Letter of compliance | | | 11/15/2007 | | DONE |
|
|
|
|
BLD-Final | 11/7/2007 | 11/8/2007 | 11/7/2007 | A | PASS |
Tom Arcoraci
|
|
|
Jacque; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt
|
CHANGE STATUS TO (ISS) | | | 11/7/2007 | | DONE |
|
|
|
|
Code Occupancy Approval | 10/15/2007 | 10/15/2007 | 10/15/2007 | P | PASS |
Dena Gambrel
|
|
|
|
(F) Reprint permit | | | 7/25/2007 | | |
|
|
|
|
Case Summary (BLD) | | | 4/23/2007 | | |
|
|
|
|
Code Occupancy Approval Temp | 12/18/2006 | 12/18/2006 | 12/18/2006 | P | DONE |
Dena Gambrel
|
|
|
12-18-06 Temporary Occcupancy Only. Bond has been received by the City for the Landscaping.
|
PubWorks Occupancy Approval | 12/15/2006 | 12/15/2006 | 12/15/2006 | | DONE |
|
|
|
Signed off project 12/12/06 R. Anderson.
|
FIRE-Final Inspection | 12/11/2006 | 12/12/2006 | 12/12/2006 | A | PASS |
Troy Cobbley
|
|
|
Life safety for the building shell is passed.
|
FIRE-Final Inspection | 12/11/2006 | 12/11/2006 | 12/11/2006 | P | CANC |
Troy Cobbley
|
|
|
Not ready for inspection until fire alarm is complete
|
BLD-Final | 12/8/2006 | 12/8/2006 | 12/8/2006 | P | NR |
Tom Arcoraci
|
|
|
john ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith
|
BLD-Aging Inspection | 11/17/2006 | 11/17/2006 | 11/17/2006 | | PASS |
Tom Arcoraci
|
|
|
|
BLD-Framing/Rough-in | 9/15/2006 | 9/15/2006 | 9/15/2006 | P | CANC |
Tom Arcoraci
|
|
|
cancel - wrong permit john - storm drain ; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley
|
BLD-Framing/Rough-in | 8/28/2006 | 8/28/2006 | 8/28/2006 | P | PART |
Tom Arcoraci
|
|
|
john - roof & wall; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley roof and int wall ok
|
BLD-Aging Inspection | 8/15/2006 | 8/15/2006 | 8/15/2006 | | PASS |
Tom Arcoraci
|
|
|
|
BLD-Footing | 6/8/2006 | 6/14/2006 | 6/14/2006 | A | PART |
Dave Hannah
|
|
|
john Note: loading deck stem wall - pouring concrete after 11:00 ; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles loading dock ok to pour
|
BLD-Footing | 6/8/2006 | 6/12/2006 | 6/12/2006 | A | PART |
Jim Storey
|
|
|
john Note: loading deck - pouring concrete after 10:00 am; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles placed w/si ok
|
Inspection Record Card- Bld | | | 6/8/2006 | | DONE |
|
|
|
|
Plan assigned to (JCM) | 5/25/2006 | 5/25/2006 | 5/30/2006 | | PASS |
|
|
|
5/30/2006 08:41:17 JCM - activity updated through activity BLDA022 from case BLD06-00051.
|
Routing - PLAN CHECK | 5/26/2006 | | 5/30/2006 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/30/2006 | | DONE |
|
|
|
|
Telephone call | | | 5/30/2006 | | DONE |
|
|
|
called ###-#### and told Bob Maxey that permit is ready and fee
|
Override - Parcel Holds | | | 5/30/2006 | | |
|
|
|
|
Permit Ready to Issue | | | 5/30/2006 | | |
|
|
|
|
Routing - PLANNING | 5/25/2006 | | 5/26/2006 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 5/25/2006 | | 5/25/2006 | | PASS |
|
|
|
|
Plan Reviewer's activity | | | 5/25/2006 | | PASS |
|
|
|
Approved plans modification, submitted 5/24/06, to make changes to exterior window and door locations and numbers on the north and east sides to accommodate future tenant improvement. This permit is also for foundation modification for future loading dock. JCM
|
Plan Modification Accepted | | | 5/25/2006 | | |
|
|
|
Plan modification excepted for Bld06-00051 for the redesign of adding windows to the Phillippi St. elevation. Change configuration on Bethyl St. elevation. Modifications intended to allow construction in a logical manner to accommodate upcoming tenant improvement application. A new zoning certificate has been issued for these upcoming changes on sheets A-2 & A-4. Routed to John Menard.
|
BLD-Footing | 5/16/2006 | 5/22/2006 | 5/22/2006 | A | PART |
Mike Jordan
|
|
|
JOHN NOTE: POURING AT NOON; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles. Interior column pad footings.
|
BLD-Footing | 5/11/2006 | 5/15/2006 | 5/15/2006 | P | PART |
Tony Young
|
|
|
john; Phone #: ###-#### Note: pour 2:30 pm Internet Inspection Request from: Cathy Chiles south and east ftgs ok pending s. i. report
|
BLD-Footing | 5/9/2006 | 5/10/2006 | 5/10/2006 | A | PART |
Mike Jordan
|
|
|
call first john will be pouring at 11:00; Phone #: ###-#### Internet Inspection Request from: Rita DeYoung.wip. West and North footings. Contractor is getting special insp.
|
Issue PAID IN FULL permit | | | 4/20/2006 | | DONE |
|
|
|
|
CHANGE ISSUED DATE | | | 4/20/2006 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 2/24/2006 | | 3/22/2006 | | PASS |
|
|
|
|
Routing Off Site - STRUCTURAL | 3/21/2006 | | 3/22/2006 | | PASS |
|
|
|
Called Action Couriers for pick up - Received e-mailed letter from the consulting structural engineer approving the last resubmitted revisions. JCM
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/22/2006 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 3/22/2006 | | |
|
|
|
|
Permit Ready to Issue | | | 3/22/2006 | | DONE |
|
|
|
|
Telephone call | | | 3/22/2006 | | DONE |
|
|
|
called ###-####and told Tim that permit is ready, fees, and need ACHD
|
Plan assigned to (JCM) | 1/11/2006 | | 3/22/2006 | | PASS |
|
|
|
3/22/2006 09:39:28 JCM - activity updated through activity BLDA022 from case BLD06-00051.
|
Plan resubmittals received | | | 3/21/2006 | | DONE |
|
|
|
Received 2 response,& 3 sheets of S4 taken to John M.
|
Plan resubmittals requested | | | 3/16/2006 | | DONE |
|
|
|
E-mailed the architect a copy of the comment list from the constulting structural engineer for the second review requesting additional revisions. JCM
|
Routing Off Site - STRUCTURAL | 3/8/2006 | | 3/15/2006 | | FAIL |
|
|
|
|
Routing Off Site - STRUCTURAL | 2/21/2006 | | 3/7/2006 | | |
|
|
|
Called Action Couriers for pick up - Plan resubmittals sent to the wrong consulting structural engineer. Plans were returned and routed to the correct engineering firm. JCM
|
Routing - PLANNING Land Div | 2/24/2006 | | 2/24/2006 | | PASS |
|
|
|
The appropriate documentation has been submitted.
|
Routing - PLAN CHECK | 1/31/2006 | | 2/24/2006 | | |
|
|
|
|
Plan resubmittals received | | | 2/21/2006 | | |
|
|
|
Recceived 3 copies of the following: Structural calcs, S-1, S-2, S-3, S-4. Taken to John M.
|
Plan resubmittals requested | | | 2/1/2006 | | DONE |
|
|
|
E-mailed the architect with a copy of the comment list from the consulting structural engineer requesting revisions. JCM
|
1st review completed | | | 1/31/2006 | | FAIL |
|
|
|
Failed Planning.
|
Routing Off Site - STRUCTURAL | 1/12/2006 | | 1/31/2006 | | FAIL |
|
|
|
Called PDQ for pick up - Received an e-mailed comment list from the consulting structural engineer requesting revisions. JCM
|
Routing - FIRE | 1/30/2006 | | 1/31/2006 | | PASS |
|
|
|
See attached comments.
|
Routing - PLAN CHECK | 1/26/2006 | | 1/30/2006 | | PASS |
|
|
|
John M.
|
Plan Reviewer's activity | | | 1/30/2006 | | PASS |
|
|
|
Plans reviewed and approved as a type IIIB constructed addition to the existing warehouse building. JCM
|
Routing - PLANNING | 1/24/2006 | | 1/26/2006 | | PASS |
|
|
|
Approver per DRH05-00345 and as noted on sheet L-1 and sheet A-1.
|
Routing - PLUMBING | 1/24/2006 | | 1/24/2006 | | PASS |
|
|
|
provide thermol expantion protection, increase venting to 7.07 sq. in. on each side.
|
Routing - Erosion and Sediment | 1/23/2006 | | 1/24/2006 | | PASS |
|
|
|
ESC plan approved with attached conditions.
|
Routing - PUBLIC WORKS | 1/19/2006 | | 1/23/2006 | | PASS |
|
|
|
|
Routing - PLANNING Land Div | 1/11/2006 | | 1/19/2006 | | FAIL |
|
|
|
Applicant/Owner must show proof of legal land division. (ROS signed by city or deed dated prior to Oct. 30, 1965)
|
Plans ACCEPTED BY PLAN TECH | | | 1/11/2006 | | |
|
|
|
|
Plan routing begun/NEW & ADDTN | | | 1/11/2006 | | |
|
|
|
|
Application received | | | 1/11/2006 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 1/11/2006 | | DONE |
|
|
|
|
Fee Review-notes | 1/11/2006 | 1/11/2006 | | | |
|
|
|
|