Information based on query as of Saturday, June 29, 2024.
Permit Information
Permit NumberBLD06-00169
StatusFinaled
Name JAYO CONSTRUCTION
Site Address 10588 W BUSINESSPARK LN
Project NameSouthwind Business Park-Bldg E
Customer Number 
ePlanReviewNo
Description
Southwind Business Park - Building #E - To construct a new 1880 square foot, one story, wood framed office shell building and related site improvements. This is a shell permit only. No occupancy is allowed under this permit. Separate tenant improvement permits will be required to finish this building for occupancy. This building shares a zero lot line with office building #F. All construction per the approved plans. JCM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Fee Review-notes1/24/20061/24/20063/23/2007 DONE
Third Notice BLD2/22/20072/22/20073/22/2007 DONE
Second Notice has not been responded to.
Telephone call  3/22/2007 DONE
call to Wedge plm and left msg for them to call re: FV different from GC FV.
Second Notice BLD2/7/20072/7/20072/22/2007 DONE
First Notice has not been responded to.
First Notice1/25/20071/25/20072/7/2007 DONE
DetailsMike Jordan
BLD-Final1/24/20071/25/20071/25/2007APASS
DetailsMike Jordan
jeff; Phone #: ###-#### Internet Inspection Request from: Victoria Beall
DOC - Permit Finaled1/25/20071/25/20071/25/2007PPASS
DetailsMike Jordan
UL approved 1 hr attic access installed. Letter of compliance issued for shell and core. Bonded for landscape and public works.
BLD-Final12/27/200612/28/200612/28/2006APART
DetailsMike Jordan
jeff ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith. Ok for temp occ on shell. Needs to install 1hr rated UL listed attic access.
Print Occupancy Form  12/28/2006 DONE
Temporary occupancy  12/28/2006 DONE
Temp. Occ. Cert. # 5500 issued 12-28-06 to the Southwind Business Park.
BLD-Final12/26/200612/27/200612/27/2006PFAIL
DetailsMike Jordan
jeff ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith. Radiation damper required at fresh air duct at penetration at 1hr ceiling assembly. Provide UL listed 1hr attic access. Remove sheet metal patch at 1hr ceiling assembly . Must attach back to framing member.
FIRE-Final Inspection12/26/200612/27/200612/27/2006APASS
DetailsTroy Cobbley
life safety finaled
FIRE-Final Inspection12/22/200612/26/200612/26/2006APASS
DetailsForrest France
Items on previous c/n are complete, shell life safety is acceptable.
FIRE-Final Inspection12/22/200612/22/200612/22/2006PCANC
DetailsTroy Cobbley
Per Jeff he wants to reschedule for next week.
Code Occupancy Approval Temp  12/21/2006 DONE
I WILL SIGN TEMPORARY WHEN BOND POSTED FOR $79278.66
FIRE-Final Inspection12/12/200612/12/200612/12/2006PFAIL
DetailsTroy Cobbley
Provide pavement, provide fire lane signage per sheet A1-1a, provide sticker at the main exit, provide remote annunciator and test the duct smoke detector and provide the fire dept. review comments for other possible requirements.
BLD-Conference12/11/200612/12/200612/12/2006ADONE
DetailsMike Jordan
jeff; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
BLD-Framing/Rough-in11/2/200611/2/200611/2/2006PNR
DetailsMike Jordan
jeff ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith
BLD-Framing/Rough-in11/1/200611/1/200611/1/2006PFAIL
DetailsMike Jordan
jeff; Phone #: ###-#### Internet Inspection Request from: Patricia Smith. Needs to box out elec panel box.
BLD-Framing/Rough-in10/27/200610/30/200610/30/2006ANR
DetailsMike Jordan
kameron; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles. Needs to pull elec. permit for shell and get ri insp.
BLD-Aging Inspection10/4/200610/4/200610/4/2006 PASS
DetailsMike Jordan
wip
BLD-Framing/Rough-in7/19/20067/20/20067/20/2006PPART
DetailsMike Jordan
cameron sheer nailing; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley. Roof nailing and hardware ok. Shear nailing on exterior perimeter walls ok. Simpson holddown straps were not installed. c/n posted. ok to cover roof.
BLD-Other7/5/20067/6/20067/6/2006APART
DetailsMike Jordan
MARK nOTE: SHEET WALL AND NAILING ; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles. 1hour seperation wall innner layer nailing pattern.
BLD-Footing6/5/20066/6/20066/6/2006APASS
DetailsMike Jordan
ed - reinsp; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley. peremeter footings. no special insp. is required.
BLD-Footing6/2/20066/5/20066/5/2006APART
DetailsMike Jordan
Phone #: ###-#### Internet Inspection Request from: Cathy Chiles. perimeter footings. Cpntractor to confirm special insp.
(F) Reprint permit  5/26/2006  
Issue PAID IN FULL permit  5/25/2006 DONE
CHANGE STATUS TO (RDY)  5/22/2006 DONE
Telephone call  5/22/2006 DONE
called Jerry Teal permit ready to pick up and fee given
Plan assigned to (JCM)5/10/20065/10/20065/19/2006 PASS
5/19/2006 12:41:24 JCM - activity updated through activity BLDA022 from case BLD06-00169.
Plan Reviewer's activity  5/19/2006 PASS
After the plans were approved, but before the permit was issued, the applicant revised the plans to change the floor system from crawl space to slab on grade. Plan changes approved as submitted. JCM
PLANS/APPL TAKEN TO FRONT DESK  5/19/2006 DONE
Plan resubmittals received  5/10/2006 DONE
Received 1 transmittal & 3 copys of sheets A2-2,A2-4,A4-1,A4-2,A7-1,A7-2 taken to John M.
Telephone call  3/16/2006  
Left message with David (for Jerry Teal) ###-#### to pick up permit and to provide ACHD 3-16-06 eus
Permit Ready to Issue  3/16/2006  
Plan Reviewer's activity  3/15/2006 PASS
Reviewed and approved resubmittals. JCM
PLANS/APPL TAKEN TO FRONT DESK  3/15/2006 DONE
Inspection Record Card- Bld  3/15/2006  
Plan assigned to (JCM)1/26/2006 3/15/2006 PASS
3/15/2006 09:47:48 JCM - activity updated through activity BLDA022 from case BLD06-00169.
Routing - PLAN CHECK2/27/2006 3/15/2006 PASS
Plan resubmittals received  3/8/2006  
Received 1 plan review comment letter, 1 Fire plan reveiw letter, 1 copy of structural calcs, 4 copies of A0-1, 4 copies of A1-1a, 4 copies of A2-1, 4 copies of A2-2, 4 copies of A2-3, 4 copies of A4-1 and taken to John M.
1st review completed  2/27/2006 FAIL
Failed Plan Check.
Routing - FIRE2/22/2006 2/27/2006 PASS
Attached comments to plans. Faxed review comments to architect.
Routing - PLAN CHECK2/10/2006 2/22/2006 FAIL
John Menard
Plan resubmittals requested  2/22/2006 DONE
E-mailed the architect a copy of the plan review requesting revisions. JCM
Routing - PLANNING2/6/2006 2/10/2006 PASS
Approved.
Routing - Erosion and Sediment2/6/2006 2/6/2006 PASS
ESC plan approved with attached conditions. Reference ESC05-00837 as master ESC plan for project.adh.
Routing - PUBLIC WORKS1/31/2006 2/6/2006 PASS
Routing - PLUMBING2/6/2006 2/6/2006 PASS
per plans and 2003 upc
Routing - PLANNING Land Div1/26/2006 1/31/2006 PASS
Property is a platted lot in Spoke Ranch Sub. #2.
Plan routing begun/NEW & ADDTN  1/26/2006  
Application received  1/24/2006  
Recd Pcfee & Taken To Pln CK  1/24/2006