Case Summary (BLD) | | | 6/2/2010 | | DONE |
|
|
|
|
Third Notice | | 7/22/2009 | 7/27/2009 | | DONE |
Rita DeYoung
|
|
|
|
Second Notice BLD | 3/4/2009 | 3/4/2009 | 7/22/2009 | | DONE |
Rita DeYoung
|
|
|
First Notice has not been responded to.
|
Third Notice | | 3/11/2009 | 3/11/2009 | | DONE |
Rita DeYoung
|
|
|
|
First Notice | | 1/30/2009 | 3/4/2009 | | DONE |
Rita DeYoung
|
|
|
|
Permanent Occupancy | | | 1/30/2009 | | DONE |
Barbara Stitt
|
|
|
|
BLD-Conference | 10/28/2008 | 10/29/2008 | 11/4/2008 | A | PASS |
Dave Hannah
|
|
|
Barb-Dave could you please look at this and see if it can be finaled now that Fire passed? Phone #: ###-#### ok for perm occ
|
FIRE-Final Inspection | 8/14/2008 | 8/15/2008 | 8/18/2008 | A | PASS |
Forrest France
|
|
|
Okay for life safety final.
|
BLD-Final | 8/11/2008 | 8/12/2008 | 8/14/2008 | A | DEFR |
Forrest France
|
|
|
Barb----Dave this was given temp on 6-9-06 and I need to know if they did what was required to give them perm? See activity notes regarding inspection on 6-9-06. Please let me know...thanks Phone #: ###-#### sent to fire
|
Telephone call | | | 6/16/2006 | | DONE |
|
|
|
Phoned Tony at Radix (###-####) to inform him that he will need to get a FA permit to connect the two duct detectors to the FACP. I also informed him that a double fee (work without a permit) would be applied to the FA permit. I explained to Tony that a "hold" has been placed on this building pernit which will not allow a permanent CofO until the FA permit is finaled.
|
FIRE-Final Inspection | 6/8/2006 | 6/9/2006 | 6/9/2006 | P | PASS |
Forrest France
|
|
|
Corrections have been completed, inspection passed.
|
BLD-Final | 6/8/2006 | 6/9/2006 | 6/9/2006 | P | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 6/8/2006 at 9:47:32 PM. Contact: ###-####. ok for temp occ needs ada signage fixed and vill finish signed off
|
FIRE-Alarm Testing | 6/9/2006 | 6/9/2006 | 6/9/2006 | P | CANC |
Forrest France
|
|
|
Duplicate inspection request.
|
BLD-Final | 6/7/2006 | 6/8/2006 | 6/9/2006 | A | NR |
Dave Hannah
|
|
|
JEAN; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
Temporary occupancy | | | 6/9/2006 | | DONE |
|
|
|
Temp. Occ. Cert. # 5412 issued 6-9-06 to Cold Stone Creamery.
|
FIRE-Final Inspection | 6/7/2006 | 6/8/2006 | 6/8/2006 | A | FAIL |
Forrest France
|
|
|
Project related fire sprinkler permit is not yet finaled, mechanical issues with respect to duct detectors are not resolved.
|
Telephone call | | | 6/7/2006 | | DONE |
|
|
|
Called and talked with roger albers concerning protection of duct penetrations at alley side of exterior wall at 276 N 8th Strre that will serve cold stone creamery. Original plan review comment had required protection of duct penetrations by 1-1/2 hour fire dampers per Sec. 716 2003 IBC. Resubmittals had been provided showing installation of Smoke/Fire dampers at those locations. This would require tie in of smoke detection system to activate smoke dampers into the existing alarm panel. There is no current way to tie smoke dampers into existing panel. Since on fire dampers are required I ask Roger if he would like to modify plans to show code compliance but deleting smoke dampers. He said yes and will e-mail me a statement to stating the same.
|
Additional plans submitted | | | 6/7/2006 | | PASS |
|
|
|
Received e-mail from Roger Albers deleting smoke dampers from duct penetrations at south side alley wall which only require fire dampers of 1-1/2 hour rating with fuse-able link. The fire dampers as specified on plan will remain as a requirement. Copy of e-mail attached to original plans with portions of sheet M4.0 showing changes.
|
Plan Reviewer's activity | | | 6/7/2006 | | DONE |
|
|
|
Copy of change removing smoke dampers from sheet M4.0 with e-mail from Roger Albers, Mechanical Engineer from Engineering Inc stating the same given to fire dept., Mary Froemke and copy with original plans to records.
|
Case Summary (BLD) | | | 6/6/2006 | | |
|
|
|
|
FIRE-Final Inspection | 6/2/2006 | 6/2/2006 | 6/2/2006 | P | FAIL |
Forrest France
|
|
|
Some items on the previous correction notice have been completed, however the new duct smoke detectors installed at two locations are not connected to the building fire alarm system as required. This work will require a fire alarm permit to be issued prior to installation. Also need to provide proof of a current annual inspection by a qualified fire sprinkler contractor on the building sprinkler system.
|
BLD-Final | 6/2/2006 | 6/2/2006 | 6/2/2006 | A | CANC |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 6/2/2006 at 6:41:07 AM. Contact: ###-####.n/r
|
FIRE-Final Inspection | 6/2/2006 | 6/2/2006 | 6/2/2006 | A | FAIL |
Forrest France
|
|
|
Missing required fire extinguisher, need to repair non-functional emergency light above the main entry, provide approved door hardware at the main entry/exit and the back door (remove manual thumbturns, door knob), provide signage above main entry/exit, provide means to test the two duct smoke detectors.
|
FIRE-Final Inspection | 5/31/2006 | 6/1/2006 | 6/2/2006 | P | FAIL |
Forrest France
|
|
|
The project related fire sprinkler permit must be requested for final inspection and approved prior to life safety final.
|
BLD-Final | 5/31/2006 | 6/1/2006 | 6/1/2006 | P | NR |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 5/31/2006 at 2:48:56 PM. Contact: ###-####.
|
BLD-Framing/Rough-in | 5/31/2006 | 5/31/2006 | 5/31/2006 | P | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 5/26/2006 at 3:45:45 PM. Contact: ###-####. ok to drop in ceiling panels
|
BLD-Other | 5/26/2006 | 5/30/2006 | 5/31/2006 | P | FAIL |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 5/26/2006 at 3:45:45 PM. Contact: ###-####.ceiling grid wires not 1 in 6
|
Meeting | | | 5/31/2006 | | DONE |
|
|
|
Per 5/31/06 email from Tom Gainor: I met with Joe Anders of Park Lane Management at the Idaho Building and gave him the copy of the comments on the smoke control system in the atrium.While I was there, Joe tested the system and it seemed to function, I just don't know if it works. There are two (2) 110 v a.c. smoke detectors: one in the lobby and one at the top of the atrium. When they activate, two of the front doors open and the fans above the atrium start. The smoke detectors are not connected to the building fire alarm system.
The front doors are locked electronically, and will open when the detectors activate, even after hours. Joe is going to give the printout to Ken Howell and advise him that we need an engineer's evaluation of the smoke control system.Tom G.
|
BLD-Framing/Rough-in | 5/3/2006 | 5/4/2006 | 5/4/2006 | A | PART |
Dave Hannah
|
|
|
jerry - ceiling; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles soffit ok received arch cals and detail for sofit
|
Override - Parcel Holds | 1/1/1900 | 1/1/1900 | 5/3/2006 | | |
|
|
|
|
Case Summary (BLD) | | | 5/3/2006 | | |
|
|
|
|
BLD-Framing/Rough-in | 5/1/2006 | 5/2/2006 | 5/2/2006 | A | PART |
Dave Hannah
|
|
|
Jerry; Phone #: ###-#### Internet Inspection Request from: Rita DeYoung
|
Override - Parcel Holds | 1/1/1900 | 1/1/1900 | 5/1/2006 | | |
|
|
|
Jerry - Radix has done the framing and not the ceiling per instructions ikc 5/1/06
|
BLD-Framing/Rough-in | 4/25/2006 | 4/25/2006 | 4/25/2006 | P | PART |
Dave Hannah
|
|
|
jerry --call 1st for access ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie floor pents ok
|
Override - Parcel Holds | 1/1/1900 | 1/1/1900 | 4/25/2006 | | |
|
|
|
needs fr insp
|
BLD-Conference | 4/20/2006 | 4/20/2006 | 4/20/2006 | P | PASS |
Dave Hannah
|
|
|
jerry; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
Issue PAID IN FULL permit | | | 4/12/2006 | | |
|
|
|
|
Additional plans submitted | | | 4/11/2006 | | DONE |
|
|
|
Recieved copy of conditions from Ken Howell, building owner agreeing to upgrade & conditions. copy attached to plans.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/11/2006 | | PASS |
|
|
|
To permit desk to issue.
|
Print Occupancy Form | | | 4/11/2006 | | |
|
|
|
|
Print Occupancy Form | | | 4/11/2006 | | |
|
|
|
|
Telephone call | | | 4/11/2006 | | DONE |
|
|
|
called Radix Const. at ###-#### and left message w/JoAnne that permit is ready
|
Permit Ready to Issue | | | 4/11/2006 | | DONE |
|
|
|
|
Plan assigned to (DRS) | 2/6/2006 | | 4/11/2006 | | PASS |
|
|
|
4/11/2006 12:06:40 DRS - activity updated through activity BLDA022 from case BLD06-00213.
|
Routing - PLAN CHECK | 3/15/2006 | | 4/11/2006 | | PASS |
Dan Stuart
|
|
|
|
Additional plans submitted | | | 4/5/2006 | | DONE |
|
|
|
Received signed and dated copy of conditions for issuance of this building permit from Stuart dennis, owner of Cold Stone Creamery. Copy attached to plans.
|
Plan resubmittals received | | | 4/4/2006 | | DONE |
|
|
|
Received new lighting compliance certificate and description of plan lighting modifications. Red-lined corrections on plans and attached electrical engineers submittal.
|
Plan resubmittals requested | | | 4/3/2006 | | DONE |
|
|
|
Requested corrections for lighting fixture compliance from rod mulder.
|
Plan resubmittals received | | | 3/24/2006 | | |
|
|
|
Received 1 copy of response to plan review comments, 2 copies of the following A0.1, A1.0, A2.0, A3.0, A5.0, M0.0, M1.0, M2.0, M3.0, M4.0, E1.0, E2.0, E3.0 and taken to Dan S.
|
Plan resubmittals received | | | 3/17/2006 | | |
|
|
|
Received 1 copy of cover transmittal, 1 page of analysis of plumbing fixture requirements, 2 copies of A1.0, A2.0 and taken to Dan S.
|
Routing - FIRE | 3/15/2006 | | 3/15/2006 | | PASS |
|
|
|
Attached review comments to plans. Faxed review comments to architect. Current approved upgrade agreement signed by owner.
|
Plan Reviewer's activity | | | 3/10/2006 | | DONE |
|
|
|
Faxed updated fire review comments to architect.
|
1st review completed | | | 3/8/2006 | | FAIL |
|
|
|
Failed Plan Check and Fire.
|
Routing - FIRE | 3/7/2006 | | 3/8/2006 | | FAIL |
|
|
|
Review completed. Approval pending legal decision on whether this permit may be issued with the unsigned fire alarm upgrade issues.
|
Plan resubmittals requested | | | 3/7/2006 | | DONE |
|
|
|
Faxed and e-mailed copy of plan review conditions to Gene Ulmer.
|
Print Pending Permit.LaserJet4 | | | 3/7/2006 | | |
|
|
|
|
Case Summary (BLD) | | | 3/7/2006 | | |
|
|
|
|
Routing - PLAN CHECK | 2/14/2006 | | 3/7/2006 | | FAIL |
|
|
|
Copy of plan review conditions needing addressed by the architect were faxed and e-mailed to Gene Ulmer @ geneu@radixconstruction.com. Routing plans to fire code anlyst while waiting for response.
|
Routing - PLUMBING | 2/6/2006 | | 2/14/2006 | | PASS |
|
|
|
floor sinks must not be within cabinets or under equipment.
|
Routing - PUBLIC WORKS | 2/7/2006 | | 2/9/2006 | | PASS |
|
|
|
|
Pending Assignment by MYS | 1/26/2006 | | 2/6/2006 | | DONE |
|
|
|
2/6/2006 11:26:04 MYS - activity updated through activity BLDA168 from case BLD06-00213.
|
Plans ACCEPTED BY PLAN TECH | | | 1/30/2006 | | |
|
|
|
|
Application received | | | 1/26/2006 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 1/26/2006 | | |
|
|
|
|
Fee Review-notes | 1/26/2006 | 1/26/2006 | | | |
|
|
|
|