, and need ACHD
Permit Ready to Issue  2/21/2006 DONE
Routing - FIRE2/16/2006 2/17/2006 PASS
Attached review comments to plans. Faxed review comments to architect.
Routing - PLAN CHECK2/17/2006 2/17/2006 PASS
PLANS/APPL TAKEN TO FRONT DESK  2/17/2006 DONE
Plan assigned to (JCM)12/22/2005 2/17/2006 PASS
2/17/2006 16:14:28 JCM - activity updated through activity BLDA022 from case BLD05-03434.
Routing - PLAN CHECK1/20/2006 2/16/2006  
Plan resubmittals received  2/15/2006 DONE
Received 1 transmittal letter, 1 memo,1 United Water sheet & 2 copys of sheet SD-2 taken to John M.
Routing - FIRE1/17/2006 1/20/2006 FAIL
Faxed comments to architect. See attached comments.FIre Flow, Fire Sprinkler.
1st review completed  1/20/2006 FAIL
Failed Fire
Routing - PLAN CHECK1/17/2006 1/17/2006 PASS
Routing - PLANNING1/6/2006 1/17/2006 PASS
Carl Miller
Sarah Schafer The design review application for this project was voided due to the fact that the project isn't actually in a D overlay. I have passed the plans on to Carl Miller. 1/11/06
Plan Reviewer's activity  1/9/2006 PASS
Plans reviewed and approved as submitted for structural and nonstructural code requirements. JCM
Routing - PLUMBING1/4/2005 1/6/2006 PASS
Shell only per plans and 2003 UPC water shown on civil but not on M-2
Routing - Erosion and Sediment1/3/2006 1/4/2006 PASS
ESC plan approved with attached conditions.
Routing - PUBLIC WORKS12/30/2005 1/3/2006 PASS
Routing - PLANNING Land Div12/29/2005 12/30/2005 PASS
Lot 8, Block 5 of the Southshore Shopping Center Subdivision.
Plans ACCEPTED BY PLAN TECH  12/29/2005 PASS
Plans stamped and signed by architect. Ready to begin routing.
Plans ACCEPTED BY PLAN TECH  12/22/2005 FAIL
None of the architectural sheets are stamped and signed by the architect. Contacted Andrew Davis at BRS and he is to send revised plans to us before we start routing. Plans on hold at plan review front counter.
Pending Assignment by MYS12/20/2005 12/22/2005 DONE
12/22/2005 07:58:25 JCM - activity updated through activity BLDA166 from case BLD05-03434.
Recd Pcfee & Taken To Pln CK  12/20/2005  
Application received  12/20/2005  
Fee Review-notes12/20/200512/20/2005