PubWorks Occupancy Approval | 1/29/2008 | 1/29/2008 | 1/18/2008 | | DONE |
|
|
|
Project completed and occupied, final inspection 01/18/08 R. Rokovitz. No occupancy card signed.
|
Third Notice BLD | 3/21/2007 | 3/21/2007 | 4/5/2007 | | DONE |
|
|
|
Second Notice has not been responded to.
|
Fee Review-notes | 1/18/2006 | 1/18/2006 | 4/5/2007 | | DONE |
|
|
|
|
Second Notice BLD | 3/8/2007 | 3/8/2007 | 3/21/2007 | | DONE |
|
|
|
First Notice has not been responded to.
|
First Notice | 2/15/2007 | 2/15/2007 | 3/8/2007 | | DONE |
Jim Sly
|
|
|
|
FIRE-Final Inspection | 2/15/2007 | 2/16/2007 | 2/16/2007 | A | PASS |
Troy Cobbley
|
|
|
life safety finaled
|
FIRE-Final Inspection | 2/14/2007 | 2/15/2007 | 2/16/2007 | P | PASS |
Troy Cobbley
|
|
|
life safety finaled
|
BLD-Final | 2/14/2007 | 2/15/2007 | 2/15/2007 | P | PASS |
Jim Sly
|
|
|
dana ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith C/C issued
|
DOC - Permit Finaled | 2/15/2007 | 2/15/2007 | 2/15/2007 | P | PASS |
Jim Sly
|
|
|
|
Code Occupancy Approval | 2/14/2007 | 2/14/2007 | 2/14/2007 | P | PASS |
Carol Montgomery
|
|
|
PASS
|
BLD-Framing/Rough-in | 11/30/2006 | 12/1/2006 | 12/1/2006 | A | PASS |
Jim Sly
|
|
|
danna; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
FIRE-Conference | 11/27/2006 | 11/27/2006 | 11/27/2006 | P | DONE |
Troy Cobbley
|
|
|
I went to the job site and went over the fire lane requirements with the contractors of both buildings. It appears the two separate parking lots are not connected as they were shown on the approved plans. I refered them to Scott. I was contacted by Scott later in the day and he stated that after meeting them and going over the plans that the way the parking lots are installed will be satifactory for fire department access.
|
BLD-Framing/Rough-in | 9/13/2006 | 9/14/2006 | 9/14/2006 | A | PART |
Jim Sly
|
|
|
dana - sheer insp; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley Shear OK
|
BLD-Foundation | 6/8/2006 | 6/12/2006 | 6/12/2006 | A | PASS |
Jim Sly
|
|
|
jed; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
BLD-Footing | 6/6/2006 | 6/7/2006 | 6/7/2006 | A | PASS |
Jim Sly
|
|
|
jed ; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley 2500 psi design
|
BLD-Conference | 6/1/2006 | 6/2/2006 | 6/2/2006 | A | NR |
Jim Sly
|
|
|
Phone #: ###-####
|
(F) Reprint permit | | | 5/26/2006 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 5/25/2006 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/31/2006 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 3/31/2006 | | |
|
|
|
|
Permit Ready to Issue | | | 3/31/2006 | | DONE |
|
|
|
|
Telephone call | | | 3/31/2006 | | DONE |
|
|
|
called ###-#### and left voicemessage for Shawn that permit is ready and fee and need ACHD
|
Plan assigned to (MLO) | 1/19/2006 | | 3/31/2006 | | PASS |
|
|
|
3/31/2006 10:42:59 MLO - activity updated through activity BLDA022 from case BLD06-00102.
|
Routing - PLANNING | 3/28/2006 | | 3/28/2006 | | PASS |
|
|
|
Approved per DRH05-00283.
|
Routing - PLUMBING | 3/23/2006 | | 3/27/2006 | | PASS |
|
|
|
FOR SHELL ONLY
|
Routing - PLAN CHECK | 3/23/2006 | | 3/23/2006 | | PASS |
|
|
|
SHELL ONLY
|
Plan resubmittals received | | | 3/22/2006 | | DONE |
|
|
|
Received letter from engineer Shawn Reeder requesting that plans be used for shell only and separate plans will be provided for T.I. BLD06-00104.
|
Routing - PLAN CHECK | 3/6/2006 | | 3/8/2006 | | PEND |
|
|
|
Phone conversation with architect to clear up construction type for the building which was not correct as resubmitted. Now VB. These plans cannot be approved until the T.I. permit BLD06-00104 has been satisfied for all work for both permits is on a single set of plans as submitted. MLO
|
Plan resubmittals received | | | 3/6/2006 | | DONE |
|
|
|
Resubs for the shell were submitted under the wrong permit for the T.I. Plans only address some of the shell comments and none of the T.I. comments. MLO
|
1st review completed | | | 2/7/2006 | | FAIL |
|
|
|
Failed Planning, Plumbing and Plan Check.
|
Routing - PLAN CHECK | 2/7/2006 | | 2/7/2006 | | PEND |
|
|
|
|
Routing - FIRE | 2/6/2006 | | 2/7/2006 | | PASS |
|
|
|
Faxed comments to architect. Attached comments to plans.
|
Routing - PLAN CHECK | 2/1/2006 | | 2/3/2006 | | FAIL |
|
|
|
corrections sent to architect
|
Plan resubmittals requested | | | 2/3/2006 | | DONE |
|
|
|
IBC corrections for shell only
|
Routing - PLANNING | 1/27/2006 | | 1/31/2006 | | FAIL |
|
|
|
Marty S.
|
Routing - PLUMBING | 1/26/2006 | | 1/27/2006 | | FAIL |
|
|
|
verify if medical gas required or not.
|
Routing - Erosion and Sediment | 1/26/2006 | | 1/26/2006 | | PASS |
|
|
|
ESC plan approved with attached conditions.
|
Routing - PUBLIC WORKS | 1/20/2006 | | 1/26/2006 | | PASS |
|
|
|
|
Plan resubmittals received | | | 1/25/2006 | | DONE |
|
|
|
Received 3 copys of 81/2 x11 SD2 sheets & 3 copys of full SD2 sheets taken to Mike O.
|
Routing - PLANNING Land Div | 1/19/2006 | | 1/20/2006 | | PASS |
|
|
|
property is a platted lot.
|
Pending Assignment by MYS | 1/18/2006 | | 1/19/2006 | | DONE |
|
|
|
1/19/2006 09:00:06 JCM - activity updated through activity BLDA174 from case BLD06-00102.
|
Recd Pcfee & Taken To Pln CK | | | 1/18/2006 | | |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 1/18/2006 | | |
|
|
|
|
Plan routing begun/NEW & ADDTN | | | 1/18/2006 | | |
|
|
|
|
Application received | | | 1/18/2006 | | |
|
|
|
|