BLD-Aging Inspection | 11/7/2008 | 11/7/2008 | 11/7/2008 | | CANC |
Tom Arcoraci
|
|
|
|
Expired/Cancelled | 11/7/2008 | 11/7/2008 | 11/7/2008 | P | PASS |
Tom Arcoraci
|
|
|
|
BLD-Aging Inspection | 7/11/2008 | 7/11/2008 | 7/11/2008 | | FAIL |
Tom Arcoraci
|
|
|
cn posted
|
BLD-Final | 5/9/2008 | 5/9/2008 | 5/9/2008 | P | PART |
Tom Arcoraci
|
|
|
zack - please call 1/2 hr prior to inspection Phone #: ###-#### ok for temp complete handrails see plan
|
Code Occupancy Approval Temp | 5/7/2008 | 5/7/2008 | 5/7/2008 | P | PASS |
Dena Gambrel
|
|
|
TEMPORARY ONLY. They will need to submit and get approved an update lanscape plan.
|
FIRE-Final Inspection | 5/1/2008 | 5/2/2008 | 5/2/2008 | A | PASS |
Forrest France
|
|
|
Life safety inspection completed acceptable pending the installation of lever hardware at the second exit door-to be verified at the structural final per agreement with contractor.
|
Case Summary (BLD) | | | 5/1/2008 | | DONE |
|
|
|
|
Plan resubmittals received | | | 5/1/2008 | | DONE |
|
|
|
Received letter from GC requesting to reopen permit; put on George Slane's desk
|
Reopen Permit (ISS) | | | 5/1/2008 | | DONE |
|
|
|
Per George Slane ok to reopen permit from expired status. See attached scanned letter in documents. Customer still needs the following inspections: ACHD, code enforcement/landscaping, fire/life safety, structural final.
|
BLD-Aging Inspection | 12/13/2007 | 12/13/2007 | 12/13/2007 | | CANC |
Tom Arcoraci
|
|
|
|
Expired/Cancelled | 12/13/2007 | 12/13/2007 | 12/13/2007 | P | PASS |
Tom Arcoraci
|
|
|
|
BLD-Aging Inspection | 9/28/2007 | 9/28/2007 | 9/28/2007 | | NR |
Tom Arcoraci
|
|
|
|
BLD-Aging Inspection | 7/26/2007 | 7/26/2007 | 7/26/2007 | | NR |
Tom Arcoraci
|
|
|
|
BLD-Aging Inspection | 4/30/2007 | 4/30/2007 | 4/30/2007 | | PASS |
Tom Arcoraci
|
|
|
|
BLD-Energy code compliance | 2/23/2007 | 2/26/2007 | 2/26/2007 | A | PASS |
Mike Jordan
|
|
|
don; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles. ok to cover.
|
BLD-Framing/Rough-in | 1/25/2007 | 1/26/2007 | 1/26/2007 | A | PASS |
Jim Sly
|
|
|
don; Phone #: ###-#### Internet Inspection Request from: Darla Downs
|
BLD-Conference | 12/15/2006 | 12/15/2006 | 12/15/2006 | P | PASS |
Tom Arcoraci
|
|
|
stan ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith wip ok
|
BLD-Aging Inspection | 10/25/2006 | 10/25/2006 | 10/25/2006 | | NR |
Tom Arcoraci
|
|
|
no inspections
|
BLD-Aging Inspection | 8/24/2006 | 8/24/2006 | 8/24/2006 | | PASS |
Tom Arcoraci
|
|
|
|
BLD-Aging Inspection | 6/19/2006 | 6/19/2006 | 6/23/2006 | | PASS |
Tom Arcoraci
|
|
|
|
Permit Ready to Issue | | | 3/20/2006 | | DONE |
|
|
|
|
Telephone call | | | 3/20/2006 | | DONE |
|
|
|
called ###-#### and left message for Barbara that permit is ready, fees and need ACHD
|
Issue PAID IN FULL permit | | | 3/20/2006 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 3/15/2006 | | 3/17/2006 | | PASS |
|
|
|
ESC plan waiver request approved with attached conditions.
|
Routing - PLAN CHECK | 3/17/2006 | | 3/17/2006 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/17/2006 | | DONE |
|
|
|
|
Print Occupancy Form | | | 3/17/2006 | | |
|
|
|
|
Plan assigned to (CJW) | 1/31/2006 | | 3/17/2006 | | PASS |
|
|
|
3/17/2006 10:53:35 CJW - activity updated through activity BLDA022 from case BLD06-00195.
|
Routing - PLAN CHECK | 3/14/2006 | | 3/15/2006 | | PASS |
|
|
|
Drawings approved after resubmittal review.
|
Plan resubmittals received | | | 3/14/2006 | | |
|
|
|
Received 1 copy of cover transmittal letter, 2 copies of the following- Sheet 2, 4, 5, 8, 9 and taken to Carl W.
|
Routing - PLAN CHECK | 3/6/2006 | | 3/14/2006 | | |
|
|
|
Sent back to Planning.
|
Routing - PLANNING | 3/14/2006 | | 3/14/2006 | | PASS |
|
|
|
Approved per CAC05-00255 and CAA05-00314.
|
Routing - FIRE | 3/2/2006 | | 3/6/2006 | | PASS |
|
|
|
Attached review comments to plans.
|
1st review completed | | | 3/6/2006 | | FAIL |
|
|
|
Failed Plan Check, ESC and Planning.
|
Routing - PLAN CHECK | 2/2/2006 | | 3/2/2006 | | FAIL |
|
|
|
IBC plan review started on February 28, 2006 and finished on March 2, 2006. Revised drawings were required. See the plan review report.
|
Plan resubmittals received | | | 2/9/2006 | | DONE |
|
|
|
Received via fax 1 letter to Steve W. taken to Carl W.
|
Routing - Erosion and Sediment | 2/1/2006 | | 2/2/2006 | | FAIL |
|
|
|
ESC plan failed, no ESC plan or waiver request included. Contacted applicant.
|
Routing - PLANNING | 2/2/2006 | | 2/2/2006 | | FAIL |
|
|
|
Angela Wood CAA05-00314
Sarah Schafer CZC05-00255 - No landscape plans provided. Will call applicant or rep.
|
Routing - PUBLIC WORKS | 1/31/2006 | | 2/1/2006 | | PASS |
|
|
|
|
Pending Assignment by MYS | 1/25/2006 | | 1/31/2006 | | DONE |
|
|
|
1/31/2006 07:48:57 MYS - activity updated through activity BLDA172 from case BLD06-00195.
|
Plans ACCEPTED BY PLAN TECH | | | 1/27/2006 | | |
|
|
|
|
Application received | | | 1/25/2006 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 1/25/2006 | | |
|
|
|
|
Fee Review-notes | 1/25/2006 | 1/25/2006 | | | |
|
|
|
|