Information based on query as of Friday, August 16, 2024.
Permit Information
Permit NumberBLD06-00271
StatusFinaled
Name B AND A DEVELOPMENT
Site Address 1735 S MILWAUKEE ST
Project NameAMERITEL WAREHOUSE
Customer Number 
ePlanReviewNo
Description
RCE-551///5/5/06 BAS - Ameritel Warehouse - To construct a new 7,100 square foot, one story with 750 square foot mezzanine warehouse and related site improvements. This building is constructed of concrete tilt-up exterior walls and steel roof joist with wood framed interior walls and mezzanine. There is a sprinkler stub into the building, but the building is not fire sprinklered. All construction per the approved plans and attached comment list. JCM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice BLD5/9/20075/9/20075/25/2007 DONE
First Notice has not been responded to.
First Notice 4/24/20075/9/2007 DONE
Permanent occupancy UNPAID FEE  4/5/2007 DONE
Perm. Occ. Cert. #11516 issued 4-5-07 to the Ameritel Warehouse.
BLD-Final2/23/20072/26/20072/26/2007APASS
DetailsMike Jordan
clay ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith. Received final aff. letter from special insp. agency. ok for perm occ. No card to sign for perm.
Permanent Occupancy 2/26/20072/26/2007 DONE
Details
BLD-Final2/14/20072/15/20072/15/2007PPART
DetailsMike Jordan
robert; Phone #: ###-#### Internet Inspection Request from: Victoria Beall. Ok for temp occ. Need final Aff. lettrer from Special insp. agency.
FIRE-Final Inspection2/14/20072/15/20072/15/2007APASS
DetailsTroy Cobbley
Life safety finaled
PubWorks Occupancy Approval2/6/20072/6/20072/6/2007 DONE
Signed final occupancy 01/31/07 R. Rokovitz.
Plan Reviewer's activity  2/2/2007 DONE
Architect has removed the installation of fire sprinklers from this building. The building will not require fire sprinklers. This has been reviewed and approved by the building code and fire code reviewers.
Plan Reviewer's activity  2/2/2007 DONE
Permit revised to clarify that there is a fire sprinkler stubbed to the building, but the building is not fire sprinkled. JCM
Code Occupancy Approval  2/1/2007 PASS
FINAL SIGNED OFF.
FIRE-Final Inspection1/30/20071/31/20071/31/2007PFAIL
DetailsTroy Cobbley
Need to update the permit application since it says that the building will be sprinklered and it isn't. Also need to remove the thumbturn deadbolts and tag the fire extinguishers.
BLD-Framing/Rough-in10/16/200610/16/200610/16/2006PPASS
DetailsMike Jordan
robert ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith
BLD-Framing/Rough-in10/4/200610/4/200610/4/2006PPASS
DetailsMike Jordan
bob; Phone #: ###-#### Internet Inspection Request from: Patricia Smith. Exterior steel stud framing, and interior wood framed walls.
BLD-Foundation8/1/20068/2/20068/2/2006APART
DetailsJim Sly
robert - late am if possible; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley
3x3 Sq columns.....MTI on site.....
BLD-Footing7/14/20067/17/20067/17/2006APART
DetailsTony Young
ROBERT; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
pending s. i. report
BLD-Other6/28/20066/29/20066/29/2006APASS
DetailsMike Jordan
robert Note: panel ins; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles. tilt panels. also recieved special insp.
BLD-Footing6/13/20066/14/20066/14/2006PPASS
DetailsMike Jordan
robert Note: also panel inspection; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles. perimeter footings and six conc. tilt panels.
(F) Reprint permit  5/8/2006  
Issue PAID IN FULL permit  5/5/2006 DONE
Print Occupancy Form  3/28/2006 DONE
Permit Ready to Issue  3/28/2006  
Telephone call  3/28/2006 DONE
talked to clay odell at ###-#### to verlfy plans are ready & need achd before picking up
Routing - PLAN CHECK3/27/2006 3/27/2006 PASS
PLANS/APPL TAKEN TO FRONT DESK  3/27/2006 DONE
Plan assigned to (JCM)2/6/2006 3/27/2006 PASS
3/27/2006 16:14:21 JCM - activity updated through activity BLDA022 from case BLD06-00271.
Routing - PLUMBING3/17/2006 3/20/2006 PASS
per plans and 2003 upc
Routing - PUBLIC WORKS3/14/2006 3/17/2006 FAIL
CONTACT JIM PARDY AT ###-####
Routing - PUBLIC WORKS3/17/2006 3/17/2006 PASS
Routing - PLAN CHECK3/3/2006 3/14/2006 PASS
Plan Reviewer's activity  3/14/2006 PASS
Reviewed and approved structural and nonsturctural revisions, JCM
Routing Off Site - STRUCTURAL3/14/2006 3/14/2006 PASS
I reviewed resubmitted structural plans and calculations. JCM
Plan resubmittals received  3/8/2006 DONE
Received 1 response,2 review comments,1 letter to MR. Blomberg & 2 copys of sheets C1,C2,C3,C4,C5,C6,C7,C8 A0.1,A1.1,A3.1,S-1,S-7.1,P0.1,P1.0 taken to John M.
Routing - FIRE2/28/2006 3/3/2006 PASS
Faxed review to architect. Attached comments to plans.
1st review completed  3/3/2006 FAIL
Failed in building, structural, plumbing and public works. JCM
Plan resubmittals requested  2/28/2006 DONE
E-mailed the architect a copy of the plan review requesting revisions. JCM
Routing - PLAN CHECK2/23/2006 2/28/2006 FAIL
John Menard
Plan resubmittals requested  2/24/2006 DONE
Faxed the architect a copy of the comment list from the consulting structural engineer requesting revisions. JCM
Routing - PLANNING2/14/2006 2/23/2006 PASS
Approved.
Routing Off Site - STRUCTURAL2/7/2006 2/21/2006 FAIL
Received a faxed comment list from the consulting structural engineer requesting revisions. JCM
Routing - PLUMBING2/10/2006 2/14/2006 FAIL
secondary roof drainage required.
Routing - Erosion and Sediment2/10/2006 2/10/2006 PASS
ESC plan approved with attached conditions.
Routing - PUBLIC WORKS2/8/2006 2/10/2006 FAIL
Plans for construction of public sewer must be submitted separately to Public Works and approved prior to Public Works sign off on building plans. Contact Jim Pardy ###-####
Routing - PLANNING Land Div2/6/2006 2/8/2006 PASS
property was a annexed into the city in 2004 and was a buildable lot in the county prior to Jan. 1, 1985.
Plans ACCEPTED BY PLAN TECH  2/6/2006  
Plan routing begun/NEW & ADDTN  2/6/2006  
Application received  2/3/2006  
Recd Pcfee & Taken To Pln CK  2/3/2006  
Third Notice BLD5/25/20075/25/2007   
Second Notice has not been responded to.
Fee Review-notes2/3/20062/3/2006