MISC ACTIONS | | | 3/22/2010 | | DONE |
Tisha Gallop
|
|
|
Per Building Official and Rita reset final value at $68/sq.ft. based on an average of shell buildings built during the same time period.
|
Telephone call | | | 3/22/2010 | | DONE |
Tisha Gallop
|
|
|
called Doug Jayo and told him Building Official set at $68/sq.ft. Doug didn't agree and I told him need to write a letter to the Building Official to dispute valuation set.
|
Case Summary (BLD) | | | 3/19/2010 | | DONE |
Tisha Gallop
|
|
|
|
Telephone call | | | 3/18/2010 | | DONE |
Tisha Gallop
|
|
|
spoke with Doug Jayo, he said will fax over final values now. Told him per no response from him withing the allotted time frame we set the value according to the ICC standards. If he says the value is lower will have to provide a copy of the contract/invoice for proof of the final value.
|
MISC ACTIONS | | | 1/29/2010 | | DONE |
Tisha Gallop
|
|
|
set final value according to ICC Buiding Valuation Data.($105.26 per sq.ft - 20% for shell only = $158,311)
|
Third Notice | | 12/30/2009 | 1/13/2010 | | DONE |
|
|
|
faxed and mailed
|
Telephone call | | | 1/13/2010 | | DONE |
Tisha Gallop
|
|
|
called and left vm need FV, if not set within 2 weeks will set value according to ICC table.
|
Third Notice | | 12/9/2009 | 12/16/2009 | | DONE |
|
|
|
faxed, mailed and called
|
Telephone call | | | 12/16/2009 | | |
Tisha Gallop
|
|
|
called and spoke to recep. she said would put the FV request on Doug Jayo's desk for him to complete.
|
Third Notice | | 11/14/2009 | 11/25/2009 | | DONE |
|
|
|
faxed
|
Second Notice | | 10/31/2009 | 11/4/2009 | | DONE |
|
|
|
|
First Notice | 10/19/2009 | 10/19/2009 | 10/21/2009 | | DONE |
Mike Jordan
|
|
|
|
BLD-Final | 10/16/2009 | 10/19/2009 | 10/19/2009 | A | PASS |
Mike Jordan
|
|
|
cameron Phone #: ###-####
|
DOC - Permit Finaled | 10/19/2009 | 10/19/2009 | 10/19/2009 | P | PASS |
Mike Jordan
|
|
|
Letter of compliance issued. Shell and core only. No slab on grade or other trades on interior work. Also noted on approved plans that remainder of 1hr. rated const. to be completed when TI work is to start. Still need rated const. at ceiling and for 10ft. on exterior wall from property line at tenant seperation. Elec. panel will be and issue.
|
FIRE-Final Inspection | 10/15/2009 | 10/16/2009 | 10/16/2009 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed.
|
BLD-Conference | 10/14/2009 | 10/14/2009 | 10/14/2009 | P | PASS |
Mike Jordan
|
|
|
Spoke to cameron with Jayo const. Noted to him to get life/safety and bldg. finals for shell and core. all other trades and zoning have signed off. Cameron noted that he would get plans and get the life/safety and shell and core finaled so that permit can be closed out and not expired.
|
BLD-Final | 5/20/2008 | 5/21/2008 | 5/21/2008 | P | NR |
Mike Jordan
|
|
|
Cameron; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt. Needs life/safety final.
|
Code Occupancy Approval | 3/10/2008 | 3/10/2008 | 3/10/2008 | P | PASS |
Scott M.Brown
|
|
|
OK FOR FINAL
|
BLD-Conference | 2/25/2008 | 2/25/2008 | 2/25/2008 | P | PASS |
Mike Jordan
|
|
|
Called and spoke to Kameron Jayo, He noted that he would get all finals called in so that permit could be sighned off.
|
BLD-Framing/Rough-in | 11/2/2006 | 11/2/2006 | 11/2/2006 | P | NR |
Mike Jordan
|
|
|
jeff ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith
|
BLD-Framing/Rough-in | 11/1/2006 | 11/1/2006 | 11/1/2006 | P | FAIL |
Mike Jordan
|
|
|
jeff; Phone #: ###-#### Internet Inspection Request from: Patricia Smith. NOted elec. panel in 1 hr exterior wall, must be moved or boxed out.
|
BLD-Framing/Rough-in | 10/27/2006 | 10/30/2006 | 10/30/2006 | A | NR |
Mike Jordan
|
|
|
kameron; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles. Needs elec. ri insp. Elec permit attached is for the tenant improvement and not the shell.
|
BLD-Wall cover | 7/20/2006 | 7/20/2006 | 7/20/2006 | P | PART |
Mike Jordan
|
|
|
Noted that remainder of inspections were completed along with bldg F (bld06-00169) noted on posted c/n that contractor needs to call in both permits for insp. Roof nailing and hardware ok. Exterior shear wall nailing ok. Simpson holddown straps not installed. c/n posted. ok to cover roof.
|
BLD-Footing | 6/2/2006 | 6/5/2006 | 6/5/2006 | A | PART |
Mike Jordan
|
|
|
Phone #: ###-#### Internet Inspection Request from: Cathy Chiles. Permiter footings. Contractor to confirm special insp.
|
(F) Reprint permit | | | 5/26/2006 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 5/25/2006 | | DONE |
|
|
|
|
Telephone call | | | 5/22/2006 | | |
|
|
|
called Jerry Teal permit ready to pick up and fee given
|
Plan assigned to (JCM) | 5/10/2006 | 5/10/2006 | 5/19/2006 | | PASS |
|
|
|
5/19/2006 12:41:00 JCM - activity updated through activity BLDA022 from case BLD06-00170.
|
Plan Reviewer's activity | | | 5/19/2006 | | PASS |
|
|
|
After the plans were approved, but before the permit was issued, the applicant revised the plans to change the floor system from crawl space to slab on grade. Plan changes approved as submitted. JCM
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/19/2006 | | DONE |
|
|
|
|
Plan resubmittals received | | | 5/10/2006 | | |
|
|
|
Received 1 transmittal & 3 copys of sheets A2-2,A2-4,A4-1,A4-2,A7-1,A7-2 taken to John M.
|
Telephone call | | | 3/16/2006 | | |
|
|
|
Left message with David (for Jerry Teal) ###-#### to pick up permit and to provide ACHD 3-16-06 eus
|
Permit Ready to Issue | | | 3/16/2006 | | |
|
|
|
|
Plan Reviewer's activity | | | 3/15/2006 | | PASS |
|
|
|
Reviewed and approved resubmittals. JCM
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/15/2006 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 3/15/2006 | | |
|
|
|
|
Routing - PLAN CHECK | 2/27/2006 | | 3/15/2006 | | PASS |
|
|
|
|
Plan assigned to (JCM) | 1/26/2006 | | 3/15/2006 | | PASS |
|
|
|
3/15/2006 09:48:51 JCM - activity updated through activity BLDA022 from case BLD06-00170.
|
Plan resubmittals received | | | 3/8/2006 | | |
|
|
|
Received 1 plan review comment letter, 1 Fire plan reveiw letter, 1 copy of structural calcs, 4 copies of A0-1, 4 copies of A1-1a, 4 copies of A2-1, 4 copies of A2-2, 4 copies of A2-3, 4 copies of A4-1 and taken to John M.
|
Routing - FIRE | 2/22/2006 | | 2/27/2006 | | PASS |
|
|
|
Attached review comments to plans. Faxed comments to architect.
|
1st review completed | | | 2/27/2006 | | FAIL |
|
|
|
Failed Plan Check.
|
Routing - PLAN CHECK | 2/10/2006 | | 2/22/2006 | | FAIL |
|
|
|
John Menard
|
Plan resubmittals requested | | | 2/22/2006 | | DONE |
|
|
|
E-mailed the architect a copy of the plan review requesting revisions. JCM
|
Routing - PLANNING | 2/6/2006 | | 2/10/2006 | | PASS |
|
|
|
Approved.
|
Routing - PLUMBING | 2/6/2006 | | 2/6/2006 | | PASS |
|
|
|
per plans and 2003 upc
|
Routing - Erosion and Sediment | 2/6/2006 | | 2/6/2006 | | PASS |
|
|
|
ESC plan approved with attached conditions.Reference ESC05-00837 as master ESC plan for project.adh.
|
Routing - PUBLIC WORKS | 1/31/2006 | | 2/6/2006 | | PASS |
|
|
|
|
Routing - PLANNING Land Div | 1/26/2006 | | 1/31/2006 | | PASS |
|
|
|
Property is located in Spoke Ranch Sub. #2.
|
Application received | | | 1/24/2006 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 1/24/2006 | | |
|
|
|
|
Fee Review-notes | 1/24/2006 | 1/24/2006 | | | |
|
|
|
|