Case Summary (BLD) | | | 8/3/2011 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 3/25/2008 | | DONE |
|
|
|
|
BLD-Final | 12/11/2006 | 12/11/2006 | 12/11/2006 | P | PASS |
Tom Arcoraci
|
|
|
derrick - shell and core; Phone #: ###-#### Internet Inspection Request from: Patricia Smith lc issued
|
Code Occupancy Approval Temp | 12/11/2006 | 12/11/2006 | 12/11/2006 | P | DONE |
Dena Gambrel
|
|
|
12-11-06 TEMPORARY SIGN OFF. They still need Wooly Thyme planted around the buildings bedding areas, 8 golden privets planted around the trash enclosure, 3 fountain grass in the north bedding area, finish work on the above ground handicap signs that are already in progress of being installed.
|
PubWorks Occupancy Approval | 12/7/2006 | 12/7/2006 | 12/7/2006 | | DONE |
|
|
|
Signed permanent occupancy 12/06/06 S. Landaluce.
|
FIRE-Final Inspection | 12/4/2006 | 12/5/2006 | 12/5/2006 | A | PASS |
Troy Cobbley
|
|
|
Life safety for the shell is finaled
|
BLD-Final | 12/4/2006 | 12/5/2006 | 12/5/2006 | P | NR |
Tom Arcoraci
|
|
|
derick; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
BLD-Other | 11/17/2006 | 11/17/2006 | 11/17/2006 | P | FAIL |
Tom Arcoraci
|
|
|
derick Note: ceiling grid inspection; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
BLD-Aging Inspection | 10/17/2006 | 10/17/2006 | 10/17/2006 | | PASS |
Tom Arcoraci
|
|
|
|
Case Summary (BLD) | | | 10/5/2006 | | |
|
|
|
|
BLD-Aging Inspection | 8/17/2006 | 8/17/2006 | 8/17/2006 | | PASS |
Tom Arcoraci
|
|
|
|
BLD-Framing/Rough-in | 6/15/2006 | 6/16/2006 | 6/16/2006 | A | PART |
Mike Jordan
|
|
|
derek; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley. shear nialing insp. on perimeter walls. Need RFI from engineer on fix for straps placed at TS columns that can not be nailed in.
|
BLD-Other | 5/30/2006 | 5/30/2006 | 5/30/2006 | P | PASS |
Tony Young
|
|
|
Derek, roof nailing; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt ok to cover
|
BLD-Footing | 4/24/2006 | 4/25/2006 | 4/25/2006 | A | PASS |
Mike Jordan
|
|
|
derrick; Phone #: ###-#### Internet Inspection Request from: Rita DeYoung
|
BLD-Foundation | 4/13/2006 | 4/13/2006 | 4/13/2006 | P | PASS |
Tom Arcoraci
|
|
|
###-#### - derrick
|
BLD-Footing | 4/10/2006 | 4/11/2006 | 4/11/2006 | A | PASS |
Tom Arcoraci
|
|
|
derick; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
BLD-Footing | 3/28/2006 | 3/29/2006 | 3/29/2006 | A | PASS |
Tom Arcoraci
|
|
|
late am please//derek; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
|
(F) Reprint permit | | | 3/15/2006 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 3/14/2006 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 1/26/2006 | | 2/2/2006 | | |
|
|
|
John M.
|
Routing - PLANNING Land Div | 2/2/2006 | | 2/2/2006 | | PASS |
|
|
|
Documents provided showing an amendment to the easement which is now wide enough to encompass the driveway.
|
Routing - PLAN CHECK | 2/2/2006 | | 2/2/2006 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/2/2006 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 2/2/2006 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 2/2/2006 | | |
|
|
|
|
Telephone call | | | 2/2/2006 | | DONE |
|
|
|
tlk to jerod wallgren ###-#### that permit and fees are ready to picked up but needs GC, ADHD, and RP 2:27 pm
|
Plan assigned to (JCM) | 1/13/2006 | | 2/2/2006 | | PASS |
|
|
|
2/2/2006 09:52:54 JCM - activity updated through activity BLDA022 from case BLD05-03493.
|
Plan Reviewer's activity | | | 1/27/2006 | | PASS |
|
|
|
Reviewed and approved structural resubmittals. JCM
|
Routing - Erosion and Sediment | 1/26/2006 | | 1/26/2006 | | PASS |
|
|
|
ESC plan approved with attached conditions.
|
Routing - PLANNING | 1/26/2006 | | 1/26/2006 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 1/19/2006 | | 1/26/2006 | | |
|
|
|
|
Plan resubmittals received | | | 1/25/2006 | | DONE |
|
|
|
Received 1 transmittal letter,3 structural calcs, 2 copys of sheet L-1.0 & 3 copys of sheets A-2.0 A-2.2,A-4.1 taken to John M.
|
Plan resubmittals requested | | | 1/19/2006 | | DONE |
|
|
|
E-mailed the architect a copy of the comment list from the consulting structural engineer requesting revisions. JCM
|
Routing Off Site - STRUCTURAL | 1/3/2006 | | 1/19/2006 | | FAIL |
|
|
|
Called PDQ for pick up - Received an e-mailed comment list from the consulting structural engineer requesting revisions. JCM
|
1st review completed | | | 1/19/2006 | | FAIL |
|
|
|
Failed Planning, ESC.
|
Routing - FIRE | 1/13/2006 | | 1/19/2006 | | PASS |
|
|
|
See attached comments.
|
Plan Reviewer's activity | | | 1/13/2006 | | PASS |
|
|
|
Plans reviewed and appoved as submitted. JCM
|
Routing - PLAN CHECK | 1/13/2006 | | 1/13/2006 | | PASS |
|
|
|
John M.
|
Routing - PLANNING | 1/11/2006 | | 1/13/2006 | | FAIL |
|
|
|
Cody Riddle (DRH05-00348)
Plans do not comply with conditions of approval (1-f, i, j)
|
Routing - Erosion and Sediment | 1/5/2006 | | 1/6/2006 | | FAIL |
|
|
|
ESC plan does not meet requirments per BMC 8-17; Checklist completed and faxed to PD.
|
Routing - PLUMBING | 1/6/2005 | | 1/6/2006 | | PASS |
|
|
|
approved per plan and 2003 upc
|
Routing - PUBLIC WORKS | 1/4/2006 | | 1/5/2006 | | PASS |
|
|
|
|
Routing - PLANNING Land Div | 1/3/2006 | | 1/4/2006 | | FAIL |
|
|
|
Existing access drive is not located within the platted 30' wide common access & ingress/egress easement between lots 1 and 2. Prior to Land Division approval a new easement in the locatation of the existing access drive must be recorded. Applicant was notified on 1/4/06 and is working on it.
Todd
|
Plans ACCEPTED BY PLAN TECH | | | 1/3/2006 | | |
|
|
|
|
Plan routing begun/NEW & ADDTN | | | 1/3/2006 | | |
|
|
|
|
Application received | | | 12/29/2005 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 12/29/2005 | | |
|
|
|
|
Fee Review-notes | 12/29/2005 | 12/29/2005 | | | |
|
|
|
|