DOC - Permit Expired | 9/21/2009 | 9/21/2009 | 9/21/2009 | P | PASS |
Tom Arcoraci
|
|
|
|
BLD-Aging Inspection | 9/21/2009 | 9/21/2009 | 9/21/2009 | | PASS |
Tom Arcoraci
|
|
|
|
BLD-Aging Inspection | 7/15/2009 | 7/15/2009 | 7/15/2009 | | PASS |
Tom Arcoraci
|
|
|
|
BLD-Aging Inspection | 5/12/2009 | 5/12/2009 | 5/12/2009 | | PASS |
Tom Arcoraci
|
|
|
|
BLD-Conference | 3/12/2009 | 3/12/2009 | 3/12/2009 | P | PASS |
Tom Arcoraci
|
|
|
no activity
|
BLD-Aging Inspection | 3/10/2009 | 3/10/2009 | 3/10/2009 | | PASS |
Tom Arcoraci
|
|
|
|
BLD-Aging Inspection | 1/8/2009 | 1/8/2009 | 1/8/2009 | | PASS |
Tom Arcoraci
|
|
|
|
BLD-Aging Inspection | 11/7/2008 | 11/7/2008 | 11/7/2008 | | PASS |
Tom Arcoraci
|
|
|
|
BLD-Aging Inspection | 8/15/2008 | 8/15/2008 | 8/19/2008 | | PASS |
Tom Arcoraci
|
|
|
|
BLD-Aging Inspection | 6/2/2008 | 6/2/2008 | 6/2/2008 | | PASS |
Tom Arcoraci
|
|
|
|
BLD-Aging Inspection | 3/3/2008 | 3/3/2008 | 3/3/2008 | | PASS |
Tom Arcoraci
|
|
|
has not started
|
(F) Reprint permit | | | 2/29/2008 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 2/29/2008 | | DONE |
|
|
|
paid for and picked up plan modification
|
Plan assigned to (JCM) | 9/17/2007 | 9/17/2007 | 2/1/2008 | | PASS |
John Menard
|
|
|
2/1/2008 11:06:29 JCM - activity updated through activity BLDA022 from case BLD06-00025.
|
Routing - PLAN CHECK | 11/9/2007 | | 2/1/2008 | | PASS |
John Menard
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/1/2008 | | DONE |
|
|
|
|
Telephone call | | | 2/1/2008 | | DONE |
|
|
|
tlk to patrick McKeegan ###-#### that the plan modification review fees plans are ready to be picked up
|
Override - Parcel Holds | | | 2/1/2008 | | |
|
|
|
|
Permit Ready to Issue | | | 2/1/2008 | | DONE |
|
|
|
|
Plan resubmittals received | | | 1/28/2008 | | |
|
|
|
received "2" tranmittal sheets from Patrick McKeegan, & comment letter "2" pages, "3" pages response letter (3) pages, 2 sets of structural cacls (10) pages----"2" sets of plans with each sheet of S2.OS2.1, S5.O, A2.O, A3.O, A3.1, A3.2, A3.3, A3.5, A3.6, A3.7, A5.2, A5.4, A5.6, A5.8-- plans taken back to John Menard
|
Plan Reviewer's activity | | | 12/20/2007 | | PASS |
|
|
|
Reviewed and approved structural revisions. JCM
|
Plan resubmittals requested | | | 12/20/2007 | | DONE |
|
|
|
E-mailed the architect requesting additional revisions on the plan modification. JCM
|
Plan resubmittals received | | | 11/27/2007 | | |
|
|
|
received letter from patrick mekeegan (4) pages, & letter from us (12) pages-- also 2" sets of plans with each sheet of T1.O, A2.O, A2.1, A2.2, A3.1, A3.2, A3.3, A3. 4, A3.5, A3.6, A3.7, A5.1, A5.2, A5.3, A5.4, A5.5, A5.6, A5.7, A5.8, A5.9, A5.10, A5.11, A6.1, P1.O, P2.O, P3.O, E2.1L, E2.2L, E2. 3L, E3.O --plans take n to John Menard
|
Routing - FIRE | 11/7/2007 | | 11/9/2007 | | PASS |
|
|
|
Updated review comments and transferred red line annotations to new plan sheets. Attached IFC review comments to plans.
|
Plan resubmittals requested | | | 11/7/2007 | | DONE |
|
|
|
E-mailed the architect a copy of the plan review requesting revisions. JCM
|
Routing - PLAN CHECK | 10/1/2007 | | 11/7/2007 | | FAIL |
|
|
|
routed to John
|
Plan resubmittals received | | | 10/26/2007 | | |
|
|
|
Received 1 cover transmittal, 1 response letter, 3 copies of sheet S2.0, S2.1, S3.1, S3.2, S3.3, S4.2, S4.3, 3 copies of supplemental structural calcs and inserted into plans by someone from Patrick McKeegan's office and returned to John Menard///10/26/07 @ 2:10pm BAS
|
Plan resubmittals requested | | | 10/16/2007 | | DONE |
|
|
|
Faxed the architect a copy of the structural review requesting revisions. JCM
|
Routing Off Site - STRUCTURAL | 9/26/2007 | | 10/12/2007 | | FAIL |
|
|
|
Received comment list from consulting structural engineer requesting revisions. JCM
|
Routing - PLANNING | 9/27/2007 | | 10/1/2007 | | PASS |
|
|
|
Approved.
|
Routing - PLAN CHECK | 9/18/2007 | | 9/27/2007 | | |
|
|
|
|
Telephone call | | | 9/26/2007 | | DONE |
|
|
|
called Action Couriers for pick up
|
Plan Modification Accepted | | | 9/17/2007 | | |
|
|
|
plan mod excepted for bld06-00025 for the redesign of modifications include changes structure from steel exterior to concrete/foam exterior, w/steel framed interior. /entire plan set revised. plans routed to John Menard. Plan modification for "3" sets of plans including T1.O, SD1.O, SD2.O, CO.1, C1.1, C1.2, C2.1, C2.2, S1.O, S2.O, S2.1, S2.2, S2.3, S2.4, S3.O, S3.1, S3.2, S3.3, S4.O, S4.1, S4.2, S4.3, S5.O, S5.1, S5.2, S5.2, A2.1, D1.O, A3.O, A3.1, A3.2, A3.3, A3.4, A3.5, A3.6, A3.7, A4.O, A4.1, A5.1, A5.2, A5.3, A5.4, A5.5, A5.6, A5.7, A5.8, A5.9, A6.O, A6.1, P1.O, P2.O, P3.O, P4.O, P5.O, P6.O, M1.O, M1.1, M1.2, M1.3, M2.O, M2.1, M2.2, M2.3, M3.O, M4.O, EC1.O, EO.O, E2.OF, E2.OL, E2.OP, E2.1F, E2.1L, E2.1P, E2.2F, E2.2L, E2.2P, E2.3F, E2.3L, E2.3P, E3.O, & E3.1----any questions call John Menard
|
BLD-Aging Inspection | 7/24/2007 | 7/24/2007 | 7/24/2007 | | NR |
Tom Arcoraci
|
|
|
|
BLD-Aging Inspection | 5/11/2007 | 5/11/2007 | 5/11/2007 | | NR |
Tom Arcoraci
|
|
|
|
Plan resubmittals received | | | 4/12/2007 | | |
|
|
|
Received letter addressed to building inspector and cc to Mike Phillips and 3 copies of page A1.1 & S1.1; per Mike Phillips give to inspector, I put it in Tom Arcoraci's box
|
CHANGE STATUS TO (ISS) | | | 2/20/2007 | | DONE |
|
|
|
already issued previously
|
(F) Reprint permit | | | 2/12/2007 | | |
|
|
|
|
Telephone call | | | 2/9/2007 | | |
|
|
|
let patrick mckeegan at ###-#### that permit has expired & transferred him to jenifer g. to see if he could get an extension
|
Issue PAID IN FULL permit | | | 2/9/2007 | | DONE |
|
|
|
|
CHANGE STATUS TO (RDY) | | | 2/9/2007 | | |
|
|
|
cust paid building fees but needs to bring in ACHD before can issue permit
|
Telephone call | | | 10/30/2006 | | DONE |
|
|
|
lft ms with sec for pat mckeegan ###-#### that permit and fees are ready to be picked up but needs GC/RP and ACHD
|
Permit Ready to Issue | | | 10/30/2006 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 10/27/2006 | | DONE |
|
|
|
|
Routing Off Site - STRUCTURAL | 10/2/2006 | | 10/26/2006 | | PASS |
|
|
|
CH2MHILL failed to complete plan review. Corrections have been addressed by structural engineer Keith Jones of Attwood-Hinzman-Jones.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/26/2006 | | DONE |
|
|
|
|
Plan assigned to (MLO) | 1/9/2006 | | 10/26/2006 | | PASS |
|
|
|
10/26/2006 14:15:14 MLO - activity updated through activity BLDA022 from case BLD06-00025.
|
Routing - FIRE | 10/5/2006 | | 10/9/2006 | | PASS |
|
|
|
Attached updated review comments to plans.
|
Routing - PLAN CHECK | 10/2/2006 | | 10/4/2006 | | PASS |
|
|
|
|
Plan resubmittals received | | | 9/29/2006 | | |
|
|
|
Received 1 cover tranmittal, 3 copies of supplemental structural calcs, 2 copies of the following sheets--T1.0, A2.0, A3.4, A5.1, A5.2, A5.3, A5.4, A5.7, A5.8, A5.9, A5.10, A5.13, S1.0, S2.0, S2.1, S2.2, S2.3, S3.0, S3.1, S3.2, S3.6, S3.3, S3.6, M1.1, M1.2, M1.3 and taken to Mike Otto
|
Routing - PLANNING | 9/20/2006 | | 9/20/2006 | | PASS |
|
|
|
Approved for the DR and the CVA.
|
Plan resubmittals requested | | | 9/14/2006 | | DONE |
|
|
|
IBC corrections
|
Routing - PLAN CHECK | 9/8/2006 | | 9/12/2006 | | FAIL |
|
|
|
Meeting with architect owner to go over remaining items. MLO
|
Plan resubmittals received | | | 9/8/2006 | | |
|
|
|
received transmittal form, a letter from patrick mckeegan (3 pages) & "3" sets of structural calculations from patrick m. (4 pages each) & (2) sheets each of T1.0, SD1.0, EN1.0, S1.0, S2.2, S2.3, S3.3, A2.0, A3.1, A3.2, A3.3, A5.7, A5,10, A5.11, A5.12, A5.13, M1.3, T1.0, SD1.0, EN1.0, S1.0, S2.2, S2.3, S3.3, A2.0, A3.1, A3.2, A3.3, A5.7, A5.10, A5.11, A5.12, A5.13, M1.3,--plans taken to mike otto
|
Routing - FIRE | 7/11/2006 | | 7/14/2006 | | FAIL |
|
|
|
Faxed resubmittal items to architec @###-####. Inserted review comments into plans.
|
Routing Off Site - STRUCTURAL | 6/8/2006 | | 7/6/2006 | | FAIL |
|
|
|
Called Action Couriers for pick up
|
Routing - PLAN CHECK | 6/8/2006 | | 6/13/2006 | | FAIL |
|
|
|
corrections sent to architect. MLO
|
Plan resubmittals requested | | | 6/13/2006 | | DONE |
|
|
|
IBC corrections
|
Plan resubmittals received | | | 6/8/2006 | | DONE |
|
|
|
Received 2 supplimental structural calcs taken to Mike O.
|
Plan resubmittals received | | | 6/6/2006 | | |
|
|
|
Received1 copy of cover transmittal letter to Mike Otto, 3 copies of the following--T1.0, SD1.0, S1.0, S2.0, S2.1, S2.2, S2.3, S2.4, S3.0, S3.1, S3.2, S3.3, S3.4, S3.5, S3.6, S3.7, S4.0, S4.1, S4.2, A2.0, D1.0, A3.0, A3.1, A3.2, A3.3, A3.4, A3.5, A3.6, A5.0, A5.3, A5.5, A5.6, A5.7, A5.8, A5.10, A5.13, A5.14, A6.0 and taken to Mike Otto
|
Routing Off Site - STRUCTURAL | 2/11/2006 | | 2/26/2006 | | FAIL |
|
|
|
|
1st review completed | | | 2/22/2006 | | FAIL |
|
|
|
Failed Plan Check and Fire.
|
Routing - FIRE | 2/16/2006 | | 2/22/2006 | | FAIL |
|
|
|
Faxed review comments to architect. Attached comments to plans.
|
Routing - PLAN CHECK | 1/21/2005 | | 2/16/2006 | | FAIL |
|
|
|
corrections sent to architect
|
Plan resubmittals requested | | | 2/16/2006 | | DONE |
|
|
|
IBC corrections
|
Routing - PLUMBING | 1/13/2006 | | 1/20/2006 | | PASS |
|
|
|
verify condition of existing waste line on the wall in the basement, sewer service and bridge club piping.
|
Routing - Erosion and Sediment | 1/12/2006 | | 1/13/2006 | | PASS |
|
|
|
ESC plan approved with attached conditions.
|
Routing - PUBLIC WORKS | 1/11/2006 | | 1/12/2006 | | PASS |
|
|
|
|
Routing - PLANNING Land Div | 1/9/2006 | | 1/11/2006 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 1/9/2006 | | |
|
|
|
|
Plan routing begun/NEW & ADDTN | | | 1/9/2006 | | |
|
|
|
|
Application received | | | 1/6/2006 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 1/6/2006 | | DONE |
|
|
|
|
Fee Review-notes | 1/6/2006 | 1/6/2006 | | | |
|
|
|
|
Routing - PLANNING | 1/20/2006 | | | | |
|
|
|
Approved per DRH04-00187 for Design Review. Pending review for compliance with CVA04-00035 (Karen Gallagher).
|