Permit Information
Permit NumberBLD06-00028
StatusFinaled
Name GOLIS CONSTRUCTION
Site Address 4125 S GEKELER LN
Project NameGarage Town Ph II, Bldgs 4
Customer Number 
ePlanReviewNo
Description
(Golis Const. RCE-619) Self Storage Buildings * Buildings, #4 Building #4 for phase II * To construct a new 28,416 square feet, noncombustible, self storage buildings for use as private storage units and garages for the storage of motor homes, travel trailers, boats and private vehicles. This building is separated by two three hour fire barrier wall at Grid line 6 and 7 to reduce fire area below 12,000 square feet. All construction per the approved plans and attached comment list. MJP DRH 05-0008
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice BLD2/12/20072/12/20072/16/2007 DONE
Second Notice has not been responded to.
Fee Review-notes1/6/20061/6/20062/16/2007 DONE
Second Notice BLD2/2/20072/2/20072/12/2007 DONE
First Notice has not been responded to.
First Notice 12/19/20062/2/2007 DONE
Permanent occupancy  12/19/2006 DONE
Perm. Occ. Cert. # 11364 issued 12-19-06 to GarageTown Condominiums self-storage buildings.
FIRE-Final Inspection12/13/200612/14/200612/15/2006PPASS
DetailsForrest France
Life safety inspection passed.
BLD-Final12/14/200612/15/200612/15/2006APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 12/14/2006 at 2:27:21 PM. Contact: ###-####.final ok pending all others are ok no sign offs on card except ele.
BLD-Framing/Rough-in10/23/200610/24/200610/24/2006APASS
DetailsJim Storey
dustin; Phone #: ###-#### Internet Inspection Request from: Patricia Smith
BLD-Aging Inspection10/11/200610/11/200610/11/2006 PASS
DetailsJim Storey
wip
BLD-Aging Inspection8/11/20068/11/20068/11/2006 PASS
DetailsJim Storey
placed with si wip
BLD-Footing5/22/20065/22/20065/22/2006PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 5/22/2006 at 7:02:39 AM. Contact: ###-####.wip pending si
BLD-Conference5/22/20065/22/20065/22/2006APASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 5/22/2006 at 7:01:15 AM. Contact: ###-####.
(F) Reprint permit  5/18/2006  
Issue PAID IN FULL permit  5/17/2006 DONE
Print Occupancy Form  5/16/2006 DONE
Telephone call  5/16/2006 DONE
called ###-#### and left voice message for Ron that permit is ready, fee ($78.75), need RP and RCE
Print permit w/o conditions  5/15/2006  
Telephone call  4/4/2006 DONE
left mess for ron ramza at ###-#### that permit is ready & need achd
Permit Ready to Issue  2/17/2006 DONE
Print Occupancy Form  2/17/2006 DONE
1st review completed  2/16/2006 PEND
Pending Plan check.
Routing - PLAN CHECK2/16/2006 2/16/2006 PASS
PLANS/APPL TAKEN TO FRONT DESK  2/16/2006 DONE
Print Pending Permit.LaserJet4  2/16/2006 DONE
Case Summary (BLD)  2/16/2006 DONE
Plan assigned to (M_P)1/9/2006 2/16/2006 PASS
2/16/2006 16:42:53 M_P - activity updated through activity BLDA022 from case BLD06-00028.
Routing - FIRE2/14/2006 2/16/2006 PASS
Attached review comments to plans.
Routing - PLAN CHECK1/25/2006 2/14/2006 PEND
Waiting for others to approve prior to issuing permit.

Removed from hold on 2/3/06.
Need additional calculation to reflect the foundation and information as tohow the buildings will not exceed the allowable fire flow area.
Case Summary (BLD)  2/14/2006  
Plan resubmittals received  2/3/2006 DONE
Received up dated fire flow showing 3,500 gpm.
Plan resubmittals received  2/3/2006 DONE
Received structural calculations reflecting foundation design.
Routing - PLAN CHECK1/20/2006 1/25/2006 FAIL
Removed form hold.
Sent a submittal letter stating the building exceeds the allowable area for fire flow and requesting calculations for the foundation.
Plans will not be routed to the fire departmant unitl the above has been answered and I can do my review.

*** ON HOLD *** Waiting for structural calculations and fire flow information prior to my review.
Plan resubmittals received  1/24/2006 DONE
Received 1 transmittal letter, & 2 structural calcs taken to Mike P.
Routing - PLAN CHECK1/18/2006 1/20/2006 FAIL
*** ON HOLD *** Need structural calculations and fire flow informatio, prior to my review. Called architects office and left message for Pat to call me.
Routing - PLANNING1/13/2006 1/18/2006 PASS
Sara S. Approved. Initial approvals went through the County.
Routing - Erosion and Sediment1/13/2006 1/13/2006 PASS
Reference ESC06-00032 as master ESC plan for project.
Routing - PUBLIC WORKS  1/13/2006 PASS
Routing - PLANNING Land Div1/10/2006 1/11/2006 PASS
Condo Plat (SUB05-00057) has been approved by City Council and signed by the City Engineer.
Plans ACCEPTED BY PLAN TECH  1/10/2006  
Plan routing begun/NEW & ADDTN  1/10/2006  
Application received  1/6/2006  
Recd Pcfee & Taken To Pln CK  1/6/2006 DONE