Third Notice BLD | 9/22/2008 | 9/22/2008 | 9/22/2008 | | DONE |
Cathy Brown
|
|
|
Second Notice has not been responded to.
|
Second Notice BLD | 8/11/2008 | 8/11/2008 | 9/22/2008 | | DONE |
Cathy Brown
|
|
|
First Notice has not been responded to.
|
(F) Reprint permit | | | 8/20/2008 | | DONE |
|
|
|
mike young - ###-#### - called and asked for copy of permit and inspections be faxed to him at ###-####
|
First Notice | | 5/20/2008 | 8/11/2008 | | DONE |
|
|
|
|
Code Occupancy Approval | | | 5/20/2008 | | PASS |
Wm. Michael Meloy
|
|
|
ok for perm occupancey per Andrea Tuning
|
Permanent Occupancy UNPAID FEE | | | 5/20/2008 | | DONE |
|
|
|
|
Temporary Occupancy UNPAID FEE | | | 3/20/2008 | | DONE |
|
|
|
|
BLD-Final | 3/17/2008 | 3/18/2008 | 3/18/2008 | A | PASS |
Dave Hannah
|
|
|
mel Phone #: ###-####
|
FIRE-Final Inspection | 3/14/2008 | 3/17/2008 | 3/17/2008 | A | PASS |
Forrest France
|
|
|
Items on correction notice are complete, door closures adjacent to the common corridor to be adjusted prior to structural final for verification, remainder of fire life safety inspection passed.
|
BLD-Final | 3/13/2008 | 3/13/2008 | 3/13/2008 | P | FAIL |
Forrest France
|
|
|
Need to repair ceiling adjacent to the smoke detector at the riser room, missing required lane marking at the fire dept. access road, incomplete address at one apartment unit, the project related fire sprinkler permit work has failed final inspection.
|
FIRE-Final Inspection | 3/12/2008 | 3/12/2008 | 3/12/2008 | P | NR |
Forrest France
|
|
|
Pending alarm and sprinkler finals.
|
FIRE-Final Inspection | 3/10/2008 | 3/10/2008 | 3/11/2008 | P | NR |
Forrest France
|
|
|
Need project related fire alarm and sprinkler permit finals prior to building fire life safety approval.
|
Case Summary (BLD) | | | 3/10/2008 | | |
|
|
|
|
BLD-Energy code compliance | 10/12/2007 | 10/12/2007 | 10/15/2007 | P | PASS |
Dave Hannah
|
|
|
harvey Phone #: ###-#### Note: please call 1/2 hr prior to inpsection ok to cover
|
BLD-Framing/Rough-in | 10/2/2007 | 10/3/2007 | 10/3/2007 | A | PART |
Dave Hannah
|
|
|
mel Phone #: ###-#### ok to insulate
|
Telephone call | | | 5/29/2007 | | DONE |
|
|
|
telcon from architet re location of knox box. Referred him to FD to order it and get instructins on location.
|
BLD-Framing/Rough-in | 4/25/2007 | 4/26/2007 | 4/26/2007 | A | PART |
Dave Hannah
|
|
|
ext shear ok to cover ext
|
BLD-Framing/Rough-in | 4/25/2007 | 4/25/2007 | 4/25/2007 | P | NR |
Dave Hannah
|
|
|
Mel; Phone #: ###-#### Internet Inspection Request from: Victoria Beall
|
BLD-Foundation | 3/28/2007 | 3/29/2007 | 3/29/2007 | A | PASS |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 3/28/2007 at 10:17:59 AM. Contact: ###-####. column pedestals for carports.
|
BLD-Footing | 3/15/2007 | 3/16/2007 | 3/16/2007 | P | PART |
Jim Sly
|
|
|
harvey; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles Footing pads at rear of bldg #3.....OK
|
Plan resubmittals received | | | 2/26/2007 | | |
|
|
|
Received 6 copies of sheets T1, GRD-1, GRD-2, GRD-3, DTL-1 and taken to
|
BLD-Foundation | 2/7/2007 | 2/8/2007 | 2/8/2007 | A | PASS |
Dave Hannah
|
|
|
Harvey ; Phone #: ###-#### Internet Inspection Request from: Darla Downs
|
BLD-Footing | 2/1/2007 | 2/2/2007 | 2/2/2007 | A | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 2/1/2007 at 11:14:38 AM. Contact: ###-####.
|
Inspection Record Card- Bld | | | 1/8/2007 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 1/3/2007 | | DONE |
|
|
|
|
Print Occupancy Form | | | 11/8/2006 | | DONE |
|
|
|
|
Telephone call | | | 11/8/2006 | | |
|
|
|
tlk to neil of trout arch that permit and fees are ready to be picked up but needs ACHD/RP/GC
|
Permit Ready to Issue | | | 11/8/2006 | | |
|
|
|
|
Routing - PLAN CHECK | 10/30/2006 | | 11/6/2006 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/6/2006 | | DONE |
|
|
|
|
Plan assigned to (M_P) | 1/13/2006 | | 11/6/2006 | | PASS |
|
|
|
11/6/2006 13:41:20 M_P - activity updated through activity BLDA022 from case BLD06-00076.
|
Routing Off Site - STRUCTURAL | 1/13/2006 | | 11/6/2006 | | FAIL |
|
|
|
Follow up review will be completed by city plan reviewer. Called PDQ for pick up
|
Plan resubmittals received | | | 10/30/2006 | | |
|
|
|
Received transmittal sheet and two copies of pages A3.4 & A8.7; taken to Mike Phillips
|
Routing - PLAN CHECK | 9/5/2006 | | 10/30/2006 | | FAIL |
|
|
|
Called architect and requested additional plans to be submitted to reflect: concrete decks that the can not be supported by wood framing and provide clearances around tubs in the single story units to meet accessibility issues. Additional review required prior to issuing permit.
|
Plan resubmittals received | | | 10/20/2006 | | |
|
|
|
Received plan review responce from trout Architects (1 copy 5 pages), 1 copy of Manufacturer's product cut sheets for best bath ( 2 pages), 1 copy of page 3 of Trus Joist info, received 2 copies of the following sheets--A0.1, A0.1a, A0.1b, A1.1, A1.2, A1.3, A1.4, A1.5, A1.6, A2.6, A3.1, A3.2, A3.3, A3.4, A3.5, A3.6, A4.1, A4.2, A4.3, A8.3, A8.4, A8.5, A8.6, A8.7, S-1.0, S-2.0, S-2.1, S-2.2, S-2.3, S-3.0, S-3.1, S-3.2, S-3.2, S-3.3-S-3.4, S-4.0, S-4.1, S-4.2, S-5.0, S-5.1, S-5.2, S-5.3, P2.1--all the sheets were inserted to the Issue & Office copy then plans were put back on MIke Phillips desk
|
Routing - PLANNING Land Div | 8/16/2006 | | 9/5/2006 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS | 8/15/2006 | | 8/16/2006 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 8/15/2006 | | 8/15/2006 | | |
|
|
|
Routing to P.W.
|
Routing - FIRE | 8/10/2006 | | 8/15/2006 | | PASS |
|
|
|
Attached review comments to plans.
|
Routing - PLAN CHECK | 7/10/2006 | | 8/10/2006 | | |
|
|
|
Routinf to fire.
|
Plan resubmittals received | | | 7/26/2006 | | |
|
|
|
Trout Architects inserted Sheets A1.1, A1.2, A1.3, A1.4, A1.5, A1.6 and plans taken back to Mike Phillips office
|
Plan resubmittals received | | | 7/19/2006 | | |
|
|
|
Received transmittal sheet, 2 copies of 5pg. response, 3 copies of 2pg. floor plans, 3 copies 3pg. hardware schedule, 3 copies 7pg. detail on Through-Penetration Firestop Systems, 3 addendums to structural calculations, 2 copies of the following pages: cover sheet, A0.1, A0.1A, A1.1, A1.2, A1.3, A1.4, A1.5, A1.7, A2.6, A3.1, A3.2, A3.3, A3.4, A3.5, A3.6, A4.1, A4.2, A4.3, A5.1, A7.1, A7.2, A8.1, A8.3, A8.5, A8.6, S-2.0, S-2.1, S-2.3, S-3.0, S-3.1, S-3.2, S-3.3, S-5.0, S-5.1, S-5.3, M1.2, M1.3, P1.2, P1.3; taken to Mike Phillips
|
Routing - PUBLIC WORKS | 7/7/2006 | | 7/10/2006 | | FAIL |
|
|
|
Contact Brian Murphy ###-####
|
Routing - PUBLIC WORKS | 5/16/2006 | | 5/18/2006 | | FAIL |
|
|
|
Revisions required: Contact Brian Murphy ###-####
|
Routing - PLAN CHECK | 3/2/2006 | | 5/16/2006 | | |
|
|
|
Routing to P.W.
|
1st review completed | | | 3/2/2006 | | FAIL |
|
|
|
Failed Plan Check and Fire.
|
Routing - FIRE | 2/28/2006 | | 3/2/2006 | | FAIL |
|
|
|
Faxed Review comments to architect. Attached comments to plans.
|
Routing - PLAN CHECK | 2/6/2006 | | 2/28/2006 | | FAIL |
|
|
|
Plan review complete, sent correction report to the architect requesting additional information be submitted for further review prior to issuing permit.
|
Routing - PLANNING | 1/31/2006 | | 2/6/2006 | | PASS |
|
|
|
Approved per DRH05-00288.
|
Routing - PLUMBING | 1/30/2006 | | 1/31/2006 | | PASS |
|
|
|
per plans and 2003 upc
|
Routing - Erosion and Sediment | 1/25/2006 | | 1/30/2006 | | PASS |
|
|
|
1/30/06 Reference ESC06-00025 as master ESC plan for project. RP must be identified before the permit is issued. adh.
|
Routing - PUBLIC WORKS | 1/20/2006 | | 1/25/2006 | | FAIL |
|
|
|
Failed by Brian Murphy - ###-####
Requires drainage plan revision.
|
Routing - PLANNING Land Div | 1/17/2006 | | 1/20/2006 | | FAIL |
|
|
|
Must combine existing parcels into one parcel. Applicant/Owner must provide proof of new parcel number from the Ada County Assessors Office.
|
Plans ACCEPTED BY PLAN TECH | | | 1/17/2006 | | |
|
|
|
|
Plan routing begun/NEW & ADDTN | | | 1/17/2006 | | |
|
|
|
|
Application received | | | 1/13/2006 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 1/13/2006 | | |
|
|
|
|
Fee Review-notes | 1/13/2006 | 1/13/2006 | | | |
|
|
|
|
Routing - PLANNING | 11/22/2006 | | | | |
|
|
|
|