Print Occupancy Form | | | 7/13/2010 | | DONE |
|
|
|
|
Permanent Occupancy | | | 7/13/2010 | | DONE |
|
|
|
|
Zoning Approval | 7/12/2010 | 7/12/2010 | 7/12/2010 | | DONE |
Sarah Schafer
|
|
|
No Design Review or Current Planning approval needed as it is not within a DR overlay and is an allowed use in the zone.
|
Telephone call | | | 7/12/2010 | | DONE |
Barbara Stitt
|
|
|
Called Steve Sandmeyer at Idaho Hellicopter (###-####) gave him the ACHD information from Breann (BSPR-06-14 OUR file number) and asked him to call and schedule his inspection with them so we can issue this occupancy this permit
|
BLD-Final | 6/16/2010 | 6/16/2010 | 6/16/2010 | P | PASS |
Jim Storey
|
|
|
final ok please send co to client.
|
FIRE-Final Inspection | 6/14/2010 | 6/14/2010 | 6/16/2010 | P | PASS |
Forrest France
|
|
|
Fire life safety final approved, inspection passed. Two new hydrants verified. Missing inspection record for signatures on site.
|
PubWorks Occupancy Approval | 6/15/2010 | 6/15/2010 | 6/15/2010 | | DONE |
Tiffany Lowery
|
|
|
|
BLD-Conference | 6/14/2010 | 6/14/2010 | 6/14/2010 | A | PASS |
Jim Storey
|
|
|
reviewed landing and ramp layout. ok to to place concrete.
|
Print Occupancy Form | | | 6/14/2010 | | DONE |
|
|
|
|
BLD-Conference | 6/10/2010 | 6/10/2010 | 6/10/2010 | P | PASS |
Jim Storey
|
|
|
reviewed landings at doors and ada accessable route.
|
BLD-Aging Inspection | 4/19/2010 | 4/19/2010 | 4/19/2010 | | PASS |
Jim Storey
|
|
|
admin. boise city
|
BLD-Aging Inspection | 2/12/2010 | 2/12/2010 | 2/17/2010 | | PEND |
Jim Storey
|
|
|
admin. boise city
|
BLD-Conference | 10/29/2009 | 12/7/2009 | 12/7/2009 | A | PEND |
Jim Storey
|
|
|
check back w/bob and jgillaland as to how they want to proceed/ see if fire has permit . told bob he was going to address this with fire and jig
|
PRINT Activities | | | 11/12/2009 | | DONE |
|
|
|
|
BLD-Conference | 9/18/2009 | 10/19/2009 | 10/29/2009 | A | PART |
Jim Storey
|
|
|
Idaho helacpter check to see if fire hydrents have been submited for to be installed. united water engineering and fire planreview. if not action will need to be taken agreed to with jgililand/ mark fire/ scott fire. bob siad to give 30 day extention per jgillaland to have fire planreview and fire dept. to follow up. sch conf. for dec..301
|
BLD-Aging Inspection | 9/14/2009 | 9/14/2009 | 9/18/2009 | | PART |
Jim Storey
|
|
|
30 days to check if progess is in the works.
|
BLD-Aging Inspection | 7/13/2009 | 7/13/2009 | 7/13/2009 | | PEND |
Jim Storey
|
|
|
City Attorney's Office is working with the leasee to resolve which entity, Airport or leasee, will be paying for installation of the fire hydrants. Will postpone continuation of enforcement until this issue is resolved. jlg.
|
BLD-Aging Inspection | 5/11/2009 | 5/11/2009 | 5/14/2009 | | FAIL |
Jim Storey
|
|
|
no calls to insp. for corections for occupance of this bld. fire stil outstanding.
|
BLD-Aging Inspection | 2/9/2009 | 2/9/2009 | 2/9/2009 | | PART |
Jim Storey
|
|
|
need landings at exterior exit doors/ need upgrade of ada restrooms in main bulding.
|
Meeting | | | 2/9/2009 | | DONE |
Scott Arellano
|
|
|
Onsite meeting with Owner, contractor, building inspector, and PDS/fire inspector. Two required fire hydrants have not been installed as shown on approved plans. Information relayed to the BFD, Ray Criner.
|
CHANGE STATUS TO (ISS) | | | 2/6/2009 | | DONE |
Barbara Stitt
|
|
|
Per George SLane and Jim Storey///2-6-09 BAS
|
Telephone call | | | 1/26/2009 | | |
Tisha Gallop
|
|
|
phone call from customer said he got notice from fire dept. to contact the city to get final inspection. Refered him to George S. because permit is expired//1/26/09 LEG
|
(F) Reprint permit | | | 1/9/2009 | | DONE |
Alexandra L. DeYoung
|
|
|
|
Case Summary (BLD) | | | 1/9/2009 | | |
|
|
|
|
BLD-Aging Inspection | 4/2/2008 | 4/2/2008 | 4/2/2008 | | PASS |
Jim Storey
|
|
|
105.5 Expiration. Every permit issued shall become invalid unless the work on the site authorized by such permit is commenced within 180 days after its issuance, or if the work authorized on the site by such permit is suspended or abandoned for a period of 180 days after the time the work is commenced. The building official is authorized to grant, in writing, one or more extensions of time, for periods not more than 180 days each. The extension shall be requested in writing and justifiable cause demonstrated.
|
DOC - Permit Expired | 4/2/2008 | 4/2/2008 | 4/2/2008 | P | PASS |
Jim Storey
|
|
|
105.5 Expiration. Every permit issued shall become invalid unless the work on the site authorized by such permit is commenced within 180 days after its issuance, or if the work authorized on the site by such permit is suspended or abandoned for a period of 180 days after the time the work is commenced. The building official is authorized to grant, in writing, one or more extensions of time, for periods not more than 180 days each. The extension shall be requested in writing and justifiable cause demonstrated.
|
BLD-Aging Inspection | 1/29/2008 | 1/29/2008 | 2/1/2008 | | DEFR |
Jim Storey
|
|
|
to fire
|
BLD-Aging Inspection | 11/29/2007 | 11/29/2007 | 11/29/2007 | | DEFR |
Jim Storey
|
|
|
need fire final insp.
|
BLD-Aging Inspection | 9/14/2007 | 9/14/2007 | 9/14/2007 | | DEFR |
Jim Storey
|
|
|
pending requist to final no fire aproval on record.
|
Print Occupancy Form | | | 6/18/2007 | | DONE |
|
|
|
|
BLD-Aging Inspection | 4/17/2007 | 4/17/2007 | 4/18/2007 | | NR |
Jim Storey
|
|
|
wip
|
BLD-Aging Inspection | 1/8/2007 | 1/8/2007 | 1/8/2007 | | DEFR |
Jim Storey
|
|
|
to ele pending isues.
|
BLD-Aging Inspection | 11/7/2006 | 11/7/2006 | 11/7/2006 | | PASS |
Jim Storey
|
|
|
ncfi
|
BLD-Aging Inspection | 9/6/2006 | 9/6/2006 | 9/6/2006 | | NR |
Jim Storey
|
|
|
pending plan review
|
BLD-Aging Inspection | 7/6/2006 | 7/6/2006 | 7/6/2006 | | PASS |
Jim Storey
|
|
|
pending plan review.
|
BLD-Concrete | 5/4/2006 | 5/5/2006 | 5/5/2006 | A | PASS |
Jim Storey
|
|
|
DAVE; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
BLD-Footing | 4/20/2006 | 4/21/2006 | 4/21/2006 | P | FAIL |
Jim Storey
|
|
|
jason; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles sewer line and ele under pad ft. need to be addressed by egnineer.
|
(F) Reprint permit | | | 4/20/2006 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 4/19/2006 | | DONE |
|
|
|
|
Routing Off Site - STRUCTURAL | 3/28/2006 | | 3/29/2006 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 3/29/2006 | | 3/29/2006 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/29/2006 | | DONE |
|
|
|
|
Print Occupancy Form | | | 3/29/2006 | | |
|
|
|
|
Permit Ready to Issue | | | 3/29/2006 | | DONE |
|
|
|
|
Telephone call | | | 3/29/2006 | | DONE |
|
|
|
called ###-#### and left message for Pat w/Camilla that permit is ready, fee, and need GC and ACHD
|
Plan assigned to (MLO) | 2/10/2006 | | 3/29/2006 | | PASS |
|
|
|
3/29/2006 11:27:48 MLO - activity updated through activity BLDA022 from case BLD06-00306.
|
Plan resubmittals received | | | 3/28/2006 | | DONE |
|
|
|
response for structural correction
|
Plan resubmittals requested | | | 3/27/2006 | | DONE |
|
|
|
structural correction
|
Routing Off Site - STRUCTURAL | 3/22/2006 | | 3/27/2006 | | FAIL |
|
|
|
corrections sent to architect
|
Routing - PLAN CHECK | 3/22/2006 | | 3/22/2006 | | PEND |
|
|
|
|
Routing - PLAN CHECK | 3/21/2006 | | 3/22/2006 | | PEND |
|
|
|
pending structural approval
|
Routing - Erosion and Sediment | 3/22/2006 | | 3/22/2006 | | PASS |
|
|
|
ESC plan approved with attached conditions.
|
Plan resubmittals received | | | 3/21/2006 | | DONE |
|
|
|
Received 1 response,1 start up for special inspections,3 plan check comments,1 erosion & sediment control applications, 2 storm water drainage system o & m 's, 2 erosion & sediment control narritives, 3copys of sheets S0,S1,S2,S3,S4,S5, 1 copy of sheet A2.0 & 2 copys of sheet ESC1.0 Taken to Mike O.
|
Routing - FIRE | 3/1/2006 | | 3/6/2006 | | PASS |
|
|
|
Attached review comments to plans. Faxed comments to architect.
|
Telephone call | | | 3/6/2006 | | DONE |
|
|
|
Requested United Water flow information from Matthew Witt.
|
1st review completed | | | 3/6/2006 | | FAIL |
|
|
|
Failed Erosion Soil Control.
|
Routing - PLAN CHECK | 3/6/2006 | | 3/6/2006 | | PEND |
|
|
|
waiting for resubs
|
Plan resubmittals requested | | | 3/1/2006 | | DONE |
|
|
|
IBC corrections
|
Routing - PLAN CHECK | 2/15/2006 | | 2/28/2006 | | FAIL |
|
|
|
corrections sent to architect
|
Routing - PLANNING | 2/14/2006 | | 2/15/2006 | | PASS |
|
|
|
Sara S. Use is allowed in the zoning without any further zoning approvals.
|
Routing - PLUMBING | 2/14/2006 | | 2/14/2006 | | PASS |
|
|
|
no plumbing
|
Routing - Erosion and Sediment | 2/14/2006 | | 2/14/2006 | | FAIL |
|
|
|
No esc permit application, plan waiver or plan attached. Informed applicant.
|
Routing - PUBLIC WORKS | 2/10/2006 | | 2/14/2006 | | PASS |
|
|
|
|
Routing - PLANNING Land Div | 2/10/2006 | | 2/10/2006 | | PASS |
|
|
|
parcel is larger than five acres.
|
Plans ACCEPTED BY PLAN TECH | | | 2/10/2006 | | |
|
|
|
|
Plan routing begun/NEW & ADDTN | | | 2/10/2006 | | |
|
|
|
|
Fee Review-notes | 2/8/2006 | 2/8/2006 | 2/8/2006 | | DONE |
|
|
|
|
Application received | | | 2/8/2006 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 2/8/2006 | | |
|
|
|
|
Routing Off Site - STRUCTURAL | 2/10/2006 | | 2/6/2006 | | FAIL |
|
|
|
corrections sent to architect
|