Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD06-00277
StatusFinaled
Name JR CONSTRUCTION
Site Address 825 W BROAD ST
Project Name8TH STREET MARKETPLACE
Customer Number 
ePlanReviewNo
Description
(8TH STREET WINE COMPANY)(8TH STREET MARKETPLACE) RCE-845 / To remodel an existing 4,726 sq.ft. restaurant for a new resturant tenant, wine bar and accompanying retail sales per approved plans. Work to include remodel of basement and first floor, selective demolition, construction of interior partitions, installation of new type one hood system and related kitchen equipment, construction of a new exterior raised wood patio, construction of new bar, installation of new lighing system and related interior finishes. This building is fully fire sprinkled. Any alterations to the sprinkler system shall be per NFPA #13 as regulated by the fire department. Rmh
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Telephone call  10/23/2007 DONE
tlk to eric about the final values and faxed him the sheet to fill out-I gave him intil Monday to respond or goes to supervisor 10:00 am
Telephone call  10/22/2007  
tlk again with JR regarding the permit he said that eric was supposed to call me today now it is 4:00 pm and no calls yet from him. Jr will be calling me again Wed to get this permit closed.
Telephone call  10/19/2007  
tlk to jr construction concerning the cov that I needed - he was going to contact the winery place to get the values - 4:10 pm
Second Notice BLD8/2/20068/2/20068/18/2006 DONE
First Notice has not been responded to.
First Notice 7/18/20068/2/2006 DONE
BLD-Final7/17/20067/18/20067/18/2006APASS
DetailsDave Hannah
eric ; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley ok for perm occ
Permanent Occupancy 7/18/20067/18/2006 DONE
Details
Permanent occupancy  7/18/2006 DONE
Perm. Occ. Cert. # 11137 issued 7-18-06 to the 8th Street Wine Company.
BLD-Final7/14/20067/14/20067/17/2006PPART
DetailsDave Hannah
eric; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley ok for temp occ but needs one more hand rail into basement
FIRE-Final Inspection7/12/20067/14/20067/14/2006APASS
DetailsTroy Cobbley
Life safety finaled. The two doors that access the exterior patio are still a issue. George Slane is researching the issue still. Per George I'm to let the structural inspector address the issue, with George's decision at the building final.
BLD-Framing/Rough-in4/14/20064/17/20064/17/2006APASS
DetailsDave Hannah
eric; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
BLD-Framing/Rough-in4/13/20064/13/20064/14/2006PPART
DetailsDave Hannah
ERIC; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles int walls ok to cover
Telephone call  3/16/2006 DONE
Returned phone message with Cathy. Clarified resubmittal requirements; (as acceptable) as noted on review comments.
Print Occupancy Form  3/15/2006  
Telephone call  3/15/2006  
Left message with Andrew Erstad ###-#### to pick up permit 3-15-06 eus
Permit Ready to Issue  3/15/2006  
Print Occupancy Form  3/15/2006 DONE
Issue PAID IN FULL permit  3/15/2006  
PLANS/APPL TAKEN TO FRONT DESK  3/14/2006 DONE
Print Occupancy Form  3/14/2006  
Plan assigned to (R_H)2/8/2006 3/14/2006 PASS
3/14/2006 14:19:59 RMH - activity updated through activity BLDA022 from case BLD06-00277.
Routing - FIRE3/10/2006 3/13/2006 PASS
Attached review comments to plans. Faxed comments to architect.
Routing - PLAN CHECK2/27/2006 3/10/2006 PASS
Plan resubmittals received  3/8/2006  
Received 1 review , 1 review for plumbing, 1 guard rail calc, 3 review comments,1 structural calc, & 3 copys of sheets A3.11,A2.21,A2.11 & 4 copys of sheets A2.11 Taken to Ron H.
Telephone call  3/6/2006 DONE
Discussed with Pat, of Tikker engineering, the request of locating the manual pull station to the hood suppression system at the kitchen exit door which is within the minimum 10 feet required by code. After discussion with Sam Rogers, we determined that the request would be granted based on the confirmation of a compliant exit sign and emergency lighting above the intended egress door.
Routing - FIRE2/22/2006 2/27/2006 FAIL
Faxed resubmittal items to architect. Attached review comments to plans.
1st review completed  2/27/2006 FAIL
Failed Plan Check and Fire.
Routing - PLANNING2/22/2006 2/22/2006 PASS
Approved.
Case Summary (BLD)  2/22/2006 DONE
Routing - PLAN CHECK2/14/2006 2/22/2006 FAIL
Faxed corrections to the Architect, routed plans to the Marty for review of exterior deck, 2-22-06,
Routing - PLUMBING2/9/2006 2/14/2006 PASS
indirect waste E-22. verify water heater sizing per CDHD. additional cross connection protection may be required.
Routing - PUBLIC WORKS2/8/2006 2/9/2006 PASS
Application received  2/3/2006  
Pending Assignment by MYS2/3/2006 2/3/2006 DONE
2/3/2006 15:02:08 B_S - activity updated through activity BLDA165 from case BLD06-00277.
Recd Pcfee & Taken To Pln CK  2/3/2006  
Plans ACCEPTED BY PLAN TECH  2/3/2006  
Third Notice BLD8/18/20068/18/2006   
Second Notice has not been responded to.
Fee Review-notes2/3/20062/3/2006   
Routing - PLAN CHECK3/13/2006