BLD-Final | 2/12/2008 | 2/13/2008 | 2/13/2008 | A | PASS |
Tony Young
|
|
|
victor Phone #: ###-#### Note: please call 1/2 hr prior to inspection to meet with
|
DOC - Permit Finaled | 2/13/2008 | 2/13/2008 | 2/13/2008 | P | PASS |
Tony Young
|
|
|
c of o issued
|
BLD-Grading Inspection | 2/13/2008 | 2/13/2008 | 2/13/2008 | P | DONE |
Terry Records
|
|
|
Final grading and drainage approved
|
BLD-Final | 2/12/2008 | 2/12/2008 | 2/12/2008 | P | NR |
Tony Young
|
|
|
victor Phone #: ###-#### Note: please call 1/2 hr prior to inspection to meet with
|
BLD-Final | 1/31/2008 | 2/1/2008 | 2/1/2008 | P | NR |
Dave Hannah
|
|
|
Please call Victor 1 hr before going out so he can let you in. Phone #: ###-#### needs terrys hillside final first
|
BLD-Energy code compliance | 7/20/2006 | 7/20/2006 | 7/20/2006 | P | PASS |
Tony Young
|
|
|
john; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley
|
BLD-Framing/Rough-in | 7/20/2006 | 7/20/2006 | 7/20/2006 | P | PASS |
Tony Young
|
|
|
john - reinsp; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley ok to insulate
|
BLD-Framing/Rough-in | 7/17/2006 | 7/17/2006 | 7/17/2006 | P | PASS |
Tony Young
|
|
|
john; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley
|
BLD-Framing/Rough-in | 7/13/2006 | 7/13/2006 | 7/13/2006 | P | FAIL |
Tony Young
|
|
|
needs seal pack prior to frame inspection,, c/n posted
|
BLD-Framing/Rough-in | 7/13/2006 | 7/13/2006 | 7/13/2006 | P | PART |
Tony Young
|
|
|
JIM - NOTE: SHEAR; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles exterior shear ok
|
BLD-Framing/Rough-in | 7/11/2006 | 7/12/2006 | 7/12/2006 | P | NR |
Tony Young
|
|
|
john Note: shear also; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
BLD-Foundation | 3/2/2006 | 3/2/2006 | 3/2/2006 | P | PART |
Tony Young
|
|
|
stem wall insp//matt; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
|
BLD-Footing | 2/28/2006 | 3/1/2006 | 3/1/2006 | A | PART |
Tony Young
|
|
|
MATT; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
PubWorks Subgrade Approval | 3/1/2006 | 3/1/2006 | 3/1/2006 | | DONE |
|
|
|
Footing subgrade was inspected by geotechnical engineer on 2/8/06 and approved. However, there has been significant freeze thaw since then and it is recommended that the subgrade be reinspected.
|
BLD-Footing | 2/27/2006 | 2/28/2006 | 2/28/2006 | P | NR |
Tony Young
|
|
|
matt; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa need hillside 1st
|
BLD-Footing | 2/15/2006 | 2/16/2006 | 2/16/2006 | P | FAIL |
Tony Young
|
|
|
matt; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa not set up,, no soils report yet
|
BLD-Footing | 2/14/2006 | 2/15/2006 | 2/15/2006 | P | NR |
Tony Young
|
|
|
matt; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
|
Issue PAID IN FULL permit | | | 2/3/2006 | | DONE |
|
|
|
|
Plan assigned to (SAM) | 1/10/2006 | 1/10/2006 | 1/30/2006 | | PASS |
|
|
|
1/30/2006 10:42:54 SAM - activity updated through activity BLDA022 from case BLD06-00044.
|
Routing - PLAN CHECK | | | 1/30/2006 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/30/2006 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 1/30/2006 | | |
|
|
|
|
Inspection Record Card- Bld | | | 1/30/2006 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 1/30/2006 | | DONE |
|
|
|
|
Telephone call | | | 1/30/2006 | | DONE |
|
|
|
called ###-#### and told Curran that permit is ready and fees
|
Case Summary (BLD) | | | 1/26/2006 | | |
|
|
|
|
Plan Reviewer's activity | | | 1/23/2006 | | DONE |
|
|
|
I called and talked to Jon Foster. I let him know that I need a new REScheck showing roof and the correct floor, window and door areas. Plans are on hold.
|
Routing - FIRE | 1/17/2006 | | 1/17/2006 | | PASS |
|
|
|
This house shall be fitted with an NFPA 13D sprinkler system, modified to include a single row of dry sidewall sprinklers along all walls common to attached garage and the living space. (Quail Ridge # 7)
|
Routing - Erosion and Sediment | 1/13/2006 | | 1/17/2006 | | PASS |
|
|
|
ESC plan approved with attached conditions.
|
Routing - PLANNING | 1/11/2006 | | 1/13/2006 | | PASS |
|
|
|
33 wide max paved driveway
|
Routing - PUBLIC WORKS | 1/11/2006 | | 1/11/2006 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS GRADING | 1/10/2006 | | 1/11/2006 | | PASS |
|
|
|
Approved as Category 3
|
Application received | | | 1/10/2006 | | |
|
|
|
|