Third Notice BLD | 1/8/2007 | 1/8/2007 | 2/7/2007 | | DONE |
|
|
|
Second Notice has not been responded to.
|
Fee Review-notes | 1/11/2006 | 1/11/2006 | 2/7/2007 | | DONE |
|
|
|
|
Second Notice BLD | 12/27/2006 | 12/27/2006 | 1/8/2007 | | DONE |
|
|
|
First Notice has not been responded to.
|
First Notice | | 10/25/2006 | 12/27/2006 | | DONE |
|
|
|
|
Permanent occupancy | | | 10/25/2006 | | DONE |
|
|
|
Perm. Occ. Cerr. # 11264 issued 10-25-06 to the Kieffer Design Office.
|
Permanent Occupancy | | 8/16/2006 | 8/16/2006 | | DONE |
|
|
|
|
BLD-Final | 8/8/2006 | 8/9/2006 | 8/15/2006 | P | PASS |
Dave Hannah
|
|
|
robin; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles ok for perm occ
|
FIRE-Final Inspection | 8/8/2006 | 8/9/2006 | 8/9/2006 | A | PASS |
Forrest France
|
|
|
Items on previous c/n have been completed, certification for the new extinguishers to be performed today.
|
BLD-Final | 8/4/2006 | 8/7/2006 | 8/7/2006 | A | NR |
Tom Arcoraci
|
|
|
tom (or judy@###-####); Phone #: ###-#### Internet Inspection Request from: Barbara Buckley
|
FIRE-Final Inspection | 8/4/2006 | 8/7/2006 | 8/7/2006 | A | FAIL |
Forrest France
|
|
|
Provide two fire extinguishers per review notes mounted with the handle no higher than 48" AFF along a normal path of travel with a current certification tag, repair non-functional exit sign/emergency light at the main entry/exit, provide approved door hardware at the mens restroom and the back exit, provide doors and hardware at all locations indicated on plans for verification of code compliance, the threshold at the back exit exceeds min. height differential to the landing, roll up door at the exterior of the building above the back exit door is not allowed.
|
BLD-Framing/Rough-in | 6/21/2006 | 6/22/2006 | 6/22/2006 | A | PART |
Tony Young
|
|
|
tom - reinsp; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley rear door area/ colulm,, ok pending revision and letter of ok from engineer,, masonary to concrete,,
|
BLD-Framing/Rough-in | 6/21/2006 | 6/21/2006 | 6/21/2006 | P | NR |
Tony Young
|
|
|
tom; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley
|
BLD-Framing/Rough-in | 5/26/2006 | 5/26/2006 | 5/26/2006 | P | PART |
Tony Young
|
|
|
TOM; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles interior walls ok to cover
|
BLD-Framing/Rough-in | 5/4/2006 | 5/5/2006 | 5/5/2006 | A | PART |
Tony Young
|
|
|
tom; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa interior walls W/OUT plumbing ok to cover
|
BLD-Framing/Rough-in | 4/12/2006 | 4/13/2006 | 4/13/2006 | A | PART |
Tony Young
|
|
|
Tom; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong walls w/ just elec. ok to cover,( non load bearing partion walls),, conf on a d a, ok to build half wall beside toilet for handrail
|
Issue PAID IN FULL permit | | | 3/30/2006 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 3/10/2006 | | 3/16/2006 | | PASS |
|
|
|
To permit desk to issue.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/16/2006 | | PASS |
|
|
|
|
Print Occupancy Form | | | 3/16/2006 | | DONE |
|
|
|
|
Telephone call | | | 3/16/2006 | | |
|
|
|
Left message with Patrick McKeegan Architects ###-#### to pick up permit and to provide G.C. and RCE# 3-16-06 eus
|
Permit Ready to Issue | | | 3/16/2006 | | |
|
|
|
|
Plan assigned to (DRS) | 1/26/2006 | | 3/16/2006 | | PASS |
|
|
|
3/16/2006 07:03:46 DRS - activity updated through activity BLDA022 from case BLD06-00056.
|
Routing - FIRE | 3/9/2006 | | 3/10/2006 | | PASS |
|
|
|
Attached review comments to plans. Faxed review comments to architect.
|
Routing - PLAN CHECK | 2/3/2006 | | 3/9/2006 | | PEND |
|
|
|
Received resubmittals from architect (3/2/06 & 3/8/06). No further resubmittals required. Re-routing to fire code analyst.
|
Plan resubmittals received | | | 3/8/2006 | | |
|
|
|
Received 1 cover memorandum letter, 2 copies of A3.0, 2 copies of A4.0 and taken to Dan S.
|
Plan Reviewer's activity | | | 3/2/2006 | | DONE |
|
|
|
Inserted architects resubmittal plans into original sets. Reviewing of resubmittals revealed that the lighting requirements for energy code compliance were designed improperly and exceeded allowed watts considerably for track lighting indicated. Also there is a question concerning the removal of masonry wall at the rear of the building for new 7' overhead door. this appears to leave approximately 14' of opening in masonry. No engineering was provided for this condition but the architects plans indicate a 1'-3" walls (pier) to be installed between the new overhead door and new man door with sidelight. I have called the engineer, Riley Mahafey and left a voice message asking him to call me back to discuss my concerns. I called Pat McKeegan concerning the energy code failure for the lighting. He will get with the owner and review what changes need to be made and resubmit.
|
Plan resubmittals requested | | | 3/2/2006 | | DONE |
|
|
|
Called Pat McKeegan to review energy code requirements for lighting, especially track lighting. Plan resubmittals show compliance by 10 watts but fixture count was off, wrong watts were used for some fixture's and method to determine track lighting requirements was not properly done. Energy code design is off considerably. Pat will review with Judy Keiffer and provide energy compliant drawings for this project.
|
Telephone call | | | 3/2/2006 | | DONE |
|
|
|
Called Riley Mahaffey, Lochsa Engineering, concerning the design requirements for the rear masonry wall having a large portion removed for new overhead door. Plans do not clearly indicate what is to be done. Left voice message for Riley to call me back.
|
Telephone call | | | 3/2/2006 | | DONE |
|
|
|
Called Pat McKeegan concerning plan resubmittals of 2/28/06 and noncompliance with energy code requirements for lighting for the new tenant. He will provide corrected drawings.
|
Plan resubmittals received | | | 2/28/2006 | | |
|
|
|
Received 1-2 page response letter 1 copy of United water flow info and 3 each of the following- T1.0, A1.0, A2.0, A2.1, A3.0, A4.0 and taken to Dan S.
|
Routing - FIRE | 2/3/2006 | | 2/3/2006 | | FAIL |
|
|
|
Faxed resubmittal items to architect. Comments attached to plans.
|
Routing - PLAN CHECK | 1/27/2006 | | 2/3/2006 | | FAIL |
|
|
|
Faxed and e-mailed copy of items needing to be addressed by the architect before further plan review can be done. Routing to fire code analyst for review.
|
1st review completed | | | 2/3/2006 | | FAIL |
|
|
|
Failed Plan Check and Fire.
|
Plan resubmittals received | | | 1/31/2006 | | DONE |
|
|
|
Received 1 letter taken to Dan S.
|
Routing - PLANNING | 1/31/2006 | | 1/31/2006 | | PASS |
|
|
|
Received a letter from the applicant indicating the canopy will not be constructed at this time.
|
Routing - PUBLIC WORKS | 1/26/2006 | | 1/27/2006 | | PASS |
|
|
|
|
Routing - PLANNING | 1/27/2006 | | 1/27/2006 | | FAIL |
|
|
|
Cody Riddle CZC05-00244
Applicant failed to provide the required lic. agreement w/ ACHD for the awning overhanging the ROW.
|
Plans ACCEPTED BY PLAN TECH | | | 1/13/2006 | | |
|
|
|
|
Application received | | | 1/11/2006 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 1/11/2006 | | DONE |
|
|
|
|