First Notice | | 6/8/2013 | 6/28/2013 | | DONE |
Tisha Gallop
|
|
|
old project
|
Permanent Occupancy | | | 5/29/2013 | | DONE |
|
|
|
|
BLD-Final | 4/20/2006 | 4/21/2006 | 4/21/2006 | A | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 4/20/2006 at 9:52:17 AM. Contact: ###-####. ok for perm occ
|
FIRE-Final Inspection | 4/20/2006 | 4/20/2006 | 4/20/2006 | P | PASS |
Troy Cobbley
|
|
|
Life safety finaled. Structural inspector to please verify that the suite number gets installed.
|
BLD-Final | 4/7/2006 | 4/7/2006 | 4/7/2006 | P | FAIL |
Dave Hannah
|
|
|
Zack -- pending fire life safety 4-6 PM; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong
|
BLD-Final | 4/6/2006 | 4/7/2006 | 4/7/2006 | A | FAIL |
Dave Hannah
|
|
|
Zack -- pending fire life safety 4-6 PM; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong needs fire sign offs
|
FIRE-Final Inspection | 4/6/2006 | 4/7/2006 | 4/7/2006 | A | FAIL |
Troy Cobbley
|
|
|
Provide sprinkler head in the closet next to the secretary. Considered an occupiable space. Provide suite number.
|
FIRE-Final Inspection | 4/6/2006 | 4/6/2006 | 4/6/2006 | P | DEFR |
Forrest France
|
|
|
Inspection to be completed 4/7 in the am as discussed.
|
BLD-Framing/Rough-in | 3/27/2006 | 3/27/2006 | 3/27/2006 | P | PART |
Dave Hannah
|
|
|
Zach -- ceiling cover; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong ok to cover ceiling after all other trades have signded off
|
BLD-Conference | 3/3/2006 | 3/6/2006 | 3/6/2006 | A | PASS |
Dave Hannah
|
|
|
Zach; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong framing ok to cover after elec
|
FIRE-Conference | 3/3/2006 | 3/6/2006 | 3/6/2006 | A | DONE |
Forrest France
|
|
|
On site discussion regarding tenant improvement modifications that affect fire sprinkler protection and coverage, the proposed work will require a fire sprinkler permit.
|
Issue PAID IN FULL permit | | | 2/28/2006 | | |
|
|
|
|
Print Occupancy Form | | | 2/23/2006 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 2/23/2006 | | |
|
|
|
|
Telephone call | | | 2/23/2006 | | DONE |
|
|
|
lft vm with margie kennedy ###-#### that permit and fees are ready to be picked up also need GC and RCE #
|
Routing - PLAN CHECK | 2/6/2006 | | 2/22/2006 | | PASS |
|
|
|
Approved after resubmittal review.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/22/2006 | | DONE |
|
|
|
|
Plan assigned to (CJW) | 1/10/2006 | | 2/22/2006 | | PASS |
|
|
|
2/22/2006 15:08:01 CJW - activity updated through activity BLDA022 from case BLD06-00015.
|
Plan resubmittals received | | | 2/14/2006 | | DONE |
|
|
|
Received 1 transmittal letter, 1 copy of sheet A0.01, & 2 copys of sheets A2.2,A2.01 taken to Carl W.
|
Routing - FIRE | 2/3/2006 | | 2/6/2006 | | PASS |
|
|
|
Faxed to architect. Attached comments to plans.
|
1st review completed | | | 2/6/2006 | | FAIL |
|
|
|
Failed Plan Check.
|
Routing - PLAN CHECK | 1/11/2006 | | 2/3/2006 | | FAIL |
|
|
|
The IBC plan review was started on January 24, 2006 and was finished on February 3, 2006. Revised drawings were required. See the plan review report.
|
Routing - PUBLIC WORKS | 1/10/2006 | | 1/11/2006 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 1/8/2006 | | |
|
|
|
waiting for contractorregistration sheet - faxed it over 1-8-05
|
Application received | | | 1/4/2006 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 1/4/2006 | | DONE |
|
|
|
|
Fee Review-notes | 1/4/2006 | 1/4/2006 | | | |
|
|
|
|