Fee Review-notes | 1/24/2006 | 1/24/2006 | 3/23/2007 | | DONE |
|
|
|
|
Third Notice BLD | 2/22/2007 | 2/22/2007 | 3/22/2007 | | DONE |
|
|
|
Second Notice has not been responded to.
|
Telephone call | | | 3/22/2007 | | DONE |
|
|
|
call to Wedge plm and left msg for them to call re: FV different from GC FV.
|
Second Notice BLD | 2/7/2007 | 2/7/2007 | 2/22/2007 | | DONE |
|
|
|
First Notice has not been responded to.
|
First Notice | 1/25/2007 | 1/25/2007 | 2/7/2007 | | DONE |
Mike Jordan
|
|
|
|
BLD-Final | 1/24/2007 | 1/25/2007 | 1/25/2007 | A | PASS |
Mike Jordan
|
|
|
jeff; Phone #: ###-#### Internet Inspection Request from: Victoria Beall
|
DOC - Permit Finaled | 1/25/2007 | 1/25/2007 | 1/25/2007 | P | PASS |
Mike Jordan
|
|
|
UL approved 1 hr attic access installed. Letter of compliance issued for shell and core. Bonded for landscape and public works.
|
BLD-Final | 12/27/2006 | 12/28/2006 | 12/28/2006 | A | PART |
Mike Jordan
|
|
|
jeff ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith. Ok for temp occ on shell. Needs to install 1hr rated UL listed attic access.
|
Print Occupancy Form | | | 12/28/2006 | | DONE |
|
|
|
|
Temporary occupancy | | | 12/28/2006 | | DONE |
|
|
|
Temp. Occ. Cert. # 5500 issued 12-28-06 to the Southwind Business Park.
|
BLD-Final | 12/26/2006 | 12/27/2006 | 12/27/2006 | P | FAIL |
Mike Jordan
|
|
|
jeff ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith. Radiation damper required at fresh air duct at penetration at 1hr ceiling assembly. Provide UL listed 1hr attic access. Remove sheet metal patch at 1hr ceiling assembly . Must attach back to framing member.
|
FIRE-Final Inspection | 12/26/2006 | 12/27/2006 | 12/27/2006 | A | PASS |
Troy Cobbley
|
|
|
life safety finaled
|
FIRE-Final Inspection | 12/22/2006 | 12/26/2006 | 12/26/2006 | A | PASS |
Forrest France
|
|
|
Items on previous c/n are complete, shell life safety is acceptable.
|
FIRE-Final Inspection | 12/22/2006 | 12/22/2006 | 12/22/2006 | P | CANC |
Troy Cobbley
|
|
|
Per Jeff he wants to reschedule for next week.
|
Code Occupancy Approval Temp | | | 12/21/2006 | | DONE |
|
|
|
I WILL SIGN TEMPORARY WHEN BOND POSTED FOR $79278.66
|
FIRE-Final Inspection | 12/12/2006 | 12/12/2006 | 12/12/2006 | P | FAIL |
Troy Cobbley
|
|
|
Provide pavement, provide fire lane signage per sheet A1-1a, provide sticker at the main exit, provide remote annunciator and test the duct smoke detector and provide the fire dept. review comments for other possible requirements.
|
BLD-Conference | 12/11/2006 | 12/12/2006 | 12/12/2006 | A | DONE |
Mike Jordan
|
|
|
jeff; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
BLD-Framing/Rough-in | 11/2/2006 | 11/2/2006 | 11/2/2006 | P | NR |
Mike Jordan
|
|
|
jeff ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith
|
BLD-Framing/Rough-in | 11/1/2006 | 11/1/2006 | 11/1/2006 | P | FAIL |
Mike Jordan
|
|
|
jeff; Phone #: ###-#### Internet Inspection Request from: Patricia Smith. Needs to box out elec panel box.
|
BLD-Framing/Rough-in | 10/27/2006 | 10/30/2006 | 10/30/2006 | A | NR |
Mike Jordan
|
|
|
kameron; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles. Needs to pull elec. permit for shell and get ri insp.
|
BLD-Aging Inspection | 10/4/2006 | 10/4/2006 | 10/4/2006 | | PASS |
Mike Jordan
|
|
|
wip
|
BLD-Framing/Rough-in | 7/19/2006 | 7/20/2006 | 7/20/2006 | P | PART |
Mike Jordan
|
|
|
cameron sheer nailing; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley. Roof nailing and hardware ok. Shear nailing on exterior perimeter walls ok. Simpson holddown straps were not installed. c/n posted. ok to cover roof.
|
BLD-Other | 7/5/2006 | 7/6/2006 | 7/6/2006 | A | PART |
Mike Jordan
|
|
|
MARK nOTE: SHEET WALL AND NAILING ; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles. 1hour seperation wall innner layer nailing pattern.
|
BLD-Footing | 6/5/2006 | 6/6/2006 | 6/6/2006 | A | PASS |
Mike Jordan
|
|
|
ed - reinsp; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley. peremeter footings. no special insp. is required.
|
BLD-Footing | 6/2/2006 | 6/5/2006 | 6/5/2006 | A | PART |
Mike Jordan
|
|
|
Phone #: ###-#### Internet Inspection Request from: Cathy Chiles. perimeter footings. Cpntractor to confirm special insp.
|
(F) Reprint permit | | | 5/26/2006 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 5/25/2006 | | DONE |
|
|
|
|
CHANGE STATUS TO (RDY) | | | 5/22/2006 | | DONE |
|
|
|
|
Telephone call | | | 5/22/2006 | | DONE |
|
|
|
called Jerry Teal permit ready to pick up and fee given
|
Plan assigned to (JCM) | 5/10/2006 | 5/10/2006 | 5/19/2006 | | PASS |
|
|
|
5/19/2006 12:41:24 JCM - activity updated through activity BLDA022 from case BLD06-00169.
|
Plan Reviewer's activity | | | 5/19/2006 | | PASS |
|
|
|
After the plans were approved, but before the permit was issued, the applicant revised the plans to change the floor system from crawl space to slab on grade. Plan changes approved as submitted. JCM
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/19/2006 | | DONE |
|
|
|
|
Plan resubmittals received | | | 5/10/2006 | | DONE |
|
|
|
Received 1 transmittal & 3 copys of sheets A2-2,A2-4,A4-1,A4-2,A7-1,A7-2 taken to John M.
|
Telephone call | | | 3/16/2006 | | |
|
|
|
Left message with David (for Jerry Teal) ###-#### to pick up permit and to provide ACHD 3-16-06 eus
|
Permit Ready to Issue | | | 3/16/2006 | | |
|
|
|
|
Plan Reviewer's activity | | | 3/15/2006 | | PASS |
|
|
|
Reviewed and approved resubmittals. JCM
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/15/2006 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 3/15/2006 | | |
|
|
|
|
Plan assigned to (JCM) | 1/26/2006 | | 3/15/2006 | | PASS |
|
|
|
3/15/2006 09:47:48 JCM - activity updated through activity BLDA022 from case BLD06-00169.
|
Routing - PLAN CHECK | 2/27/2006 | | 3/15/2006 | | PASS |
|
|
|
|
Plan resubmittals received | | | 3/8/2006 | | |
|
|
|
Received 1 plan review comment letter, 1 Fire plan reveiw letter, 1 copy of structural calcs, 4 copies of A0-1, 4 copies of A1-1a, 4 copies of A2-1, 4 copies of A2-2, 4 copies of A2-3, 4 copies of A4-1 and taken to John M.
|
1st review completed | | | 2/27/2006 | | FAIL |
|
|
|
Failed Plan Check.
|
Routing - FIRE | 2/22/2006 | | 2/27/2006 | | PASS |
|
|
|
Attached comments to plans. Faxed review comments to architect.
|
Routing - PLAN CHECK | 2/10/2006 | | 2/22/2006 | | FAIL |
|
|
|
John Menard
|
Plan resubmittals requested | | | 2/22/2006 | | DONE |
|
|
|
E-mailed the architect a copy of the plan review requesting revisions. JCM
|
Routing - PLANNING | 2/6/2006 | | 2/10/2006 | | PASS |
|
|
|
Approved.
|
Routing - Erosion and Sediment | 2/6/2006 | | 2/6/2006 | | PASS |
|
|
|
ESC plan approved with attached conditions. Reference ESC05-00837 as master ESC plan for project.adh.
|
Routing - PUBLIC WORKS | 1/31/2006 | | 2/6/2006 | | PASS |
|
|
|
|
Routing - PLUMBING | 2/6/2006 | | 2/6/2006 | | PASS |
|
|
|
per plans and 2003 upc
|
Routing - PLANNING Land Div | 1/26/2006 | | 1/31/2006 | | PASS |
|
|
|
Property is a platted lot in Spoke Ranch Sub. #2.
|
Plan routing begun/NEW & ADDTN | | | 1/26/2006 | | |
|
|
|
|
Application received | | | 1/24/2006 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 1/24/2006 | | |
|
|
|
|