Case Summary (BLD) | | | 6/11/2008 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 2/16/2007 | | DONE |
|
|
|
|
Third Notice BLD | 1/8/2007 | 1/8/2007 | 2/6/2007 | | DONE |
|
|
|
Second Notice has not been responded to.
|
Fee Review-notes | 1/18/2006 | 1/18/2006 | 2/6/2007 | | DONE |
|
|
|
|
Second Notice BLD | 12/27/2006 | 12/27/2006 | 1/8/2007 | | DONE |
|
|
|
First Notice has not been responded to.
|
First Notice | | 9/28/2006 | 12/27/2006 | | DONE |
|
|
|
|
BLD-Final | 9/18/2006 | 9/19/2006 | 9/19/2006 | A | PASS |
Jim Sly
|
|
|
dana; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles OK for Perm Occ. :)
|
Permanent Occupancy | | 9/19/2006 | 9/19/2006 | | DONE |
|
|
|
|
(F) Reprint permit | | | 9/19/2006 | | |
|
|
|
|
Permanent occupancy UNPAID FEE | | | 9/19/2006 | | DONE |
|
|
|
Perm. Occ. Cert. # 11215 issued 9-19-06 to Williams Chiropractic.
|
FIRE-Final Inspection | 9/15/2006 | 9/18/2006 | 9/18/2006 | A | PASS |
Troy Cobbley
|
|
|
Life safety finaled
|
Print Occupancy Form | | | 9/12/2006 | | |
|
|
|
|
BLD-Energy code compliance | 6/22/2006 | 6/23/2006 | 6/23/2006 | A | PASS |
Jim Sly
|
|
|
dana - suite 100; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley
|
BLD-Framing/Rough-in | 6/16/2006 | 6/19/2006 | 6/19/2006 | P | PASS |
Jim Sly
|
|
|
john; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
Issue PAID IN FULL permit | | | 5/5/2006 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 3/10/2006 | | 4/14/2006 | | PASS |
|
|
|
Inserted plan sheet resubmittals into plans and red-lined clarifications on both sets of plans. Routing to permit desk to issue permit.
|
Plan assigned to (DRS) | 1/26/2006 | | 4/14/2006 | | PASS |
|
|
|
4/14/2006 08:58:46 DRS - activity updated through activity BLDA022 from case BLD06-00103.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/14/2006 | | PASS |
|
|
|
|
Print Occupancy Form | | | 4/14/2006 | | |
|
|
|
|
Permit Ready to Issue | | | 4/14/2006 | | DONE |
|
|
|
|
Telephone call | | | 4/14/2006 | | DONE |
|
|
|
called ###-#### and told Vicki that permit is ready and fees
|
Plan resubmittals received | | | 4/13/2006 | | |
|
|
|
Received 2 copies of Response letter from architect, E2.0S, A-1, A-2 and taken to Dan Stuart
|
Routing - PLAN CHECK | 2/7/2006 | | 3/10/2006 | | FAIL |
|
|
|
Inserted plan resubmittals into original sets & reviewed. Sheet A-1 had wrong elevations for accessibility at sink called out and no elevations were provided as required. The floor plan has been modified from shell & core layout for third restrooms. New shower shown and required floor sink removed. Sheet A2 - restroom dimension to narrow with new shower for 60" clear at toilet, need shower detail & elevation showing accessibility compliance, hardware schedule needs clarified for door #6, 5, 7, 17, & 24. Sheet E2.0L needs exit signs modified based on new exit system layout and walls / doors removed from original plans.
|
Plan resubmittals requested | | | 3/10/2006 | | DONE |
|
|
|
Reviewed with Dan Schwalbee, architect, by phone with him red-lining his plans for notes of required resubmittals. Will correct and resubmit Sheets A1.0 (elevations of counters) & A2.0 (door hardware/restroom width/accessible shower detail W seat/service sink)
|
Telephone call | | | 3/10/2006 | | DONE |
|
|
|
Called Daniel Schwalbe to review plans last submitted that still require corrections. He marked his plans and will resubmit new sheets A1 & A2.
|
Plan resubmittals received | | | 3/6/2006 | | |
|
|
|
Received 1 copy of Response to plan review letter from Architect, 1 copy of response letter from ECO, 2 copies of the following- A-0, A-1, A-2, E0.0, E1.0, E2.0L, E2.0P, E2.0S, E3.0, E3.1, E3.2, E3.3 and taken to Dan S
|
Routing - PLAN CHECK | 1/30/2006 | | 2/7/2006 | | FAIL |
|
|
|
Faxed and e-mailed copy of plan review corrections to structural engineer, Daniel Schwalbe. routing to fire code analyst for review.
|
Routing - FIRE | 2/7/2006 | | 2/7/2006 | | PASS |
|
|
|
Attached comments to plans.
|
Plan resubmittals requested | | | 2/7/2006 | | DONE |
|
|
|
Copies of plan review items needing correction e-mailed and faxed to structural engineer, Daniel Schwalbe.
|
1st review completed | | | 2/7/2006 | | FAIL |
|
|
|
Failed Plan Check.
|
Routing - PUBLIC WORKS | 1/26/2006 | | 1/30/2006 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 1/19/2006 | | |
|
|
|
|
Application received | | | 1/18/2006 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 1/18/2006 | | DONE |
|
|
|
|