Permit NumberBLD05-03448
StatusFinaled
Name WENSEL CONSTRUCTION
Site Address 1111 W JEFFERSON ST
Project NameBoise Cascade Bldg.
Customer Number 
ePlanReviewNo
Description
(BOISE - BASEMENT - CODE UPGRADE) Interior remodel in the 77,950 sq. ft. basement to comply with a 9/28/00 Upgrade Agreement on file (modified under this permit) in an existing 322,795 sq. ft. high-rise building per approved plans. Work to include installing quick-response sprinkler heads where required throughout the basement floor, some miscellaneous interior demolition work, providing a new mechanically ventilated vestibule with 2-hour rated wall and 20 minute rated door within the existing northeast smokeproof enclosure stair, some new interior walls, some new interior doors, interior finish work, upgrading some restrooms to comply with current accessibility standards, constructing two new accessible restroom/shower rooms, some new noncombustible accessible ramps with handrails, a new noncombustible interior stairway with two risers and handrails, fire sprinkler work, fire alarm work, mechanical work, plumbing work, and electrical work. Work will also include installing new doors in the atrium on levels 1, 2, 3, and 5, floors that are above the main/ground floor. Final approval of the atrium doors will be deferred until approval of the doors by the design engineer of the atrium when atrium upgrades occur under a future separate permit. Additional testing of the doors may need to occur at that time. A Certificate of Occupancy for the basement is to be issued when completed and approved. NOTE: The basement is fully fire sprinklered. The entire building will be fully fire sprinklered by March of 2011 per another Upgrade Agreement on file. JCB
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Agreement of Future work4/20/20063/1/201112/9/2008 DONE
DetailsJason Blais
A new 4/17/06 Upgrade Agreement has been signed and recorded by the new owner (Rafanelli & Nahas) to replace the 12/15/05 Upgrade Agreement with the former owner. (Boise Cascade) Upgrade work is to be completed by March of 2011. See the Upgrade Agreement to review all work to be completed, but it basically includes fully fire sprinklering the entire building, an updated/compliant fire alarm system, modernizing the northeast smokeproof stair enclosure tower, pressurizing the other stair enclosures, providing compliant sprinklers/spacing around the atrium, upgrading the smoke evacuation system for the atrium, verifying or providing automatic fire detection/smoke detection where required, removing asbestos fire spray and providing new sprayed fire-resistant materials, upgrading fire pump, upgrading at least one Men's and one Women's restroom on each floor in compliance with accessibility standards, constructing a new Fire Command Center, verifying or providing emergency and standby power systems where required, providing a 2-hour rated room around emergency generators in basement, doors/door hardware upgrades, 90 minute rated doors on hold-open at freight elevator openings, handrails at exterior ramps, additional exit signs and emergency lighting where required, elevator accessibility upgrades, and verification of or providing elevator emergency operations capability.
12/8/08 Notice of Compliance recorded at Ada County. All permits finaled and work completed on Upgrade Agreement.
Second Notice BLD11/13/200711/13/200712/11/2007 DONE
First Notice has not been responded to.
Fee Review-notes12/22/200512/22/200512/11/2007 DONE
First Notice 11/2/200711/13/2007 DONE
Permanent Occupancy  11/2/2007 DONE
BLD-Conference11/1/200711/1/200711/1/2007PPASS
DetailsTony Young
Steve; Phone #: ###-####
permit is ok for full c of o
BLD-Final10/18/200710/18/200710/18/2007PPASS
DetailsTony Young
steve Phone #: ###-####
ok for perm occ. on this section of building
FIRE-Final Inspection10/8/200710/9/200710/9/2007APASS
DetailsForrest France
Fire life safety finaled.
BLD-Final10/5/200710/8/200710/8/2007APART
DetailsTony Young
kirt Phone #: ###-####
ok pending others
BLD-Final8/31/20069/5/20069/5/2006APART
DetailsDave Hannah
steve; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley ok to use ada rest rooms
FIRE-Final Inspection8/31/20069/1/20069/1/2006APART
DetailsForrest France
Inspection for the remodeled restrooms and one adjacent confrence room is satisfactory, final pending project related fire sprinkler permit final.
BLD-Framing/Rough-in7/26/20067/26/20067/26/2006PPART
DetailsDave Hannah
Curt ###-#### rest room wall in basement ok to cover
BLD-Framing/Rough-in7/25/20067/26/20067/26/2006ACANC
DetailsTony Young
curt; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley
out of time,, rescheduled for pm
BLD-Framing/Rough-in7/10/20067/10/20067/10/2006PPART
DetailsDave Hannah
curt; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley ok to cover basement shower rooms
FIRE-Conference5/22/20065/25/20065/26/2006PPART
DetailsForrest France
Inspection to verify completion of previous correction notice items, also tested access controlled atrium doors on floors 1-5 for functionality, tested emergency lighting and exit signage on backup power for the basement only, verified mag lock dropout upon fire alarm at access controlled doors, tested door release at basement elevator lobby. The project related fire sprinkler permit must be finaled prior to final approval for the basement code upgrade permit.
FIRE-Conference5/12/20065/19/20065/19/2006PCANC
DetailsTroy Cobbley
Per the contractor this conference had been canceled earlier.
Plan resubmittals received  5/12/2006 DONE
Received 1 letter, & 2 copys of sheet A0.1 taken to Jason B. Permit issued 4-19-06
BLD-Conference5/8/20065/9/20065/9/2006ADONE
DetailsDave Hannah
curt; Phone #: ###-#### Internet Inspection Request from: Rita DeYoung
FIRE-Conference5/4/20065/5/20065/5/2006APART
DetailsForrest France
Some items on correction notice have been completed including door hardware, fire ext., occupant load sign, fire sprinkler. Need to provide directional arrow at the exit sign adjacent to the SW exit stairs, remove clasp for surface lock at the pantry, provide occupant load sign in the meeting room. Still need to verify emergency lighting and exit sign illumination for the path of egress, and door lock dropout upon fire alarm activation.
FIRE-Conference5/3/20065/4/20065/4/2006ANR
DetailsForrest France
Field inspection to be scheduled for 5/5 in the AM as agreed.
BLD-Conference5/3/20065/3/20065/3/2006PPART
DetailsDave Hannah
kirt; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles walked basement found several doors that need tobe up graded to 90 min also need to talk to jason about 2hr walls
BLD-Final4/24/20064/26/20064/26/2006AFAIL
DetailsTony Young
Gary ; Phone #: ###-#### Internet Inspection Request from: Rita DeYoung
need trades 1st,, no inspection made
FIRE-Final Inspection4/24/20064/25/20064/26/2006PFAIL
DetailsForrest France
Several issues need addressed as discussed on site regarding life safety inspection for the basement only including door hardware (knobs at stairway exits, manual flush bolts on inactive leafs, padlocks on cooler and storage rooms, missing closures and seals at rated room doors, etc.), exit signs at some areas are not illuminated or need relocation, fire extinguishers shall be mounted no higher than 48" AFF, some locations may be overspaced to the nearest FE (75' max travel), provide max occupant load sign for the meeting room, need to test emergency lighting for the path of egress, access controlled egress doors shall be tested for loss of power and alarm at the mag locks, provide smoke detection for the battery room (a HD appears to be installed), one 200 deg. QR head needs replaced as noted, per the upgrade agreement some required alarm and sprinkler issues related to the basement are not completed at this time. Not all items reviewed at this inspection, contractor to re-schedule when general noted issues have been corrected.
PLANS/APPL TAKEN TO FRONT DESK  4/20/2006 PASS
Plan assigned to (JCB)12/28/2005 4/20/2006 PASS
4/20/2006 08:28:31 JCB - activity updated through activity BLDA022 from case BLD05-03448.
Print Occupancy Form  4/20/2006 DONE
Permit Ready to Issue  4/20/2006  
Telephone call  4/20/2006 DONE
left mess for carleen gage at ###-#### that permit is ready
Issue PAID IN FULL permit  4/20/2006 DONE
Routing - PLAN CHECK3/27/2006 4/20/2006 PASS
Plan resubmittals received  4/19/2006 DONE
Received two copies of recorded and signed Upgrade Agreement.
Routing - FIRE3/23/2006 3/27/2006 PASS
Attached review comments to plans. Faxed review comments to architect.
Routing - PLAN CHECK3/22/2006 3/23/2006 PEND
Permit approval pending approval by the Fire Department and a signed upgrade agreement with new building owner. Plans to route to the Fire Deparment.
Plan resubmittals received  3/23/2006 DONE
Plan resubmittal sheets A2.1, A2.2, and an alternate approval request letter for the Fire Marshal and Building Official received.
Routing - FIRE3/14/2006 3/22/2006 FAIL
Attached review comments to plans. Faxed updated review comments to architect.
Meeting  3/16/2006 DONE
Met with new owner, contractor, and facilities manager to go over issues/work to be completed in the basement. Also notified them the permit cannot be issued until the new upgrade agreement is signed per management/city attorney.
Routing - PUBLIC WORKS3/14/2006 3/14/2006 PASS
Routing - PLAN CHECK3/8/2006 3/14/2006 PEND
Permit approval pending on signing and approval of new Upgrade Agreement with new building owner, Public Works approval again, and Fire Department approval again. Plans to route to Public Works and then to the Fire Department.
Plan resubmittals received  3/13/2006  
Recieved 1 cover transmittal letter, 1copy of letter, 1 copy of cert of revised cert of value scanned and attached to documents and added to comments then taken to Jason B.
Plan resubmittals received  3/10/2006  
Received 1 copy of cover transmittal letter, 1 copy of cert of value, 2 copies of the following- 0.0, A0.1, A0.2, A0.3, A1.0, A1.1, A2.0, A2.0A, A2.0B, A2.0C, A2.0D, A2.1, A2.2, A2.3, A2.4 and taken to Jason B.
Telephone call  3/8/2006 DONE
Phone calls with representatives from Boise and with architect representative concerning a few issues still needing to be addressed. A new change has now also been requested concerning new accessible restroom/shower rooms to be constructed adjacent to existing. New plans will be provided with changes.
Routing - PLAN CHECK2/15/2006 3/8/2006 FAIL
Phone calls with representatives from Boise and with architect representative concerning a few issues still needing to be addressed. A new change has now also been requested concerning new accessible restroom/shower rooms to be constructed adjacent to existing. New plans will be provided with changes.
Plan resubmittals received  3/7/2006  
Received 1 transmittal letter, 1 cover letter, 3 copies of the following- 0.0, A.01, A0.2, A0.3, A1.0, A1.1, A2.0, A2.0A, A2.0B, A2.0C, A2.0D, A2.1, A2.2, A2.3 and taken to Jason B.
Meeting  2/17/2006 DONE
Met with Garry Swanson and Sam Burrows to discuss some issues needing to be addressed. New resubmittal plans will be forthcoming.
Telephone call  2/15/2006 DONE
Called architect Sam Burrows to set up a meeting to go over several issues. The resubmittal plans provided cannot be approved as submitted. After the meeting, new resubmittal plans will then need to be submitted for review.
Telephone call  2/15/2006 DONE
Called Carlene Gage of Boise to let her know that the resubmittal plans as submitted cannot be approved. I will be meeting with the architect on Friday to go over issues. New resubmittal plans will need to be provided for review.
Routing - PLAN CHECK1/23/2006 2/15/2006 FAIL
Several issues still need to be addressed. Set up a meeting with the architect to go over issues. New resubmittal plans will need to be provided.
Telephone call  2/14/2006 DONE
Talked with Garry Swanson of Boise to clarify a few of the rated rooms and rated doors in the basement that are not totally clear on the resubmittal plans. Also clarified with him that the new atrium doors will be smoke and draft control doors per code.
Plan resubmittals received  2/7/2006 DONE
Received 1 letter/review comments, 6 copys of sheets A0.2,& 3 copys of sheets 0.0,A0.1,A1.0,A1.1,A2.0,A2.0A,A2.0B,A2.0C,A2.0D,A2.1,A2.2,A2.3 taken to Jason B.
Routing - FIRE1/20/2006 1/23/2006 PASS
See attached comments.
1st review completed  1/23/2006 FAIL
Failed Plan Check.
Routing - PLAN CHECK12/28/2005 1/20/2006 FAIL
Plan review report e-mailed and faxed to architect. Plan resubmittals and written response required for further review. Plans to route to the Fire Department for review.
Plan resubmittals requested  1/20/2006 DONE
Plan resubmittals and written response required for further review.
Plans ACCEPTED BY PLAN TECH  12/28/2005 DONE
Routing - PUBLIC WORKS12/28/2005 12/28/2005 PASS
Application received  12/22/2005  
Recd Pcfee & Taken To Pln CK  12/22/2005