Information based on query as of Saturday, August 17, 2024.
Permit Information
Permit NumberBLD05-03467
StatusFinaled
Name BARCLAY CONSTRUCTION
Site Address 512 N AVENUE I AVE
Project Name 
Customer Number 
ePlanReviewNo
Description
To demolish a 900sq.ft. existing dwelling and construct a New 2888sq.ft. Two story single family dwelling (1478sq.ft. Lower floor / 1410sq.ft. Upper floor) with a 152sq.ft. Covered front porch, and a 611sq.ft. Attached garage per approved plans, all red-lining, and Plan review report. THE PERMIT HOLDER is responsible to comply with current wall bracing requirements adopted by Boise city. R-2 zoning/setbacks as per T.C. with Planning and Zoning. (SRZ)
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final10/25/200610/25/200610/26/2006PPASS
DetailsDave Hannah
Please call Rob ###-#### for access; Phone #: ###-#### Internet Inspection Request from: JANET TATILIAN
DOC - Permit Finaled10/26/200610/26/200610/26/2006PPASS
DetailsDave Hannah
DOC - Permit Finaled10/25/200610/25/200610/25/2006PPASS
DetailsDave Hannah
BLD-Final10/23/200610/24/200610/24/2006PFAIL
DetailsDave Hannah
Please call ###-#### or ###-#### for garage access code.; Phone #: ###-#### Internet Inspection Request from: JANET TATILIAN needs adress fix first riser on stairs and fix stairs into garage
BLD-Framing/Rough-in5/8/20065/9/20065/9/2006APASS
DetailsDave Hannah
Phone #: ###-#### Internet Inspection Request from: JANET TATILIAN
BLD-Energy code compliance5/5/20065/8/20065/8/2006APASS
DetailsDave Hannah
Please schedule w/framing reinspection; Phone #: ###-#### Internet Inspection Request from: JANET TATILIAN ok to cover
BLD-Framing/Rough-in5/2/20065/3/20065/3/2006PFAIL
DetailsDave Hannah
Phone #: ###-#### Internet Inspection Request from: JANET TATILIAN c/n on site ok to insulate
BLD-Footing2/9/20062/9/20062/9/2006PPART
DetailsTony Young
Santos -- would like insp at 2:30 pm -- call 1st before insp; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong
footing is w i p,, BUT the owner may change her mind on design or ???,, may hold off on pour,,, ok to pour today if no changes occur
BLD-Other2/3/20062/3/20062/3/2006PPASS
DetailsDave Hannah
Foundation prep in progress ok for demo bond release.
BLD-Other1/25/20061/25/20061/25/2006APART
DetailsDave Hannah
Demolition complete, ok for bond release when footing/foundation work begins.
Permit Ready to Issue  1/13/2006 DONE
Inspection Record Card- Bld  1/13/2006 DONE
Telephone call  1/13/2006 DONE
Spoke with Janey and told her that permit is ready & fees///1/13/06 @12:30pm BAS
Issue PAID IN FULL permit  1/13/2006 DONE
Plan assigned to (SRZ)1/11/20061/11/20061/12/2006 PASS
1/12/2006 09:18:29 SRZ - activity updated through activity BLDA022 from case BLD05-03467.
PLANS/APPL TAKEN TO FRONT DESK  1/12/2006 DONE
Routing - PLAN CHECK1/3/2006 1/12/2006 PASS
Plan assigned to (SAM)12/23/2005 1/11/2006 DONE
Telephone call  1/11/2006 DONE
Applicant agreed to include Demo into Building permit. (SRZ)
Case Summary (BLD)  1/11/2006  
MISC ACTIONS  1/6/2006 PART
DetailsBob Archibald
Spoke with Janet from Barclay Construction Boise City will issue a seperate demoltion permit for this project, $3000.00 bond and insurrance required.
Routing - PUBLIC WORKS12/30/2005 1/3/2006 PASS
Routing - PLANNING12/23/2005 12/30/2005 PASS
DetailsTom Curren
Routing - PLANNING Land Div12/30/2005 12/30/2005 PASS
Parcel created by Warranty Deed dated April 4, 1949.
Routing - PLANNING Land Div12/29/2005 12/29/2005 FAIL
Need verification of legal land division. Called Robert Talitian on December 29, 2005 and asked for copy of warranty deed that is dated before October 30, 1965.
Application received  12/23/2005