BLD-Final | 7/16/2006 | 7/17/2006 | 7/17/2006 | A | PASS |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 7/16/2006 at 8:05:51 PM. Contact: ###-####.
|
DOC - Permit Finaled | 7/17/2006 | 7/17/2006 | 7/17/2006 | P | PASS |
Mike Jordan
|
|
|
All isues have been resolved.
|
BLD-Final | 7/14/2006 | 7/14/2006 | 7/14/2006 | P | FAIL |
Mike Jordan
|
|
|
ned; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley. Hanrail to high and terminates incorrectly. step in garage exceeds the 7.75 max riser height. Does not have 36" landing in direction of travel at exterior of main exit door.
|
BLD-Final | 7/13/2006 | 7/13/2006 | 7/13/2006 | P | NR |
Mike Jordan
|
|
|
net; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles. Needs other trades final prior to bldg. final. not ready
|
BLD-Energy code compliance | 5/11/2006 | 5/11/2006 | 5/11/2006 | P | PASS |
Mike Jordan
|
|
|
ned ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
BLD-Framing/Rough-in | 5/11/2006 | 5/11/2006 | 5/11/2006 | P | PASS |
Mike Jordan
|
|
|
ned ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie. All framing issues have been resolved.
|
BLD-Energy code compliance | 5/5/2006 | 5/8/2006 | 5/8/2006 | P | NR |
Mike Jordan
|
|
|
Phone #: ###-#### Internet Inspection Request from: Rita DeYoung
|
BLD-Framing/Rough-in | 5/5/2006 | 5/8/2006 | 5/8/2006 | P | FAIL |
Mike Jordan
|
|
|
Phone #: ###-#### Internet Inspection Request from: Rita DeYoung. Tbe required on D3 truss. No truss engineering for repaired trusses.
|
BLD-Framing/Rough-in | 5/4/2006 | 5/5/2006 | 5/5/2006 | A | FAIL |
Mike Jordan
|
|
|
ned ###-####. Provide blocking on all floor joist @ cantilever sections. Draw tight the ML beams. Complete nailing on simpson hangars. Provide TBE at D3 truss. Provide engineering on repaired trusses. c/n posted. ok to insul.
|
Issue PAID IN FULL permit | | | 3/29/2006 | | |
|
|
|
|
Case Summary (BLD) | | | 2/28/2006 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/28/2006 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 2/28/2006 | | |
|
|
|
|
Inspection Record Card- Bld | | | 2/28/2006 | | |
|
|
|
|
Telephone call | | | 2/28/2006 | | |
|
|
|
Left message with Ned (Idaho Best) ###-#### to pick up permit 2-28-06 eus
|
Routing - PLAN CHECK | 2/7/2006 | | 2/28/2006 | | PASS |
|
|
|
|
BLD-Framing/Rough-in | 2/24/2006 | 2/24/2006 | 2/27/2006 | P | PART |
Mike Jordan
|
|
|
Matt ###-#### -- for stem walls. stemwall insp.
|
BLD-Footing | 2/23/2006 | 2/23/2006 | 2/23/2006 | P | PART |
Mike Jordan
|
|
|
James ###-####. Set backs and footing per supplied plans. (early start)
|
Early Start Permit | | | 2/23/2006 | | DONE |
|
|
|
|
Early Start Permit | | | 2/22/2006 | | DONE |
|
|
|
|
Plan assigned to (SAM) | 2/2/2006 | 2/2/2006 | 2/17/2006 | | DONE |
|
|
|
|
Routing - PLANNING | 2/2/2006 | | 2/7/2006 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS | 2/7/2006 | | 2/7/2006 | | PASS |
|
|
|
Routed to PW on 2/7/06
|
Application received | | | 2/2/2006 | | |
|
|
|
|
Plan assigned to (DJO) | 2/17/2006 | | | | |
|
|
|
|