Case Summary (BLD) | | | 11/6/2015 | | DONE |
|
|
|
|
Third Notice BLD | 5/25/2007 | 5/25/2007 | 10/4/2007 | | DONE |
|
|
|
Second Notice has not been responded to.
|
Second Notice BLD | 5/9/2007 | 5/9/2007 | 5/25/2007 | | DONE |
|
|
|
First Notice has not been responded to.
|
First Notice | | 4/23/2007 | 5/9/2007 | | DONE |
|
|
|
|
Permanent occupancy | | | 4/23/2007 | | DONE |
|
|
|
Perm. Occ. Cert. # 11541 issued 4-23-07 to Moore, Smith, Buxton & Turcke
|
Permanent Occupancy | | 8/15/2006 | 8/15/2006 | | DONE |
|
|
|
|
BLD-Final | 6/6/2006 | 6/7/2006 | 6/7/2006 | P | PART |
Dave Hannah
|
|
|
gregg; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley ok for temp occ ok for perm occ after elec and mec sign perm
|
FIRE-Final Inspection | 6/6/2006 | 6/7/2006 | 6/7/2006 | A | PASS |
Forrest France
|
|
|
The required corrections have been made and verified for completion, fire life safety passed inspection.
|
BLD-Final | 6/5/2006 | 6/6/2006 | 6/6/2006 | P | CANC |
Dave Hannah
|
|
|
GREG; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
FIRE-Final Inspection | 6/5/2006 | 6/6/2006 | 6/6/2006 | A | FAIL |
Forrest France
|
|
|
Need to provide a fire extinguisher with current tag installed as discussed, one exit sign is blocked and will need to be relocated, door hardware at one location will need to be changed, still need to test emergency lighting for the path of egress.
|
BLD-Final | 5/26/2006 | 5/30/2006 | 5/31/2006 | P | NR |
Dave Hannah
|
|
|
greg 5th floor; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles needs fire life saftey final
|
FIRE-Final Inspection | 5/26/2006 | 5/30/2006 | 5/30/2006 | A | CANC |
Troy Cobbley
|
|
|
greg 5th floor; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
BLD-Final | 5/25/2006 | 5/26/2006 | 5/26/2006 | P | NR |
Dave Hannah
|
|
|
greg; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
FIRE-Final Inspection | 5/25/2006 | 5/26/2006 | 5/26/2006 | A | NR |
Forrest France
|
|
|
No inspection done, the project related fire sprinkler permit must be requested for final inspection and approval before BLD life safety final can be granted.
|
BLD-Framing/Rough-in | 5/22/2006 | 5/23/2006 | 5/24/2006 | P | PART |
Dave Hannah
|
|
|
greg; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles ok to cover both sides of walls
|
FIRE-Conference | 4/26/2006 | 4/27/2006 | 4/27/2006 | A | DONE |
Forrest France
|
|
|
On site confrence to discuss field modification of office wall partition layout and the affected sprinkler, alarm notification, and exiting issues.
|
Routing - FIRE | 4/5/2006 | | 4/7/2006 | | PASS |
|
|
|
Attached reveiw comments to plans. Faxed review comments to architect.
|
Routing - PLAN CHECK | 4/7/2006 | | 4/7/2006 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/7/2006 | | DONE |
|
|
|
|
Print Occupancy Form | | | 4/7/2006 | | DONE |
|
|
|
|
Telephone call | | | 4/7/2006 | | DONE |
|
|
|
tlk to amy to let you know that permit and fees are ready to be picked up
|
Permit Ready to Issue | | | 4/7/2006 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 4/7/2006 | | DONE |
|
|
|
|
Plan assigned to (CJW) | 2/13/2006 | | 4/7/2006 | | PASS |
|
|
|
4/7/2006 09:48:05 CJW - activity updated through activity BLDA022 from case BLD06-00324.
|
Routing - PLAN CHECK | 3/16/2006 | | 4/5/2006 | | PASS |
|
|
|
(3-16-06) Drawings on hold until alternate is approved. (4-5-06) The alternate was approved.
|
Plan resubmittals received | | | 3/16/2006 | | |
|
|
|
Received 1 transmittal, 5 letters for Carl W. & 2 copys of sheets G-01,AF-106,A-105,A-106,A-201,A-301,A-302,A-304 taken to Carl W
|
Routing - FIRE | 3/8/2006 | | 3/16/2006 | | FAIL |
|
|
|
Failed pending approval of combustible tenant wall construction by building official. (3-17-06) The completed date was altered to show when it actually came back to Plan Check. CJW
|
1st review completed | | | 3/13/2006 | | FAIL |
|
|
|
Failed Fire.
|
Plan resubmittals received | | | 3/7/2006 | | DONE |
|
|
|
An alternative construction request was submitted to Jenifer Gilliland.
|
Routing - PLAN CHECK | 2/14/2006 | | 3/7/2006 | | FAIL |
|
|
|
The IBC plan review was started on March 7, 2006 and was finished the same day. Additional information and revised drawings were required. See the plan review report.
|
Plan Reviewer's activity | | | 3/6/2006 | | |
|
|
|
Received a request for an alternate to the code. Waiting for a resolution.
|
Routing - PUBLIC WORKS | 2/13/2006 | | 2/14/2006 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 2/10/2006 | | |
|
|
|
|
Application received | | | 2/9/2006 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 2/9/2006 | | DONE |
|
|
|
|
Fee Review-notes | 2/9/2006 | 2/9/2006 | | | |
|
|
|
|