PER UNICO EXCEMPT BECAUSE THEY ARE THE PROPERTY OWNER OF US BANK PLAZA 3/7/06/MLS (QUANE SMITH)(US BANK-16TH FLR) To remodel a 9,519 sq.ft. office area located on the 16th floor per approved plans. Work to include, selective interior nonbearing demolition, construction of new noncombustible partitions to create individual office spaces, breakroom, small conference rooms, reception area, and open office areas, installation of a new suspended ceiling system related lighting, miscellaneous related interior finishes. This building is fully fire sprinklered any alterations to the sprinkler system shall be per NFPA #13 as regulated by the fire department.. Rmh
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  7/2/2013 DONE
BLD-Final8/8/20068/8/20068/8/2006PNR
DetailsDave Hannah
Scheduled by a contractor via Hello! on 8/8/2006 at 8:53:57 AM. Contact: ###-####.
FIRE-Final Inspection8/8/20068/8/20068/8/2006PPASS
DetailsForrest France
Fire life safety inspection passed.
BLD-Final8/7/20068/8/20068/8/2006ACANC
DetailsDave Hannah
Scheduled by a contractor via Hello! on 8/7/2006 at 10:32:21 AM. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on Aug 8 2006 7:28AM.
FIRE-Final Inspection8/7/20068/8/20068/8/2006ACANC
DetailsForrest France
Scheduled by a contractor via Hello! on 8/7/2006 at 10:31:37 AM. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on Aug 8 2006 7:27AM.
BLD-Framing/Rough-in7/28/20067/28/20067/28/2006PPART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 7/28/2006 at 7:12:10 AM. Contact: ###-####. ceiling grid ok to cover
BLD-Final6/27/20066/28/20066/28/2006PPART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 6/27/2006 at 2:48:05 PM. Contact: ###-####. ok to move into ph b
FIRE-Final Inspection6/27/20066/28/20066/28/2006PPART
DetailsForrest France
Partial inspection for phase 2 of the floor remodel is satisfactory.
BLD-Framing/Rough-in6/19/20066/20/20066/20/2006APASS
DetailsDave Hannah
Scheduled by a contractor via Hello! on 6/19/2006 at 8:51:09 AM. Contact: ###-####.
BLD-Framing/Rough-in6/7/20066/8/20066/8/2006APART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 6/7/2006 at 11:02:47 AM. Contact: ###-####. ok to cover walls
BLD-Final5/17/20065/18/20065/18/2006PNR
DetailsDave Hannah
Scheduled by a contractor via Hello! on 5/17/2006 at 2:16:59 PM. but ok to occ phase one
FIRE-Final Inspection5/17/20065/18/20065/18/2006APART
DetailsForrest France
Life safety inspection for the west half of the floor remodel is acceptable.
BLD-Framing/Rough-in5/1/20065/2/20065/2/2006APART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 5/1/2006 at 11:42:07 AM. Contact: ###-####. ceiling grid ok
BLD-Framing/Rough-in3/14/20063/14/20063/14/2006PPASS
DetailsDave Hannah
Scheduled by a contractor via Hello! on 3/14/2006 at 8:33:32 AM. Contact: ###-####.
Issue PAID IN FULL permit  3/7/2006  
Permit Ready to Issue  3/3/2006  
Print Occupancy Form  3/3/2006 DONE
Telephone call  3/3/2006  
Left message with Cory Nelson ###-#### to pick up permit 3-3-06 eus
PLANS/APPL TAKEN TO FRONT DESK  3/2/2006 DONE
Plan assigned to (R_H)2/13/2006 3/2/2006 PASS
3/2/2006 13:47:59 RMH - activity updated through activity BLDA022 from case BLD06-00317.
Routing - FIRE2/27/2006 2/28/2006 PASS
Faxed review comments to architect. Attached comments to plans.
1st review completed  2/28/2006 PASS
Case Summary (BLD)  2/27/2006 DONE
Routing - PLAN CHECK2/13/2006 2/27/2006 PASS
No corrections required by plan review. Routed plans to fire, permit pending fire departments review and approval.
Routing - PUBLIC WORKS2/13/2006 2/13/2006 PASS
Application received  2/9/2006  
Recd Pcfee & Taken To Pln CK  2/9/2006  
Plans ACCEPTED BY PLAN TECH  2/9/2006  
Fee Review-notes2/9/20062/9/2006   
Routing - PLAN CHECK2/28/2006