Information based on query as of Saturday, August 17, 2024.
Permit Information
Permit NumberBLD05-03506
StatusFinaled
Name THE BODY SHOP
Site Address 350 N MILWAUKEE ST Unit: 2087
Project NameBTS - #2087
Customer Number 
ePlanReviewNo
Description
ARLINGTON CONSTRUCTION REGISTRATION #RCE-3783 (THE BODY SHOP)(BOISE TOWNE SQUARE-SPACE 2087) To remodel an existing 900 sq.ft. retail tenant space for a new tenant per approved plans. Work to include, removal of existing nonbearing partitions and finishes, construction of a new storefront system with new roll down security grill, installation of suspended ceiling system, installation of new HVAC system, construction of a new accessible restroom, miscellaneous related finishes. This building is fully firesprinklered and contains a smoke evacuation system, any alterations to the sprinkler system shall be per NFPA #13 as regulated by the fire department. The smoke evacuation system shall remain operational as originally installed under the 1985 UBC. RMH
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice BLD3/29/20063/29/20063/30/2006 DONE
Second Notice has not been responded to.
Second Notice BLD3/15/20063/15/20063/29/2006 DONE
First Notice has not been responded to.
First Notice 2/27/20063/15/2006 DONE
Permanent occupancy UNPAID FEE  2/27/2006 DONE
Perm. Occ. Cert. # 10914 issued 2-23-06 to the Body Shop.
BLD-Final2/22/20062/23/20062/23/2006PPASS
DetailsMike Jordan
chip; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
FIRE-Final Inspection2/22/20062/23/20062/23/2006APASS
DetailsTroy Cobbley
Life safety finaled
Permanent Occupancy 2/23/20062/23/2006 DONE
Details
FIRE-Final Inspection2/16/20062/16/20062/16/2006PFAIL
DetailsTroy Cobbley
Inspection was not for final but only for the verification that the smoke evac system is operating correctly
BLD-Framing/Rough-in2/10/20062/13/20062/13/2006PPASS
DetailsMike Jordan
late pm??-chip; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie. Pending ok from mech.
BLD-Framing/Rough-in2/7/20062/8/20062/8/2006PPASS
DetailsJim Storey
Chip; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong columns ok for cover.
BLD-Framing/Rough-in2/2/20062/3/20062/3/2006APART
DetailsMike Jordan
Scheduled by a contractor via Hello! on 2/2/2006 at 2:03:17 PM.
Issue PAID IN FULL permit  1/24/2006 DONE
Permit Ready to Issue  1/20/2006 DONE
Telephone call  1/20/2006 DONE
lady called us, told her permit is ready and fee
Routing - PLAN CHECK1/11/2006 1/19/2006 PASS
Case Summary (BLD)  1/19/2006 DONE
PLANS/APPL TAKEN TO FRONT DESK  1/19/2006 DONE
Case Summary (BLD)  1/19/2006 DONE
Print Occupancy Form  1/19/2006 DONE
Plan assigned to (R_H)12/30/2005 1/19/2006 PASS
1/19/2006 15:07:19 RMH - activity updated through activity BLDA022 from case BLD05-03506.
Plan resubmittals received  1/18/2006 DONE
Received 1 transmittal letter,1 response, & 3 copys of sheets A1.1,A4.1,A4.2 taken to Ron H.
Routing - FIRE1/5/2006 1/11/2006 PASS
See attached comments.
1st review completed  1/11/2006 FAIL
Failed Plan Check.
Routing - PLAN CHECK1/3/2006 1/5/2006 FAIL
Faxed requirements to the architect on 1/5/06, routed plans to fire same day.
Case Summary (BLD)  1/5/2006 DONE
Routing - PUBLIC WORKS12/30/2005 1/3/2006 PASS
Application received  12/30/2005  
Recd Pcfee & Taken To Pln CK  12/30/2005 DONE
Fee Review-notes12/30/200512/30/2005