BLD-Final | 8/31/2006 | 8/31/2006 | 8/31/2006 | P | PASS |
Jim Sly
|
|
|
randy; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley c/c issued
|
DOC - Permit Finaled | 8/31/2006 | 8/31/2006 | 8/31/2006 | P | PASS |
Jim Sly
|
|
|
|
BLD-Energy code compliance | 6/7/2006 | 6/8/2006 | 6/8/2006 | A | PASS |
Jim Sly
|
|
|
randy; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles Frame and Energy OK
|
BLD-Framing/Rough-in | 5/23/2006 | 5/24/2006 | 5/24/2006 | A | NR |
Jim Sly
|
|
|
randy; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
BLD-Footing | 4/3/2006 | 4/4/2006 | 4/4/2006 | P | PASS |
Jim Sly
|
|
|
Scott; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong
|
Plan assigned to (SRZ) | 3/13/2006 | 3/13/2006 | 3/27/2006 | | PASS |
|
|
|
3/27/2006 14:48:54 SRZ - activity updated through activity BLDA022 from case BLD06-00185.
|
Routing - PLAN CHECK | 2/28/2006 | | 3/27/2006 | | PASS |
|
|
|
|
Plan Reviewer's activity | | | 3/27/2006 | | PEND |
|
|
|
PLAN REVIEW PENDING ENGINEERING FOR STEEL COLUMN
DESIGNER SAID HE WOULD FAX ENGINEERING OVER TO ME. (SRZ)
|
Plan Reviewer's activity | | | 3/27/2006 | | DONE |
|
|
|
RECIEVED STEEL COLUMN ENGINEERING. (SRZ)
|
Case Summary (BLD) | | | 3/27/2006 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/27/2006 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 3/27/2006 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 3/27/2006 | | DONE |
|
|
|
|
Plan Reviewer's activity | | | 3/22/2006 | | PASS |
|
|
|
Received new 2nd floor sheets with Wall bracing called out. (SRZ)
|
Plan assigned to (SAM) | 1/25/2006 | 1/25/2006 | 3/13/2006 | | DONE |
|
|
|
|
Plan Reviewer's activity | | | 3/13/2006 | | FAIL |
|
|
|
Need new 2nd floor plan re-submitted with wall bracing locations called out on plans. (SRZ)
|
Routing - PUBLIC WORKS | 2/28/2006 | | 2/28/2006 | | PASS |
|
|
|
|
Routing - PLANNING | 1/25/2006 | | 2/28/2006 | | PASS |
Tom Curren
|
|
|
Site plans do not include driveway widths, indication of paving, or street locations. Contacted Sharon Clark on 2/27. She stated that revised site plans would be submitted on 1/30.
Revise site plan provided 2/28/2006. Plan complete and complies with setback requirements. TAC
|
Routing - PLANNING | 2/10/2006 | | 2/10/2006 | | FAIL |
|
|
|
Site plan indicates home will be located in the street-side setback, and driveway is not 50' away from the intersection.
|
Routing - PLANNING | 2/7/2006 | | 2/7/2006 | | FAIL |
|
|
|
Only a reduced site plan was provided. Left message w/ applicant requesting two full size site plans.
|
Application received | | | 1/25/2006 | | |
|
|
|
|