Permit Information
Permit NumberBLD06-00103
StatusFinaled
Name MCCARTER-MOORHOUSE CO INC
Site Address 13900 W WAINWRIGHT DR
Project NameALPINE POINTE OFFICE BLDG
Customer Number 
ePlanReviewNo
Description
(MIKE WILLIAMS)(ALPINE POINTE OFFICE BLDG) To construct and finish a 3,811 sq.ft. area within an existing 8,274 sq. ft. Shell & Core building for use as an office, all per approved plans, to include red-lined notes on plans and all attached plan review conditions of all reviewing agencies. Work includes construction of interior walls, doors and finishes to create private offices, reception, lobby, kitchen/break and support areas; to tie new walls into existing sheetrock ceiling; add electrical, plumbing & mechanical to meet tenant needs and comply with current adopted codes and ordinances. drs
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  6/11/2008 DONE
Case Summary (BLD)  2/16/2007 DONE
Third Notice BLD1/8/20071/8/20072/6/2007 DONE
Second Notice has not been responded to.
Fee Review-notes1/18/20061/18/20062/6/2007 DONE
Second Notice BLD12/27/200612/27/20061/8/2007 DONE
First Notice has not been responded to.
First Notice 9/28/200612/27/2006 DONE
BLD-Final9/18/20069/19/20069/19/2006APASS
DetailsJim Sly
dana; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
OK for Perm Occ. :)
Permanent Occupancy 9/19/20069/19/2006 DONE
Details
(F) Reprint permit  9/19/2006  
Permanent occupancy UNPAID FEE  9/19/2006 DONE
Perm. Occ. Cert. # 11215 issued 9-19-06 to Williams Chiropractic.
FIRE-Final Inspection9/15/20069/18/20069/18/2006APASS
DetailsTroy Cobbley
Life safety finaled
Print Occupancy Form  9/12/2006  
BLD-Energy code compliance6/22/20066/23/20066/23/2006APASS
DetailsJim Sly
dana - suite 100; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley
BLD-Framing/Rough-in6/16/20066/19/20066/19/2006PPASS
DetailsJim Sly
john; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
Issue PAID IN FULL permit  5/5/2006 DONE
Routing - PLAN CHECK3/10/2006 4/14/2006 PASS
Inserted plan sheet resubmittals into plans and red-lined clarifications on both sets of plans. Routing to permit desk to issue permit.
Plan assigned to (DRS)1/26/2006 4/14/2006 PASS
4/14/2006 08:58:46 DRS - activity updated through activity BLDA022 from case BLD06-00103.
PLANS/APPL TAKEN TO FRONT DESK  4/14/2006 PASS
Print Occupancy Form  4/14/2006  
Permit Ready to Issue  4/14/2006 DONE
Telephone call  4/14/2006 DONE
called ###-#### and told Vicki that permit is ready and fees
Plan resubmittals received  4/13/2006  
Received 2 copies of Response letter from architect, E2.0S, A-1, A-2 and taken to Dan Stuart
Routing - PLAN CHECK2/7/2006 3/10/2006 FAIL
Inserted plan resubmittals into original sets & reviewed. Sheet A-1 had wrong elevations for accessibility at sink called out and no elevations were provided as required. The floor plan has been modified from shell & core layout for third restrooms. New shower shown and required floor sink removed. Sheet A2 - restroom dimension to narrow with new shower for 60" clear at toilet, need shower detail & elevation showing accessibility compliance, hardware schedule needs clarified for door #6, 5, 7, 17, & 24. Sheet E2.0L needs exit signs modified based on new exit system layout and walls / doors removed from original plans.
Plan resubmittals requested  3/10/2006 DONE
Reviewed with Dan Schwalbee, architect, by phone with him red-lining his plans for notes of required resubmittals. Will correct and resubmit Sheets A1.0 (elevations of counters) & A2.0 (door hardware/restroom width/accessible shower detail W seat/service sink)
Telephone call  3/10/2006 DONE
Called Daniel Schwalbe to review plans last submitted that still require corrections. He marked his plans and will resubmit new sheets A1 & A2.
Plan resubmittals received  3/6/2006  
Received 1 copy of Response to plan review letter from Architect, 1 copy of response letter from ECO, 2 copies of the following- A-0, A-1, A-2, E0.0, E1.0, E2.0L, E2.0P, E2.0S, E3.0, E3.1, E3.2, E3.3 and taken to Dan S
Routing - PLAN CHECK1/30/2006 2/7/2006 FAIL
Faxed and e-mailed copy of plan review corrections to structural engineer, Daniel Schwalbe. routing to fire code analyst for review.
Routing - FIRE2/7/2006 2/7/2006 PASS
Attached comments to plans.
Plan resubmittals requested  2/7/2006 DONE
Copies of plan review items needing correction e-mailed and faxed to structural engineer, Daniel Schwalbe.
1st review completed  2/7/2006 FAIL
Failed Plan Check.
Routing - PUBLIC WORKS1/26/2006 1/30/2006 PASS
Plans ACCEPTED BY PLAN TECH  1/19/2006  
Application received  1/18/2006  
Recd Pcfee & Taken To Pln CK  1/18/2006 DONE