BLD-Aging Inspection | 9/28/2010 | 9/28/2010 | 9/30/2010 | | DONE |
Mike Jordan
|
|
|
|
DOC - Permit Expired | 9/30/2010 | 9/30/2010 | 9/30/2010 | A | PASS |
Mike Jordan
|
|
|
Permit is expired. No work or required inspections have been conducted. Will have to submit new plans and get new permit for ant further work.
|
BLD-Aging Inspection | 7/26/2010 | 7/26/2010 | 8/3/2010 | | PEND |
Mike Jordan
|
|
|
|
Case Summary (BLD) | | | 6/17/2010 | | |
|
|
|
|
BLD-Aging Inspection | 4/28/2010 | 4/28/2010 | 4/28/2010 | | PEND |
Mike Jordan
|
|
|
|
Case Summary (BLD) | | | 4/23/2010 | | |
|
|
|
|
Meeting | | | 4/23/2010 | | DONE |
|
|
|
Met with owner's representative. Proposal to construct an elevator addition outside of the current building envelope. Told him that a new permit is required. Sent him to talk to Planning about Design Review. Asked him to have the Architect provide "as-builts" so that we will know what work was done under this permit so that it can be expired. CJW
|
Case Summary (BLD) | | | 3/25/2010 | | |
|
|
|
|
BLD-Other | 6/30/2008 | 7/1/2008 | 7/1/2008 | P | PASS |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 6/30/2008 at 3:27:41 PM. Contact: ###-####. ceiling grid ok. All issues resolved.
|
BLD-Other | 6/24/2008 | 6/25/2008 | 6/25/2008 | A | FAIL |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 6/24/2008 at 2:02:43 PM. Contact: ###-####. Fire sprinler ri insp. failed. Also needs to provide approved plans, provide additional wires for diffusers and return air grills and complete west wall. c/n posted.
|
BLD-Other | 4/18/2008 | 4/18/2008 | 4/18/2008 | P | PASS |
Jim Sly
|
|
|
george Note: grid Phone #: ###-####
|
BLD-Conference | 4/9/2008 | 4/9/2008 | 4/9/2008 | P | PASS |
Mike Jordan
|
|
|
Spoke to George with Benchmark const. regarding this job. No new work is planned but maybee in near future. Noted to George that permit is about to expire. If no new work is going to take place in next 90 days, they may have to have scope of work modified to reflect what is completed at this time and resubmit new plans when remaining work can take place. Contractor siad he would call in a ceiling grid insp.
|
BLD-Other | 8/17/2007 | 8/17/2007 | 8/17/2007 | P | CANC |
Mike Jordan
|
|
|
scott Note: ceiling grid Phone #: ###-####2nd floor corridor.
|
BLD-Other | 8/8/2007 | 8/9/2007 | 8/9/2007 | A | NR |
Mike Jordan
|
|
|
scott - ceiling grid Phone #: ###-####. Approved plan calls for hardlid, contractor has switched to grid ceiling. Needs to resubmit refected ceiling plan for approval.
|
BLD-Framing/Rough-in | 6/26/2007 | 6/27/2007 | 6/27/2007 | A | PART |
Mike Jordan
|
|
|
scott Phone #: ###-####. Phase 1. Inspected wood framed walls at 2nd floor corrridors, and privously built steel stud walls at 1st. floor. Needs to have elec. ok 1st. floor before cover.
|
BLD-Aging Inspection | 4/9/2007 | 4/9/2007 | 4/13/2007 | | CANC |
Mike Jordan
|
|
|
|
Issue PAID IN FULL permit | | | 1/5/2007 | | DONE |
|
|
|
|
Ready Permit EXTENDED | | | 10/12/2006 | | |
|
|
|
per jenifer g. will extend permit until january 8th 2007. see scanned document.
|
Telephone call | | | 9/25/2006 | | DONE |
|
|
|
patrick mckeegan came in to pay for permit and told him we needed the g.c. 1st. he said it was out to bid. i talked to him last friday and did not have a change to talk to rita..regarding permit has expired--he wrote a letter to jenifer g. for an extension...definitely wants permit
|
Telephone call | | | 9/20/2006 | | DONE |
|
|
|
left mess for pat mckeegan at ###-#### that permit is ready
|
Permit Ready to Issue | | | 9/5/2006 | | DONE |
|
|
|
|
Telephone call | | | 9/5/2006 | | DONE |
|
|
|
left mess for patrick at ###-#### that permit is ready
|
Routing - PLAN CHECK | 8/29/2006 | | 8/31/2006 | | PASS |
|
|
|
Plans and permit approved and taken to front desk.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/31/2006 | | PASS |
|
|
|
|
Print Pending Permit.LaserJet4 | | | 8/31/2006 | | |
|
|
|
|
Case Summary (BLD) | | | 8/31/2006 | | |
|
|
|
|
Inspection Record Card- Bld | | | 8/31/2006 | | DONE |
|
|
|
|
Plan assigned to (JCB) | 1/26/2006 | | 8/31/2006 | | PASS |
|
|
|
8/31/2006 12:58:35 JCB - activity updated through activity BLDA022 from case BLD06-00057.
|
Routing - Erosion and Sediment | 8/29/2006 | | 8/29/2006 | | PASS |
|
|
|
ESC waiver request approved with attached conditions.
|
Routing - PLAN CHECK | 8/15/2006 | | 8/29/2006 | | FAIL |
|
|
|
Still need architect to come in and sign sheets A4.1 and A4.2 and also the Lighting Compliance. Plans to route to Erosion/Sediment Control for review.
|
Plan resubmittals received | | | 8/25/2006 | | |
|
|
|
Received transmittal sheet, erosion & sediment control applicaiton, revised Certificate of Value, 5pg. Project Start Up for Special Inspections, 2 sets of structural calculations, 2 copies of the following pages: S1.1, S1.2, S2.1, A4.1 (not signed), A4.2 (not signed); taken to Jason Blais
|
Routing - PLANNING | 8/14/2006 | | 8/15/2006 | | PASS |
|
|
|
Sarah. Approved per CZC05-00260
|
Routing - PLAN CHECK | 7/10/2006 | | 8/14/2006 | | FAIL |
|
|
|
Still have not received requested items. Plans to route to Sarah in Planning.
|
1st review completed | | | 7/10/2006 | | FAIL |
|
|
|
Failed Plan Check.
|
Routing - FIRE | 7/6/2006 | | 7/10/2006 | | PASS |
|
|
|
Attached review comments to plans.
|
Routing - PLAN CHECK | 3/1/2006 | | 7/6/2006 | | FAIL |
|
|
|
Called architect. Some issues still needing to be addressed were discussed. Architect stated he will fax additional information over in the next few days. Plans to route to Fire Dept. for review.
|
Telephone call | | | 7/5/2006 | | DONE |
|
|
|
Talked with Pat McKeegan concerning some issues still needing to be addressed. He acknowledged and will fax over some additional information in the next few days.
|
Telephone call | | | 7/3/2006 | | DONE |
|
|
|
Called and left a message for Pat McKeegan to discuss the project.
|
Plan resubmittals received | | | 6/8/2006 | | DONE |
|
|
|
Received 2 structural calcs,& 3 copys of sheets g0.1,a1.1,a2.1,a2.2,a3.1,a3.2,a3.3,a3.4,a3.5,a4.1,a4.2a4.3,a4.4,a4.5,a5.1,a6.1,a6.2,a8.1,s1.1,s1.2,s2.1 taken to Jason B.
|
Routing - FIRE | 3/1/2006 | | 3/1/2006 | | FAIL |
|
|
|
No fire review done. Talked with Scott A. Does not want to review the plans if I have not reviewed the plans. Plans submitted were not reviewable. Numerous issues to address. Met with architect and he will address and provide more complete plans.
|
Routing - Erosion and Sediment | 3/1/2006 | | 3/1/2006 | | FAIL |
|
|
|
Talked with Steve Webb and need ESC application to be submitted.
|
Meeting | | | 3/1/2006 | | DONE |
|
|
|
Plans are incomplete and not reviewable. (Missing a lot of structural calculations/designs/details, accessible route/elevator required to second floor, fire rated walls/doors shown for unknown reason, exiting issues, etc...) Met with architect to go over several issues. A full plan review has not been conducted. A full plan review will need to be done when resubmittal plans are provided. Architect stated he would address and resubmit more complete plans.
|
1st review completed | | | 3/1/2006 | | FAIL |
|
|
|
Failed planning, plan review, erosion/sediment control, and fire.
|
Routing - PLAN CHECK | 1/31/2006 | | 2/28/2006 | | FAIL |
|
|
|
Plans are incomplete and not reviewable. (Missing a lot of structural calculations/designs/details, accessible route/elevator required to second floor, fire rated walls/doors shown for unknown reason, exiting issues, etc...) Met with architect to go over several issues. A full plan review has not been conducted. A full plan review will need to be done when resubmittal plans are provided. Architect stated he would address and resubmit more complete plans.
|
Routing - PLANNING | 1/27/2006 | | 1/31/2006 | | FAIL |
|
|
|
Does not comply with conditions of CZC05-00260.
|
Routing - PUBLIC WORKS | 1/26/2006 | | 1/27/2006 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 1/13/2006 | | |
|
|
|
|
Application received | | | 1/11/2006 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 1/11/2006 | | DONE |
|
|
|
|
Fee Review-notes | 1/11/2006 | 1/11/2006 | | | |
|
|
|
|
Plan resubmittals received | | | | | 8 |
|
|
|
Received 1 cover transmittal and 1 copy of sheet A4.4 and taken to George Slane for Mike Jordan also called Mike Jordan and told him that the plans are in George's office///8/14/07 @ 4:07pm BAS
|