Third Notice BLD | 3/5/2008 | 3/5/2008 | 9/29/2008 | | DONE |
Cathy Brown
|
|
|
Second Notice has not been responded to.
|
Second Notice BLD | 1/9/2008 | 1/9/2008 | 3/5/2008 | | DONE |
Cathy Brown
|
|
|
First Notice has not been responded to.
|
First Notice | 12/21/2007 | 12/21/2007 | 1/9/2008 | | DONE |
Mike Jordan
|
|
|
|
BLD-Final | 12/21/2007 | 12/21/2007 | 12/21/2007 | P | PASS |
Mike Jordan
|
|
|
|
DOC - Permit Finaled | 12/21/2007 | 12/21/2007 | 12/21/2007 | P | PASS |
Mike Jordan
|
|
|
Attic access in canopy area provided. Letter of compliance issued.
|
BLD-Final | 11/8/2007 | 11/9/2007 | 11/9/2007 | A | PART |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 11/8/2007 at 3:06:32 PM. Contact: ###-####. Needs to provide attic access at front canopy area, everything else ok. Will issue letter of compliance once attic access has been provided.
|
Code Occupancy Approval | 11/9/2007 | 11/9/2007 | 11/9/2007 | P | PASS |
Scott M.Brown
|
|
|
OK FOR FINAL
|
BLD-Final | 11/8/2007 | 11/8/2007 | 11/8/2007 | P | NR |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 11/8/2007 at 10:58:59 AM. Contact: ###-####.
|
FIRE-Final Inspection | 11/7/2007 | 11/7/2007 | 11/7/2007 | P | PASS |
Troy Cobbley
|
|
|
life safety passed
|
PubWorks Occupancy Approval | 11/1/2007 | 11/1/2007 | 11/1/2007 | | DONE |
|
|
|
|
FIRE-Final Inspection | 10/30/2007 | 10/30/2007 | 10/30/2007 | A | FAIL |
Troy Cobbley
|
|
|
Provide the city approved comments for both the shell adn tenant improvement, provide approved hardware on the exterior doors other than the main exit as discussed, provide approved hardware on the office doors, finish the installation of the remote annunciator and test the duct smoke detectors, provide address as discussed. I told the builder there may be other items that are addressed on the city comments.
|
Code Occupancy Approval Temp | 10/29/2007 | 10/29/2007 | 10/29/2007 | P | FAIL |
Scott M.Brown
|
|
|
FAILED LANDSCAPE NOT CLOSE TO PLANS, NEED TO RESUBMIT/REPLACE AS SHOWN ON PLANS. BOND FOR LANDSCAPE IF OCCUPANCY NEEDED
|
BLD-Conference | 10/11/2007 | 10/12/2007 | 10/12/2007 | A | DONE |
Jim Sly
|
|
|
blake Phone #: ###-#### Told Blake that he needs Public Works and Zoning to final.....B 4 calling for Structural final (for shell).
|
BLD-Framing/Rough-in | 3/16/2007 | 3/19/2007 | 3/19/2007 | A | PASS |
Mike Jordan
|
|
|
John; Phone #: ###-#### Internet Inspection Request from: Stacie Backus. Straps on roof have been insatalled. ok to cover.
|
BLD-Framing/Rough-in | 3/8/2007 | 3/9/2007 | 3/9/2007 | P | PART |
Mike Jordan
|
|
|
john; Phone #: ###-#### Internet Inspection Request from: Victoria Beall. Needs to add straps on roof.
|
BLD-Foundation | 11/3/2006 | 11/3/2006 | 11/3/2006 | P | CANC |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 11/3/2006 at 8:53:56 AM. Contact: ###-####.
|
BLD-Foundation | 11/2/2006 | 11/2/2006 | 11/2/2006 | P | PASS |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 11/2/2006 at 10:31:05 AM. Contact: ###-####. Perimeter stemwalls.
|
BLD-Footing | 10/31/2006 | 10/31/2006 | 10/31/2006 | P | PART |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 10/31/2006 at 8:50:21 AM. Contact: ###-####. wip. perimeter, all verts not yet tied. No special insp. required as per project start up sheet. Noted to contractor that conc. must be mech. vibrated.
|
(F) Reprint permit | | | 10/25/2006 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 10/24/2006 | | |
|
|
|
|
Ready Permit EXTENDED | | | 10/11/2006 | | DONE |
|
|
|
see scanned document from jenifer g.
|
Ready Permit EXTENDED | | | 10/11/2006 | | |
|
|
|
|
Telephone call | | | 9/19/2006 | | DONE |
|
|
|
talked to zion zimmerman at ###-#### reason permit has not been picked up is had issues with p & z on the design review and waiting on achd-
|
Inspection Record Card- Bld | | | 8/10/2006 | | DONE |
|
|
|
|
Telephone call | | | 8/10/2006 | | DONE |
|
|
|
tlk to dion Zimmerman ###-#### that permit and fees are ready to be picked up but needs GC/RCE # and ACHD
|
Permit Ready to Issue | | | 8/10/2006 | | DONE |
|
|
|
|
Plan assigned to (JCM) | 1/26/2006 | | 8/9/2006 | | PASS |
|
|
|
8/9/2006 16:29:40 JCM - activity updated through activity BLDA022 from case BLD06-00152.
|
Routing - PLAN CHECK | 8/3/2006 | | 8/9/2006 | | |
|
|
|
|
Plan resubmittals received | | | 8/9/2006 | | |
|
|
|
Received 1pg. letter to John Menard from David Everson w/GJZ Architects and 2 copies of pages SD-1.0 & L-1.0; taken to John Menard
|
Routing - PLANNING | 8/9/2006 | | 8/9/2006 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 8/9/2006 | | 8/9/2006 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/9/2006 | | DONE |
|
|
|
|
Routing - PLANNING | 8/1/2006 | | 8/3/2006 | | FAIL |
|
|
|
Applicant has not submitted revised plans to DR for approval.
See attached letter to Dion Zimmerman
|
Routing Off Site - STRUCTURAL | 7/28/2006 | | 8/1/2006 | | PASS |
|
|
|
//C @ alled Action Courier for pick up :pm BAS - Received a faxed letter from the consulting structural engieer approving the final structural revisions. JCM
|
Routing - PLAN CHECK | 7/5/2006 | | 8/1/2006 | | |
|
|
|
|
Plan resubmittals received | | | 7/28/2006 | | |
|
|
|
Received 1 copy of cover letter, 1 copy of a letter from Holladay Engineering, 3 copies of A-3.0, A-3.1, A-3.2 and taken to John Menard
|
Plan resubmittals requested | | | 7/24/2006 | | DONE |
|
|
|
FAxed the architect a copy of the review letter from the consulting structural engineer. JCM
|
Routing Off Site - STRUCTURAL | 7/17/2006 | | 7/24/2006 | | FAIL |
|
|
|
Faxed the consulting structural engineer the final response to structural comments. JCM
|
Plan resubmittals received | | | 7/14/2006 | | |
|
|
|
Received comment items from the design structural engineer.
|
Plan resubmittals requested | | | 7/6/2006 | | DONE |
|
|
|
Faxed the architect a copy of the comment list from the consulting structural engineer requesting additioanl revisions. JCM
|
Routing Off Site - STRUCTURAL | 6/26/2006 | | 7/6/2006 | | FAIL |
|
|
|
Called Action Couriers for pick up - Received a faxed letter from the consulting structural engineer requesting additional revisions. JCM
|
Routing - FIRE | 6/30/2006 | | 7/5/2006 | | PASS |
|
|
|
Attached review comments to plans.
|
Routing - PLANNING | 6/29/2006 | | 6/30/2006 | | FAIL |
|
|
|
Applicant has not submitted revised plans to DR for approval.
See attached letter to Dion Zimmerman
|
Routing - Erosion and Sediment | 6/28/2006 | | 6/29/2006 | | PASS |
|
|
|
ESC plan approved with attached conditions.
|
Plan resubmittals received | | | 6/28/2006 | | |
|
|
|
received "3" sets of plans including 3 sheets of C-1.0, & C-2.0, also including an erosion app with 2 copies of storm water pollution prevention plans & 2 sets of erosion plans from stanley construction inc-& transmittal sheet from stanley consultants -plans taken to john menard.
|
Plan Reviewer's activity | | | 6/28/2006 | | PASS |
|
|
|
Reviewed and approved nonstructural resubmitted plans. JCM
|
Plan resubmittals received | | | 6/21/2006 | | |
|
|
|
Recieved 3 pg. response to comments, 3 copies of 3pg. "Project Start Up for Special Inspections", 3 copies of 4pg. structural calcs, 3 copies of the following pages: G-1.0, SD-1.0, L-1.0, S-1.0, S-2.0, S-2.1, A-3.0, A-3.1, A-3.2; taken to John Menard.
|
Routing - PLAN CHECK | 2/21/2006 | | 2/28/2006 | | PASS |
|
|
|
|
1st review completed | | | 2/21/2006 | | FAIL |
|
|
|
Failed Planning, Plan Check.
|
Routing - FIRE | 2/16/2006 | | 2/21/2006 | | PASS |
|
|
|
Attached review comments to plans. Faxed comments to architect.
|
Plan resubmittals requested | | | 2/16/2006 | | DONE |
|
|
|
E-mailed the architect a copy of the plan review comment list requesting revisions. JCM
|
Routing - PLAN CHECK | 2/7/2006 | | 2/16/2006 | | FAIL |
|
|
|
|
Plan resubmittals requested | | | 2/10/2006 | | DONE |
|
|
|
Faxed the architect a copy of the comment list from the consulting structural engineer requesting revisions. JCM
|
Routing Off Site - STRUCTURAL | 1/26/2006 | | 2/8/2006 | | FAIL |
|
|
|
Called Action Couriers for pick up - Received faxed comment list from the consulting structural engineer requesting revisions. JCM
|
Routing - PLANNING | 2/6/2006 | | 2/7/2006 | | FAIL |
|
|
|
DRH05-00208 approved the building to be located on the south side of Candleston Court. The applicant has not received Design Review approval for the proposed building. 2/7/06 SMS
Called Dion Zimmerman to let him know.
|
Routing - PLUMBING | 2/3/2006 | | 2/6/2006 | | PASS |
|
|
|
per plans and 2003 upc
|
Routing - Erosion and Sediment | 2/1/2006 | | 2/3/2006 | | FAIL |
|
|
|
ESC plan does not cover scope of work for structures: The esc submitted plan covers the development, utilities not structures. Informed applicant. Construction schedule is outdated.
|
Routing - PUBLIC WORKS | 1/31/2006 | | 2/1/2006 | | PASS |
|
|
|
|
Routing - PLANNING Land Div | 1/25/2006 | | 1/31/2006 | | PASS |
|
|
|
Property located in the Newcastle Heights Sub.
|
Plans ACCEPTED BY PLAN TECH | | | 1/25/2006 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 1/23/2006 | | |
|
|
|
|
Fee Review-notes | 1/23/2006 | 1/23/2006 | | | |
|
|
|
|