Permit Information
Permit NumberBLD06-00170
StatusFinaled
Name JAYO CONSTRUCTION
Site Address 10548 W BUSINESSPARK LN
Project NameSouthwind Business Park (Build
Customer Number 
ePlanReviewNo
Description
Southwind Business Park - Building #F (Shell Only) - To construct a new 1880 square foot, one story, wood framed office shell building and related site improvements. This is a shell permit only. No occupancy is allowed under this permit. Separate tenant improvement permits will be required to finish this building for occupancy. This building shares a zero lot line with office building #E. All construction per the approved plans. JCM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
MISC ACTIONS  3/22/2010 DONE
DetailsTisha Gallop
Per Building Official and Rita reset final value at $68/sq.ft. based on an average of shell buildings built during the same time period.
Telephone call  3/22/2010 DONE
DetailsTisha Gallop
called Doug Jayo and told him Building Official set at $68/sq.ft. Doug didn't agree and I told him need to write a letter to the Building Official to dispute valuation set.
Case Summary (BLD)  3/19/2010 DONE
DetailsTisha Gallop
Telephone call  3/18/2010 DONE
DetailsTisha Gallop
spoke with Doug Jayo, he said will fax over final values now. Told him per no response from him withing the allotted time frame we set the value according to the ICC standards. If he says the value is lower will have to provide a copy of the contract/invoice for proof of the final value.
MISC ACTIONS  1/29/2010 DONE
DetailsTisha Gallop
set final value according to ICC Buiding Valuation Data.($105.26 per sq.ft - 20% for shell only = $158,311)
Third Notice 12/30/20091/13/2010 DONE
faxed and mailed
Telephone call  1/13/2010 DONE
DetailsTisha Gallop
called and left vm need FV, if not set within 2 weeks will set value according to ICC table.
Third Notice 12/9/200912/16/2009 DONE
faxed, mailed and called
Telephone call  12/16/2009  
DetailsTisha Gallop
called and spoke to recep. she said would put the FV request on Doug Jayo's desk for him to complete.
Third Notice 11/14/200911/25/2009 DONE
faxed
Second Notice 10/31/200911/4/2009 DONE
First Notice10/19/200910/19/200910/21/2009 DONE
DetailsMike Jordan
BLD-Final10/16/200910/19/200910/19/2009APASS
DetailsMike Jordan
cameron Phone #: ###-####
DOC - Permit Finaled10/19/200910/19/200910/19/2009PPASS
DetailsMike Jordan
Letter of compliance issued. Shell and core only. No slab on grade or other trades on interior work. Also noted on approved plans that remainder of 1hr. rated const. to be completed when TI work is to start. Still need rated const. at ceiling and for 10ft. on exterior wall from property line at tenant seperation. Elec. panel will be and issue.
FIRE-Final Inspection10/15/200910/16/200910/16/2009APASS
DetailsTroy Cobbley
Life safety passed.
BLD-Conference10/14/200910/14/200910/14/2009PPASS
DetailsMike Jordan
Spoke to cameron with Jayo const. Noted to him to get life/safety and bldg. finals for shell and core. all other trades and zoning have signed off. Cameron noted that he would get plans and get the life/safety and shell and core finaled so that permit can be closed out and not expired.
BLD-Final5/20/20085/21/20085/21/2008PNR
DetailsMike Jordan
Cameron; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt. Needs life/safety final.
Code Occupancy Approval3/10/20083/10/20083/10/2008PPASS
DetailsScott M.Brown
OK FOR FINAL
BLD-Conference2/25/20082/25/20082/25/2008PPASS
DetailsMike Jordan
Called and spoke to Kameron Jayo, He noted that he would get all finals called in so that permit could be sighned off.
BLD-Framing/Rough-in11/2/200611/2/200611/2/2006PNR
DetailsMike Jordan
jeff ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith
BLD-Framing/Rough-in11/1/200611/1/200611/1/2006PFAIL
DetailsMike Jordan
jeff; Phone #: ###-#### Internet Inspection Request from: Patricia Smith. NOted elec. panel in 1 hr exterior wall, must be moved or boxed out.
BLD-Framing/Rough-in10/27/200610/30/200610/30/2006ANR
DetailsMike Jordan
kameron; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles. Needs elec. ri insp. Elec permit attached is for the tenant improvement and not the shell.
BLD-Wall cover7/20/20067/20/20067/20/2006PPART
DetailsMike Jordan
Noted that remainder of inspections were completed along with bldg F (bld06-00169) noted on posted c/n that contractor needs to call in both permits for insp. Roof nailing and hardware ok. Exterior shear wall nailing ok. Simpson holddown straps not installed. c/n posted. ok to cover roof.
BLD-Footing6/2/20066/5/20066/5/2006APART
DetailsMike Jordan
Phone #: ###-#### Internet Inspection Request from: Cathy Chiles. Permiter footings. Contractor to confirm special insp.
(F) Reprint permit  5/26/2006  
Issue PAID IN FULL permit  5/25/2006 DONE
Telephone call  5/22/2006  
called Jerry Teal permit ready to pick up and fee given
Plan assigned to (JCM)5/10/20065/10/20065/19/2006 PASS
5/19/2006 12:41:00 JCM - activity updated through activity BLDA022 from case BLD06-00170.
Plan Reviewer's activity  5/19/2006 PASS
After the plans were approved, but before the permit was issued, the applicant revised the plans to change the floor system from crawl space to slab on grade. Plan changes approved as submitted. JCM
PLANS/APPL TAKEN TO FRONT DESK  5/19/2006 DONE
Plan resubmittals received  5/10/2006  
Received 1 transmittal & 3 copys of sheets A2-2,A2-4,A4-1,A4-2,A7-1,A7-2 taken to John M.
Telephone call  3/16/2006  
Left message with David (for Jerry Teal) ###-#### to pick up permit and to provide ACHD 3-16-06 eus
Permit Ready to Issue  3/16/2006  
Plan Reviewer's activity  3/15/2006 PASS
Reviewed and approved resubmittals. JCM
PLANS/APPL TAKEN TO FRONT DESK  3/15/2006 DONE
Inspection Record Card- Bld  3/15/2006  
Routing - PLAN CHECK2/27/2006 3/15/2006 PASS
Plan assigned to (JCM)1/26/2006 3/15/2006 PASS
3/15/2006 09:48:51 JCM - activity updated through activity BLDA022 from case BLD06-00170.
Plan resubmittals received  3/8/2006  
Received 1 plan review comment letter, 1 Fire plan reveiw letter, 1 copy of structural calcs, 4 copies of A0-1, 4 copies of A1-1a, 4 copies of A2-1, 4 copies of A2-2, 4 copies of A2-3, 4 copies of A4-1 and taken to John M.
Routing - FIRE2/22/2006 2/27/2006 PASS
Attached review comments to plans. Faxed comments to architect.
1st review completed  2/27/2006 FAIL
Failed Plan Check.
Routing - PLAN CHECK2/10/2006 2/22/2006 FAIL
John Menard
Plan resubmittals requested  2/22/2006 DONE
E-mailed the architect a copy of the plan review requesting revisions. JCM
Routing - PLANNING2/6/2006 2/10/2006 PASS
Approved.
Routing - PLUMBING2/6/2006 2/6/2006 PASS
per plans and 2003 upc
Routing - Erosion and Sediment2/6/2006 2/6/2006 PASS
ESC plan approved with attached conditions.Reference ESC05-00837 as master ESC plan for project.adh.
Routing - PUBLIC WORKS1/31/2006 2/6/2006 PASS
Routing - PLANNING Land Div1/26/2006 1/31/2006 PASS
Property is located in Spoke Ranch Sub. #2.
Application received  1/24/2006  
Recd Pcfee & Taken To Pln CK  1/24/2006  
Fee Review-notes1/24/20061/24/2006