(F) Reprint permit | | | 8/20/2008 | | DONE |
|
|
|
mike young - ###-#### - called and asked for copy of permit and inspections be faxed to him at ###-####
|
Second Notice BLD | 8/11/2008 | 8/11/2008 | 8/13/2008 | | DONE |
Cathy Brown
|
|
|
First Notice has not been responded to.
|
First Notice | | 5/20/2008 | 8/11/2008 | | DONE |
|
|
|
|
Permanent Occupancy | | | 5/20/2008 | | DONE |
|
|
|
|
Temporary Occupancy | 3/4/2008 | 6/2/2008 | 3/4/2008 | | DONE |
Cathy Weisshaupt
|
|
|
|
BLD-Final | 2/29/2008 | 2/29/2008 | 2/29/2008 | P | PASS |
Dave Hannah
|
|
|
mel Phone #: ###-#### ok for perm occ
|
FIRE-Final Inspection | 2/28/2008 | 2/28/2008 | 2/28/2008 | P | PASS |
Forrest France
|
|
|
Fire life safety inspection passed, signage at the door to the FACP and riser room to be provided- verified at next visit for the adjacent building permits.
|
BLD-Final | 2/28/2008 | 2/28/2008 | 2/28/2008 | P | CANC |
Dave Hannah
|
|
|
mel Phone #: ###-####
|
Code Occupancy Approval Temp | 2/27/2008 | 2/27/2008 | 2/27/2008 | P | DONE |
Michael Garner
|
|
|
site inspection done - this is for a temporary approval - bike racks are not emplaced - but are on site - landscaping is not complete - though, the sprinklers are in place - I spoke w/onsite foreman - we agreed to a bond amount of 24K plus 10%
|
BLD-Framing/Rough-in | 7/10/2007 | 7/10/2007 | 7/10/2007 | P | PASS |
Dave Hannah
|
|
|
mel; Phone #: ###-#### Internet Inspection Request from: Victoria Apatang
|
BLD-Framing/Rough-in | 7/9/2007 | 7/9/2007 | 7/9/2007 | P | PART |
Mike Jordan
|
|
|
mel; Phone #: ###-#### Internet Inspection Request from: Victoria Apatang. Needs to complete firestop at 1hr. walls. Interior shearwalls not attached as per plan. Rock behind mech. chases on 2nd floor not atteched correctly. Gave ok to start rock on lid at carport. Insul installed, double rock around beams and between floor joist ok. All for bldg. 1.
|
BLD-Framing/Rough-in | 6/29/2007 | 7/2/2007 | 7/2/2007 | A | PART |
Dave Hannah
|
|
|
mel; Phone #: ###-#### Internet Inspection Request from: Victoria Apatang ok to shear int walls
|
BLD-Conference | 4/27/2007 | 4/27/2007 | 4/27/2007 | P | PART |
Dave Hannah
|
|
|
Mel; Phone #: ###-#### Internet Inspection Request from: Victoria Beall went over fire walls ect and fire proofing
|
BLD-Other | 3/21/2007 | 3/22/2007 | 3/22/2007 | A | PART |
Dave Hannah
|
|
|
Harvey sheer wall; Phone #: ###-#### Internet Inspection Request from: Stacie Backus shear ext ok need to install flr to flr strapes
|
BLD-Foundation | 3/8/2007 | 3/9/2007 | 3/9/2007 | A | PART |
Dave Hannah
|
|
|
Harvey; Phone #: ###-#### Internet Inspection Request from: Stacie Backus columns ok to pour
|
BLD-Foundation | 3/1/2007 | 3/2/2007 | 3/2/2007 | A | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 3/1/2007 at 10:21:34 AM. Contact: ###-####. columns above footing pads
|
BLD-Footing | 2/23/2007 | 2/26/2007 | 2/26/2007 | A | PART |
Dave Hannah
|
|
|
harvey ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith colunm ftgs ok to place concrete
|
Plan resubmittals received | | | 2/26/2007 | | |
|
|
|
Received 6 copies of sheets T1, GRD-1, GRD-2, GRD-3, DTL-1 and taken to
|
BLD-Footing | 2/22/2007 | 2/23/2007 | 2/23/2007 | A | CANC |
Dave Hannah
|
|
|
harvey; Phone #: ###-#### Internet Inspection Request from: Victoria Beall
|
BLD-Foundation | 1/11/2007 | 1/12/2007 | 1/12/2007 | A | PART |
Jim Storey
|
|
|
harvey - stemwall ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith rebar ok wip
|
BLD-Foundation | 1/10/2007 | 1/11/2007 | 1/11/2007 | A | NR |
Dave Hannah
|
|
|
harvey; Phone #: ###-#### Internet Inspection Request from: Victoria Beall
|
BLD-Footing | 1/8/2007 | 1/9/2007 | 1/9/2007 | A | PART |
Jim Sly
|
|
|
harvey - rebar ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith Footing OK pending special inspection, tests, and approvals from MTI......3500 psi concrete design strength.
|
Inspection Record Card- Bld | | | 1/8/2007 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 1/3/2007 | | DONE |
|
|
|
|
Print Occupancy Form | | | 11/8/2006 | | DONE |
|
|
|
|
Telephone call | | | 11/8/2006 | | DONE |
|
|
|
tlk to neil of trout arch that permit and fees are ready to be picked up but needs ACHD/RP/GC
|
Permit Ready to Issue | | | 11/8/2006 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 10/30/2006 | | 11/6/2006 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/6/2006 | | DONE |
|
|
|
|
Plan assigned to (M_P) | 1/13/2006 | | 11/6/2006 | | PASS |
|
|
|
11/6/2006 13:32:36 M_P - activity updated through activity BLDA022 from case BLD06-00074.
|
Plan resubmittals received | | | 10/30/2006 | | |
|
|
|
Received transmittal sheet and two copies of pages A3.4 & A8.7; taken to Mike Phillips
|
Routing - PLAN CHECK | 9/5/2006 | | 10/30/2006 | | FAIL |
|
|
|
Called architect and requested additional plans to be submitted to reflect: concrete decks that the can not be supported by wood framing and provide clearances around tubs in the single story units to meet accessibility issues. Additional review required prior to issuing permit.
|
Plan resubmittals received | | | 10/20/2006 | | |
|
|
|
Received plan review responce from trout Architects (1 copy 5 pages), 1 copy of Manufacturer's product cut sheets for best bath ( 2 pages), 1 copy of page 3 of Trus Joist info, received 2 copies of the following sheets--A0.1, A0.1a, A0.1b, A1.1, A1.2, A1.3, A1.4, A1.5, A1.6, A2.6, A3.1, A3.2, A3.3, A3.4, A3.5, A3.6, A4.1, A4.2, A4.3, A8.3, A8.4, A8.5, A8.6, A8.7, S-1.0, S-2.0, S-2.1, S-2.2, S-2.3, S-3.0, S-3.1, S-3.2, S-3.2, S-3.3-S-3.4, S-4.0, S-4.1, S-4.2, S-5.0, S-5.1, S-5.2, S-5.3, P2.1--all the sheets were inserted to the Issue & Office copy then plans were put back on MIke Phillips desk
|
Routing - PLANNING Land Div | 8/16/2006 | | 9/5/2006 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS | 8/15/2006 | | 8/16/2006 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 8/15/2006 | | 8/15/2006 | | |
|
|
|
Routing to P.W.
|
Routing - FIRE | 8/10/2006 | | 8/15/2006 | | PASS |
|
|
|
Attached review comments to plans.
|
Routing - PLAN CHECK | 7/10/2006 | | 8/10/2006 | | |
|
|
|
Routing to fire.
|
Plan resubmittals received | | | 7/26/2006 | | |
|
|
|
Trout Architects inserted Sheets A1.1, A1.2, A1.3, A1.4, A1.5, A1.6 and plans taken back to Mike Phillips office
|
Plan resubmittals received | | | 7/19/2006 | | |
|
|
|
Received transmittal sheet, 2 copies of 5pg. response, 3 copies of 2pg. floor plans, 3 copies 3pg. hardware schedule, 3 copies 7pg. detail on Through-Penetration Firestop Systems, 3 addendums to structural calculations, 2 copies of the following pages: cover sheet, A0.1, A0.1A, A1.1, A1.2, A1.3, A1.4, A1.5, A1.7, A2.6, A3.1, A3.2, A3.3, A3.4, A3.5, A3.6, A4.1, A4.2, A4.3, A5.1, A7.1, A7.2, A8.1, A8.3, A8.5, A8.6, S-2.0, S-2.1, S-2.3, S-3.0, S-3.1, S-3.2, S-3.3, S-5.0, S-5.1, S-5.3, M1.2, M1.3, P1.2, P1.3; taken to Mike Phillips
|
Routing - PUBLIC WORKS | 7/7/2006 | | 7/10/2006 | | FAIL |
|
|
|
Contact Brian Murphy ###-####
|
Routing - PUBLIC WORKS | 5/16/2006 | | 5/18/2006 | | FAIL |
|
|
|
Revisions required: Contact Brian Murphy ###-####
|
Routing - PLAN CHECK | 3/2/2006 | | 5/16/2006 | | |
|
|
|
Routing to P.W.
|
1st review completed | | | 3/2/2006 | | FAIL |
|
|
|
Failed plan check, Fire
|
Routing - FIRE | 2/28/2006 | | 3/2/2006 | | FAIL |
|
|
|
Faxed Review comments to architect. Attached comments to plans.
|
Routing - PLAN CHECK | 2/6/2006 | | 2/28/2006 | | FAIL |
|
|
|
Plan review complete, sent correction report to the architect requesting additional information be submitted for further review prior to issuing permit.
|
Routing - PLANNING | 1/31/2006 | | 2/6/2006 | | PASS |
|
|
|
Approved per DRH05-00288
|
Routing Off Site - STRUCTURAL | 1/13/2006 | | 2/6/2006 | | FAIL |
|
|
|
Follow up review will be completed by city plan reviewer. Called PDQ for pick up
|
Routing - PLUMBING | 1/30/2006 | | 1/31/2006 | | PASS |
|
|
|
per plans and 2003 upc
|
Routing - Erosion and Sediment | 1/25/2006 | | 1/30/2006 | | PASS |
|
|
|
1/30/06 Reference ESC06-00025 as master ESC plan for project. RP must be identified before the permit is issued. adh.
|
Routing - PUBLIC WORKS | 1/20/2006 | | 1/25/2006 | | FAIL |
|
|
|
Failed by Brian Murphy - ###-####
Requires drainage plan revision.
|
Routing - PLANNING Land Div | 1/17/2006 | | 1/20/2006 | | FAIL |
|
|
|
Existing parcels must be combined into one one parcel. Applicant/Owner must provide documentation of new parcel number from the Ada County Assessors Office.
|
Plans ACCEPTED BY PLAN TECH | | | 1/17/2006 | | |
|
|
|
|
Plan routing begun/NEW & ADDTN | | | 1/17/2006 | | |
|
|
|
|
Application received | | | 1/13/2006 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 1/13/2006 | | |
|
|
|
|
Fee Review-notes | 1/13/2006 | 1/13/2006 | | | |
|
|
|
|